Sentences with phrase «critical design review»

Responsible for critical design review presentation for customer.
The progress comes three months after the space agency's Critical Design Review Board approved Boeing's blueprint for a crewed low - Earth orbit (LEO) vehicle and it follows on the heels of -LSB-...]
Tagged: Boeing Cape Canaveral Air Force Station CDR Commercial Crew Program Critical Design Review CST - 100 Starliner Earth Science Kennedy Space Center United Launch Alliance United States Air Force
The James Webb Space Telescope passes its Mission Critical Design Review, which signifies that the integrated observatory will meet all science and engineering requirements for its mission.
Looking forward, we are well positioned for the next push to critical design review in July 2011.
The mission team, some 120 young Emirati scientists, is now gearing up for a critical design review.
Recently, United Launch Alliance (ULA) successfully completed a Critical Design Review (CDR) of the accommodations at Cape Canaveral's Space Launch Complex 41 -LSB-...]
Boeing» Crew Space Transportation (CST -100) spacecraft has met the necessary requirements needed to pass the «Phase Two Spacecraft Safety Review» as well as the «Critical Design Review» (CDR) of the capsule - shaped spacecraft's integrated systems.
The Band 4 receiver was shipped to Chile through two design reviews (preliminary design review and critical design review) to ensure that they all fulfill the high - level requirements of ALMA.
The sunshield also passes its critical design review, certifying that its design is complete and meets mission requirements.
Recently, United Launch Alliance (ULA) successfully completed a Critical Design Review (CDR) of the accommodations at Cape Canaveral's Space Launch Complex 41 (SLC - 41), slated to host CST - 100's future commercial crew launches.
The next major mission milestone, the critical design review, will examine the detailed MAVEN system design.
Assuming the critical design review is successful, the project team will assemble the spacecraft and its instruments.
April 14th The NEXT - C ion propulsion engine has successfully completed a Critical Design Review conducted by NASA and is planned for use on the agency's 2021 DART (Double Asteroid Redirection Test) mission.
As a member of the Harris team, AER has successfully completed the Critical Design Review and has been approved to begin implementation of the NOAA's Geostationary Operational Environmental Satellite — R Series (GOES - R) Ground Segment.
Ensured requirements traceability and integrity during multiple phases in the SDLC in Preliminary Design Reviews (PDR), Critical Design Reviews (CDR), Test Readiness Reviews (TRR) and Configuration Control Board (CCB) meetings.
Aided in ensuring on time completion of preliminary design reviews, critical design reviews, flight readiness reviews, and means of compliance reviews.
Conducted project Preliminary Design Reviews (PDR) and Critical Design Reviews (CDR) with the customer.
Reviewed / briefed project design / progress with stakeholders during Preliminary and Critical Design Reviews.