Sentences with phrase «duty wheel bearings»

The suspension arrangement is fairly basic, with MacPherson struts up front and a torsion bar arrangement at the rear, but Suzuki has equipped Monroe dampers (fitted to the previous Sport), heavier - duty wheel bearings and thicker joints

Not exact matches

The suspension is upgraded with Pratt & Miller - tuned dampers and heavy - duty wheel hubs and bearings.
Because the package is designed for high cornering loads, there are heavy duty toe links, rear shock mounts, and wheel bearings, all adopted from the 580 - horsepower ZL1 super Camaro.
This car was given the full monte, 9:1 compression pistons, 2» HD8 SU carburettors, special induction manifold, Barwell gas flowed and ported head specially for coombs, D - type camshafts, larger inlet valves, modified distributor, special straight through competition exhaust system centre exit, lead - bronze main and big end bearings, lightened flywheel, high ratio steering box, koni shock absorbers, modified suspension including stiffer anti-roll bar / stiffer coil springs to front / heavy duty leaf springs to rear, extra wide track chrome Dunlop wire wheels, E type all synchromesh gearbox with Laycock de Normandville overdrive, Power - Lok 3.73 ratio rear axle, front and rear arches modified by Coombs to accommodate wide track wheels, E type wood rim steering wheel, wooden gear lever knob, push button radio with twin speakers / balance control and roof aerial, reclining seats, heated rear window, foglamp covers and «Sundym» tinted glass.
As the original body tag indicates this truck was born with the following options: air conditioning, front stabilizer bar, power front disc brakes, power steering, roof mounted marker lights, chrome rear bumper, Frost White and Mariner Blue exterior paint, tinted glass, front and rear shock abs, heavy - duty front springs, a 350ci V8 engine, full wheel covers, AM pushbutton radio, and the Super Cheyenne equipment package.
This car was given the full monte, 9:1 compression pistons, 2» HD8 SU carburettors, special induction manifold, Barwell gas flowed and ported head specially for coombs, D - type camshafts, larger inlet valves, modified distributor, special straight through competition exhaust system centre exit, lead - bronze main and big end bearings, lightened flywheel, high ratio steering box, koni shock absorbers, modified suspension including stiffer anti-roll bar / stiffer coil springs to front / heavy duty leaf springs to rear, extra wide track chrome Dunlop wire wheels, E type all synchromesh gearbox with Laycock de Normandville ove
On hearing this news, Sir Branson felt it his duty to give the punters something to look at: «We had an airship company just outside London so we scrambled a blimp and the end result was an airship flying over the wheel bearing the slogan BA Can't Get It Up!!»
According to PML, its compact electric wheel motors produce unrivalled levels of torque with internal heavy - duty tapered roller bearings that can withstand heavy radial loads for robust use, important for the all - wheel drive capability of the ZAP - X.
• Track record of efficiently preparing worksites by removing hazardous materials and debris • Proven ability to fashion track lengths according to set standards and specifications • Hands - on experience in inspecting tracks to determine need for repair and maintenance • Familiar with replace, remove and repair tracks and related components to ensure smooth railroad operations • Effectively able to handle drilling duties to insert bolts and joints and perform preventative maintenance on tracks and components • Highly skilled in gauging deviations in track surfaces and performing related repair work to ensure train safety • Exceptionally well - versed in operating picks, shovels, bulldozers and spike - driving machines to meet rail track repair, maintenance and installation needs • Deep insight into inspecting tracks for defects and reporting and clearing potential obstacles, especially after bad weather • First - hand experience in performing lookout and hand signaling duties during track operations such as installation and maintenance • Competent in laying and fixing foundations and sleepers for tracks, cutting tracks to lengths and installing railway switches • Qualified to remove damaged rail track parts and examine and maintain switch lamps and wheel bearings
We plan to utilize re-purposed heavy duty metal pulleys / wheels w / ball bearings along a 1/4 ″ thick or so plate steel for the track.
a b c d e f g h i j k l m n o p q r s t u v w x y z