Meeting
demand during such periods without huge load shedding would require building huge wind / solar capacity which would almost never be used in order to slightly reduce the chances of grid collapse.
Not exact matches
In contrast, export volumes decreased over this
period, despite strong global
demand, as capacity and infrastructure constraints and supply disruptions restricted growth;
such supply - side factors have hampered exports for a number of years, with resource export volumes now lower than
during 2000 (see the chapter entitled «Australia's Resource Exports — Recent Trends and Prospects» in this Statement).
Among the important factors that could cause Rio Tinto's actual results, performance or achievements to differ materially from those in the forward - looking statements include, among others, levels of actual production
during any
period, levels of
demand and market prices, the ability to produce and transport products profitably, the impact of foreign currency exchange rates on market prices and operating costs, operational problems, political uncertainty and economic conditions in relevant areas of the world, the actions of competitors, activities by governmental authorities
such as changes in taxation or regulation and
such other risk factors identified in Rio Tinto's most recent Annual Report on Form 20 - F filed with the United States Securities and Exchange Commission (the «SEC») or Form 6 - Ks furnished to the SEC.
While pedagogical excellence begins
during training, the
demands of the public sector are
such that the transformation often associated with Montessori professional formation requires an extended
period of apprenticeship supported by a professional community that is equipped to induct novices through modeling, collaborative child and lesson study, and ongoing reflection, coaching, and targeted professional development.
On the other hand, waiting for a last minute deal makes much more sense if you plan to travel
during periods of lighter
demand,
such as April or May, when travel providers are more likely to unload their excess inventory at big discount.
Auxiliary generator: A generator at the electric plant site that provides power for the operation of the electrical generating equipment itself, including related
demands such as plant lighting,
during periods when the electric plant is not operating and power is unavailable from the grid.
Large commercial and industrial customers sometimes obtain interruptible rates, which provide a discount in return for the consumer's agreement to cut electric loads upon request from the utility (usually
during critical
periods,
such as summer afternoons when the system
demand approaches the utility's generating capability).
It allows renewable sources
such as wind and solar power to operate at full capacity
during peak generation
periods by storing excess energy until it is needed to meet later
demand.
Monthly data allow users to see seasonal patterns,
such as
periods of nuclear refueling outages in the shoulder seasons (spring and fall) and increased operation of peaking generators
during the
periods of highest electricity
demand in the summer months (driven primarily by air conditioning use).
Other provisions in the act —
such as tax incentives that encourage the adoption of energy - efficient technologies, a shift to more combined heat and power generation, and the adoption of real - time pricing of electricity (a measure that will discourage optional electricity use
during peak
demand periods)-- would cut electricity
demand enough to avoid building an additional 37 coal - fired power plants.
Energy storage can save power generated from clean energy systems
such as solar, wind and combined heat and power (CHP) for later use, enabling buildings to reduce their reliance on the power grid
during peak
demand periods when electricity rates are the highest.
As host Member States may not
demand from EU citizens in this first
period to have sufficient means of subsistence and personal medical cover, it is legitimate, according to the Court, not to require those Member States to be responsible for those citizens
during this Following explicitly the opinion of the Advocate - General,
such an interpretation would meet the objective stated in recital 10 of the Directive to maintain the «financial equilibrium of the social assistance systems of the Member States» (para. 45).
Pre-leasing activity
during the same
period also underlines the presence of latent
demand for large, single owned accommodation in locations
such as the CBD, DIFC and TECOM (A & B).