Asia - Pacific Petchem Deal of the Year: Pengerang Terminal 2 Advised a consortium of nine lenders on a US$ 1.25 bn financing for the development of a 1.65 million
cubic metre oil storage terminal to support a large integrated refinery complex in Johor, Malaysia sponsored by PETRONAS, Vopak and Dialog.
Not exact matches
[108][109] The 100 % state - owned filling station company of Ghana, Ghana
Oil Company (GOIL) is the number 1 petroleum and gas filling station of Ghana and the 100 % state - owned state oil company Ghana National Petroleum Corporation (GNPC) administrates hydrocarbon exploration and production of Ghana's entire petroleum and natural gas reserves and Ghana aims to further increase output of oil to 2.2 million barrels (350,000 m3) per day and gas to 34,000,000 cubic metres (1.2 × 109 cu ft) per d
Oil Company (GOIL) is the number 1 petroleum and gas filling station of Ghana and the 100 % state - owned state
oil company Ghana National Petroleum Corporation (GNPC) administrates hydrocarbon exploration and production of Ghana's entire petroleum and natural gas reserves and Ghana aims to further increase output of oil to 2.2 million barrels (350,000 m3) per day and gas to 34,000,000 cubic metres (1.2 × 109 cu ft) per d
oil company Ghana National Petroleum Corporation (GNPC) administrates hydrocarbon exploration and production of Ghana's entire petroleum and natural gas reserves and Ghana aims to further increase output of
oil to 2.2 million barrels (350,000 m3) per day and gas to 34,000,000 cubic metres (1.2 × 109 cu ft) per d
oil to 2.2 million barrels (350,000 m3) per day and gas to 34,000,000
cubic metres (1.2 × 109 cu ft) per day.
The Sankofa project is expected to deliver an additional 30,000 barrels per day of
oil and 180 million
cubic feet (5.07 million
cubic metres) per day of gas to Ghana.
The study challenges the estimate by federal officials, based on the amount of
oil on the sea surface, that around 5000 barrels (800
cubic metres) of
oil per day are pouring into the sea from the site where the BP - operated drilling rig Deepwater Horizon was destroyed by fire last month.
Some scientists predicted that the
oil would degrade quickly, but 20 years later, 87
cubic metres of the stuff was found to be sequestered beneath stony beaches, where it continues to kill otters that dig up clams.
Estimates of the amount of
oil they contain vary hugely, but Navigant, a consultancy, reckons that North America could produce anything from 26.9 - 53.5 trillion
cubic metres of shale gas alone, enough to satisfy the world's total current demand for gas for up to 15 years, though at today's prices not all of it would yet be worth extracting.
In 2012 alone, 40 million tons of coal, 12 billion
cubic metres of gas and 8 million litres of
oil, diesel and gas were saved.
The authors drew on available data to establish global reserves at 1,294 billion barrels of
oil, 192 trillion
cubic metres of gas, 728 Gt of hard coal and 276 Gt of lignite.
Sunrise is estimated to hold 240 million barrels of light
oil and 154 billion
cubic metres of natural gas.
Each day more than 300 million
cubic feet (91 million
cubic metres) of natural gas is used to extract the
oil in the
oil sands.
The units of measurement used for each fossil fuel will be the most commonly used units internationally: metric tons (tonnes) for coal,
cubic metres for natural gas and barrels for
oil.
The results suggest the Middle East holds half of total global unburnable
oil and gas reserves, with more than 260 billion barrels of
oil and nearly 50 trillion
cubic metres of gas needing to remain untouched if we're to stay within budget.