Sentences with phrase «determining materials and labor»

Not exact matches

Compete with that structure planning and control: 1) to determine the level of resources needed to achieve the desired standard of performance of each system in terms of raw materials, supplies, labor, financial resources, etc..
Determined status / updates (earned value) procedures and contract baseline changes for Solid Rocket Booster tasks which included material purchasing, travel, and labor financial account validation.
Industrial engineers work in the manufacturing arena where they are expected to determine diverse ways of increasing productivity in terms of labor, technology, materials and other matters governing the industry.
• Review relevant data to determine cost of materials and requirements for labor.
Lead Civil Engineer — Land Development Solutions — Denver, Colorado — September 2011 — March 2015 • Supervised the civil engineering development team in the implementation of new projects • Used specialized tools such as AutoCAD, Trimble Terramodel, and Primavera P6 Professional • Calculated requirements used in the plan and design of civil work according to specifications • Ensured safety and compliance standards were met by monitoring and assessing risk factors • Forecasted the quantity, budget, and cost of engineering equipment, labor, and manpowerCivil Engineer — UWV Foundation — Cheyenne, Wyoming — July 2000 — April 2006 • Completed site surveys and analyzed data • Researched, assessed, and studied patterns of elements and environmental conditions to determine adequacy of relevant factors • Ensured compliance with safety standards and managed risk factors • Tested strength of various foundation materials, introducing 25 - percent stronger materials • Developed solutions to safely address challenges involving extreme weather patterns
• Remodel an entire 4 story building by installing new tiles in every room, within the provided deadline of 32 days • Shape tile fixing into an 8 feet mural depicting the Aztec Civilization, for a school project • Train 19 apprentices in handling tile and marble setting duties, within a short time span of 28 months • Confer with clients to determine their tile setting and designing requirements • Provide information regarding available tile designs and associated costs • Assess the amount of labor and material needed for each tiling project • Contact tile vendors to determine availability of tiles and assist clients in choosing the right types of tiles • Cut and shape tiles to fit obstacles and in odd spaces by making effective use of hand and power tools • Set tiles in patterns or in a straightforward manner, depending on the specific instruction of the client
Construction Superintendent, November 2005 to June 2009 Harthouse Construction Company - New Cityland, CA • Produced construction project budgets by conducting cost estimates and determining necessary resources, materials and labor • Supervised worksite, delegated assignments to workers and directed daily construction • Developed scheduling and construction plans for projects
By using VR to preview and make choices in advance tenants will be able to immediately determine the cost for office buildout and leverage technology that can determine pricing for materials and labor in real - time.
When determining repair estimates, make sure to include materials AND labor needed for the repairs.
a b c d e f g h i j k l m n o p q r s t u v w x y z