Beginning with 2017 models, the front - end and
door frame structure was further reinforced and the side curtain airbags were lengthened, and in cars built after March 2017, both the seat belt pretensioner and frontal and side curtain airbag deployment timing were reprogrammed to further improve occupant protection.
Not exact matches
This results in a very strong front
frame and
door structure for increased protection in a frontal collision.
The body is
structured around the Audi Space
Frame technology used for the R8 and employs carbon - fiber - reinforced plastic for all add - on parts, such as the roof,
doors and sidewalls.
The Traverse is built on a body -
frame integral
structure that allows easy entry and exit, with wide rear
doors and GM's exclusive Smart Slide second - row seat feature to allow smooth entrance to the second - and third - row seats.
Other production chassis
structures in the race car include the windshield
frame, the hoop around the rear of the passenger compartment, the
door hinge pillars, the drivetrain tunnel, the firewall, and the floor pan.
There is no B pillar but instead a space -
frame structure with Gull - wing
doors for access to the rear seat.
Louth: «The race car chassis retains all of the elements in the production chassis
structure — the windshield
frame, the hoop around the rear of the passenger compartment, the
door hinge pillars, the drivetrain tunnel, the firewall, the floor pan — they're all there.
Built on a body -
frame integral
structure that allows for easy entry and exit, it was also engineered to allow a smooth entrance to the second - and third - row seats with wide rear
doors and GM's exclusive Smart Slide second - row seat feature.
The
doors open to reveal the aluminum
structures of the Multimaterial Space
Frame.
The four -
door body was made as an aluminium space
frame structure; less heavy and substantially more rigid than a steel body of equal size.
The car has a custom
frame with no B pillar between the
doors, providing a wide - open interior, which was achieved by integrating the B - pillar
structure into the leading edge of the rear suicide
doors.
Furthermore, the 2016 Pilot adopts the next generation of Honda's Advanced Compatibility Engineering ™ (ACE ™) body
structure along with a new «3 - bone» underbody
frame design and new hot - stamped ultra-high strength steel
door rings.
In addition, the 2016 Pilot adopts the latest generation of Honda's Advanced Compatibility Engineering ™ (ACE ™) body
structure along with a new «3 - bone» underbody
frame design and new hot - stamped ultra-high strength steel
door rings.
In one example of poor
structure, the front pillar of the Nissan Rogue's
door frame was pushed far inside the occupant compartment and after the crash was almost touching the driver seat.
A double - ring rear body /
frame structure for dramatically improved rear body rigidity in a five -
door SUV design (an Acura first)
These include a new double - ring rear body /
frame structure, a world's - first ultra-high strength steel, inner and outer front
door ring design, and Acura's first use of high - performance structural adhesive and RDX's first use of sound - absorbing acoustic spray foam.
Bisecting the room, Zigmund's blockade - like
structures provide a dramatic contrast to the ornate plaster ceiling and carved wooden
door frames of this Greek Revival home.
The main house features a whitewashed oak bed in the middle of the
structures, with the
frame forming the bedroom walls, and privacy screens pocket into the bathroom ceiling in lieu of traditional swinging
doors.
This shell build consisted of a stick
frame structure on a 24 +7 triple axle gooseneck trailer and included a fully finished exterior with a French entry
door, doggie
door, windows, siding, metal roofing, and a roof window (operable skylight) above the master loft.
There are specific regulatory provisions dealing with nearly every aspect of a commercial truck, including: lighting devices and reflectors, brakes, brake performance, tires, emergency equipment, protection against shifting or falling cargo, cargo securement systems (blocking and bracing, tie - downs, fasteners, etc.), front - end
structure,
frames,
doors, hood, seats, bumpers, wheels, sleeper berths, steering wheels and suspensions.
Other responsibilities include installing rough
doors and window
frames, analyzing blueprints and diagrams in order to determine the size of the
structure or measuring materials with the use of a measuring tape or a ruler.
Supervising and assisting a team of five carpenters in constructing and installing wooden
structures and fixtures, including concrete forms, frameworks, partitions, joists, studding, rafters, stairways, windows,
door frames, cabinets, and hardwood floors.
Supervised and assisted 6 carpenters in constructing and installing wooden
structures and fixtures; encompassing concrete forms; building frameworks, including partitions, joists, studding and rafters, wooden stairways; windows and
door frames; and hardwood floors
ACTIVE WORKFORCE, Los Angeles, CA Carpenter 2013 — Present • Design and install wooden partitions,
structure frames, windows and
doors • Fit false ceilings and dry walls based on blueprints • Issue cost estimates for various projects based on floor plans • Cut and build office and home furniture as per design and customer requirements • Repair old furniture, interior, and exterior woodwork • Build and install wall cabinets and built - in wooden shelves
ZACHRY COSTRUCTION WORKS, Tucson, AZ Construction Carpenter, June 2013 — Present • Construct, install and repair window and
door frames, shelves, cabinets and wardrobes • Carryout wooden floors and false ceiling installations • Measure and cut wood
structures accurately for fixed framework
structures • Make cost estimations based on project layout and material selection • Conduct
structure strength evaluations to check the work for stability • Calculate proportional sizes of complex building designs by interpreting the blueprint precisely
Dug and installed footings,
frame walls and roof
structures, and install windows, points of entry, and
doors and
door openings; installed siding and roofing materials such as hi - rib steel, shingles, wood, and other sidings, and mortarless masonry units.
This simple, lightweight
structure combines frameless glass with aluminium minimal
frame sliding
doors.