Whether it is the outstanding skill in the field of electromobility that Porsche Engineering demonstrated in 2014 in developing the battery for the Porsche 919 Hybrid, our exceptional expertise in the areas of lightweight construction and downsizing or our outside - the - box thinking in
the development of a hospital bed or outdoor barbecue ─ the engineers from Porsche Engineering always bring the same dedication to the highest quality, forward - looking concepts and custom solutions.
Not exact matches
In a related
development a 60 -
bed capacity ultra-modern Bank
of Ghana
Hospital which was completed in 2017, is yet to be put to use although all major equipment and hospital material have been duly in
Hospital which was completed in 2017, is yet to be put to use although all major equipment and
hospital material have been duly in
hospital material have been duly installed.
The Nkosuohene (
Development Chief)
of Lower Axim Traditional Area, Nana Osei Nkwantabisa has donated 48 modern
hospital beds and other medical equipment to the Axim Government Hospital of the Nzema East Municipality of the Western
hospital beds and other medical equipment to the Axim Government
Hospital of the Nzema East Municipality of the Western
Hospital of the Nzema East Municipality
of the Western Region.