Not exact matches
Throughout the exhibition, the gallery will also function as a performative studio; using the space to
create visual essays
created from darkroom
test prints, which comprise part of the video
installation.
On Tower Level 5, Wong Ping
creates a multimedia
installation centered on a colorful, racy animated tale that explores the tension between an aging population and the relentless pace of a digital economy; in her paintings and sculptures, Duan Jianyu depicts a surreal, transitory place where the rural meets the urban; and Lin Yilin constructs a virtual - reality simulation featuring a professional basketball star,
testing the potential for using technology to inhabit the experience of another.
For the DRAF, Gifford
creates new in - situ
installations in the gallery that prior to the opening reception, will become her studio, her
testing ground, her stage and her mental space.
On the occasion of the exhibition «
Testing the Limits», Rickard will
create three site - specific
installations that will engage directly with the three rooms that form the Nunnery Gallery.
In 2005 Rachel Whiteread
created her
installation EMBANKMENT, followed by Carsten Höller's interactive spiralling slides
Test Site in 2006.
The resulting work transforms painting and sound and
creates a moving temporal
installation,
testing the boundaries between image and sound; Pärt's choral work echoed through the gallery, sung by a choir that stood among us.
The Environmental Security and Technology Certification Program uses military
installations as a
test bed to demonstrate and
create a market for innovative energy efficiency and renewable energy technologies coming out of the private sector and DoD and Department of Energy laboratories.
Along with
testing concentrated solar power, solar photovoltaic
installations will also be added, and researchers will focus on
creating polymers to protect the panels from extreme conditions like high temperatures and dust.
Successful resume samples for the job mention duties like developing solar power materials, building plants, inspecting engineering sites, implementing solar
installation projects, performing computer simulation, running
tests, implementing safety standards, and
creating operation procedures.
• Review blueprints to provide the best plumbing solutions •
Create plans and drawings using Sharepoint to prioritize sequence of
installation and repair work • Identify tools and procedures needed for different plumbing activities • Implement plumbing systems according to the required plan •
Test the system to check for leakages and fix leakages
Professional Experience Vision Appraisal Technology (Northborough, MA) 03/2004 — Present Information Technology Analyst -LRB-[Insert Dates in Role]-RRB- • Provide network, desktop, printer, hardware, software, printing, peripherals devices, and application support to front - end users within a data center environment, assisting remote users with network / VPN connectivity issues • Execute various active directory tasks including both adding and deleting users and groups as well as setting up shared areas for controlled data access • Verify the successful back - up of servers as well as the deployment of anti-viral applications and system updates • Perform Oracle DBA tasks, including software
installations, patching, backups, and upgrades, while
creating Oracle production and cloning environments for
testing and software development • Aid in the upgrade, migration, and management of servers, while participating heavily in any infrastructure changes • Maintain hardware asset control inventory as well as provide FTP, website, and intranet administration •
Create standard desktop images to decrease software application re-
installation time and develop documentation for both
installation and back - up procedures • Deploy new desktop and laptop devices to end - users with enterprise applications accommodating specific user job functions
General Electric (Stamford, CT) 2007 — 2008 Corporate Consultant — Infrastructure Systems & Network • Designed, developed, and engineered GE Treasury system's development, QA, Production, and DR environment • Hardware: Sun Fire V220, V480, V880, V1290, V6140, V6800, V6920; Sun Enterprise T2000, T5120 (Solaris 10: LDOMS, ZFS, RAID, Zoans, Containers), E10K, E15K, E25, M4000, M8000, M9000; HP ProLiant with Linux 5.0 (EMC and 3 PAR SAN) • Built servers from racking, cabling (Ethernet / fiber), connecting to network, setting serial connection to Avocent ports, and setting up server to the network through DNS • Performed massive
installation of Solaris servers using both Jumpstart and Blade Logic and Red Hat using both PXE boot and BladeLogic servers to global distributed network of more than 6000 servers • Installed and configured Solaris 10 OS, recommended patches, hardening software, LDOMS, ZFS, and Container on Sun server • Installed and configured Emulex LPFC, EMC Power path, Navisphere, Veritas Volume Manager, Veritas Cluster Server, Veritas Volume Replicator, and Veritas Net Backup in heterogeneous environment • Partitioned and mirrored disks using Solaris LVM, disk suites, Veritas VxVM, mirrored root file system and set up alternate boot device and dump device • Installed application software for ITG, IDM, and Tibco etc. •
Created and adjusted Oracle projects on oracle 9i and 10g • Configured operating systems, LDOMS, ZFS, RAID, network Multi Pathing, Cisco Switch 6309, Brocade Switch, EMC DS41000 fiber switch, EMC, 3 PAR and HITACHI SAN, DNS, NIS, NIS plus, LDAP •
Created LUNs for EMC, 3 PAR, HITACHI SAN and set up RAIDS •
Created zoning of Cisco 6309 switch • Provided connectivity of Ethernet ports and fiber channel by patching Ethernet ports from server panel to switch, and by patching fiber from server to Brocade switch then to EMC DS41000 switch through Cisco switch6300, 6309, Big IP • Performed alternate boot
testing, crush dump
testing and cluster
testing • Vendor liaison for Cisco, HP, IBM, EMC, Symantec, Oracle Sun, and Red hat Linux resolving hardware and software issues • Scheduled changes and upgrades communicating with business owners and support team • Architected Disaster Recovery System conducted
testing and resetting the systems as needed • Performed zoning and provisioning configured EMC / Power path LUNs on UNIX servers upon client's request • Resolved issues with NIS, NIS +, DNS, VxVM and VCS among other SA tasks •
Created network topology of the internet and intranet security environment using Visio 7.5
• Managed information gathering, analysis, and documentation of the functional / business requirements including
test cases and use cases of the business process • Led process to acquire and implement software and hardware needs • Worked with IT for
installation, implementation, and migration of legacy data into new system • Developed promotional roadmap to identify promotional successes •
Created, developed, and executed reporting for KPIs, ROIs and user behavior insights • Implemented site improvements based off data from MV and AB
testing improving conversions by 15 %