Sentences with phrase «develop alternate tests»

Not exact matches

Next, she'd push to diminish the role of standardized testing in the evaluations and develop alternate assessments, such as portfolios of student work for some subjects, she said.
With additional funds, researchers could explore developing a portable, reliable and easy - to - use alternate diagnostic test for MCI that incorporates the body's different senses.
According to TEA, the TELPAS Alternate pilot test is based on alternate Proficiency Level Descriptors (PLDs) that were developed by Texas educators to appropriately determine the progress of English proficiency for students with significant cognitive disaAlternate pilot test is based on alternate Proficiency Level Descriptors (PLDs) that were developed by Texas educators to appropriately determine the progress of English proficiency for students with significant cognitive disaalternate Proficiency Level Descriptors (PLDs) that were developed by Texas educators to appropriately determine the progress of English proficiency for students with significant cognitive disabilities.
A large number are already using testing accommodations and a few are developing alternate assessments.
For students with significant cognitive disabilities, the Center for Educational Testing and Evaluation has developed the Dynamic Learning Maps ® Alternate Assessment System.
Smartronix (CA & MD) 08/2004 — 12/2008 S6 Information Systems Coordinator • Serve as Section Chief and Contract Lead at the MCNOSC providing overall support for the MCNOSC IT Systems • Manage the network, servers, switches, applications, and information and infrastructure security • Utilize DoD applications for network scanning and remediation of the classified and unclassified networks • Develop plans, procedures, and policies to directly support and defend the MCNOSC Network from security threats • Oversee the MCNOSC's PKI (public key infrastructure) and integration with the MCNOSC services with the coordination of recovery strategies with the Alternate Network Operations and Security Center (AltNOSC) • Determine minimum processing requirements for recovery site and provide guidance for recovering infrastructure processing • Provide technical input to the Contingency of Operations (COOP) Plan ensuring all activities, resources and procedures required to recover critical IT infrastructure processing are accurate • Manage the day to day support of the MCNOSC Infrastructure, supervising a team of IT service contractors • Perform complex repairs, upgrades, hardware configuration, and end user training • Serve as project manager for the transition and deployment of the MCNOSC's NMCI plan • Oversee the planning and build out of the network and MCNOSC's new Headquarters and Operations Center • Coordinate with local contractors to ensure timely delivery of the network • Design and coordinate the build out of the MCNOSC Internal Data Center, Server Room, and Testing Lab • Coordinate the movement to the MCNOSC's newly built Operations Center and Head Quarters • Install cabling, servers, racks, environmental controls, a / v systems, and other technical equipment • Develop the MCNOSC IT Lifecycle management for the LAN and other IT devices • Serve as project manager for the MCCDC (Marine Corps Combat Development Center) Studies and Analysis Division and the MCCLL (Marine Corps Center for Lessons Learned)
General Electric (Stamford, CT) 2007 — 2008 Corporate Consultant — Infrastructure Systems & Network • Designed, developed, and engineered GE Treasury system's development, QA, Production, and DR environment • Hardware: Sun Fire V220, V480, V880, V1290, V6140, V6800, V6920; Sun Enterprise T2000, T5120 (Solaris 10: LDOMS, ZFS, RAID, Zoans, Containers), E10K, E15K, E25, M4000, M8000, M9000; HP ProLiant with Linux 5.0 (EMC and 3 PAR SAN) • Built servers from racking, cabling (Ethernet / fiber), connecting to network, setting serial connection to Avocent ports, and setting up server to the network through DNS • Performed massive installation of Solaris servers using both Jumpstart and Blade Logic and Red Hat using both PXE boot and BladeLogic servers to global distributed network of more than 6000 servers • Installed and configured Solaris 10 OS, recommended patches, hardening software, LDOMS, ZFS, and Container on Sun server • Installed and configured Emulex LPFC, EMC Power path, Navisphere, Veritas Volume Manager, Veritas Cluster Server, Veritas Volume Replicator, and Veritas Net Backup in heterogeneous environment • Partitioned and mirrored disks using Solaris LVM, disk suites, Veritas VxVM, mirrored root file system and set up alternate boot device and dump device • Installed application software for ITG, IDM, and Tibco etc. • Created and adjusted Oracle projects on oracle 9i and 10g • Configured operating systems, LDOMS, ZFS, RAID, network Multi Pathing, Cisco Switch 6309, Brocade Switch, EMC DS41000 fiber switch, EMC, 3 PAR and HITACHI SAN, DNS, NIS, NIS plus, LDAP • Created LUNs for EMC, 3 PAR, HITACHI SAN and set up RAIDS • Created zoning of Cisco 6309 switch • Provided connectivity of Ethernet ports and fiber channel by patching Ethernet ports from server panel to switch, and by patching fiber from server to Brocade switch then to EMC DS41000 switch through Cisco switch6300, 6309, Big IP • Performed alternate boot testing, crush dump testing and cluster testing • Vendor liaison for Cisco, HP, IBM, EMC, Symantec, Oracle Sun, and Red hat Linux resolving hardware and software issues • Scheduled changes and upgrades communicating with business owners and support team • Architected Disaster Recovery System conducted testing and resetting the systems as needed • Performed zoning and provisioning configured EMC / Power path LUNs on UNIX servers upon client's request • Resolved issues with NIS, NIS +, DNS, VxVM and VCS among other SA tasks • Created network topology of the internet and intranet security environment using Visio 7.5
a b c d e f g h i j k l m n o p q r s t u v w x y z