They already are recognized by the wind - measurement community as truly operational, maintainable, and reliable tools to deliver bankable results for offshore and onshore wind - feasibility studies and warranted power -
curve verification tests.
For offshore wind farms, delivering contractual power
curve verification tests according to IEC 61400 -1-12 standards remains highly impractical.
In 2015, MHI Vestas Offshore Wind ran a power -
curve verification test campaign at the Østerild site to collect the data and experience needed for the preparation of their commercial offering.
Not exact matches
This power
curve verification campaign demonstrated that Lidar - based power
curve testing was as accurate as mast - based campaigns.