-- The term «efficiency» means the operating efficiency of
an electric generation facility as determined by the average annual heat rate of the facility, measured in British thermal units required to generate a kilowatt - hour of electricity from the facility.
-- The term «
electric generation facility» means a coal - fired or natural gas - fired
electric generation facility in the United States with a generating capacity that is greater than 50 megawatts.
The Directed
Electric Generation Facility Cessation Mitigation Program provides payments to municipalities that depended on large fossil - fired generating plant property taxes when those facilities are closed down which certainly does not translate into reductions.
For example, energy companies estimate that raising the operating temperature by 1 percent at a single
electric generation facility can save up to $ 20 million a year.
Westchester County Legislator John Testa added to the Board of Legislators» Joint State Legislative Package an amendment to Cuomo's executive budget proposal to include additional funds for
the Electric Generation Facility Cessation Mitigation Program.
Included in New York's recently approved 2018 budget is $ 24 million for The New York State
Electric Generation Facility Cessation Mitigation Program.
Increases
the Electric Generation Facility Cessation Mitigation Program from $ 45M to $ 69M.
-- OPINION: Former Attorney General Dennis Vacco says that Article 10 weakens local control of siting
electric generation facilities.
The average operating heat rate for gas - fired power plants is about 21 % lower than coal - fired
electric generation facilities, creating less CO2 emissions.
Prohibits the location of certain wind
electric generation facilities within forty miles of an airfield or airbase under jurisdiction of any federal military department.
Requires the Administrator to: (1) request information from owners / operators of coal - fired
electric generation facilities about hazardous air pollutants other than mercury; and (2) propose and promulgate emission standards.
1:00 - 2:30 p.m. EST (An Interactive Audio and Web - Based Seminar Hosted by Infocast) The Basics Seth D. Hilton Stoel Rives LLP 111 Sutter / CO2 emission from average combustion levels New Generation — Geothermal Geothermal emits some CO2 mostly in condensate evaporation in the cooling cycle Levels / states or countries with capped emissions Repowering existing
electric generation facilities New clean energy sources Potential Opportunities for Entities Subject to California's Emission Reduction Requirements /
(Sec. 209) Amends the Public Utility Regulatory Policies Act of 1978 to authorize the Secretary to provide grants to: (1) increase energy efficiency, siting, or upgrading transmission and distribution lines serving rural areas; or (2) provide or modernize
electric generation facilities that serve rural areas.
(1) identifies technologies, equipment, and processes that are adequately demonstrated to be commercially deployed and could increase the efficiency of
the electric generation facilities reviewed;
(5) calculates the effect on greenhouse gas and other emissions per megawatt - hour from
electric generation facilities that would result from installation or implementation of the technologies, equipment, and processes identified under paragraph (1), assuming the obstacles identified under paragraph (2) are reduced or eliminated.
(2) identifies the technical, economic, regulatory, environmental, and other obstacles to
electric generation facilities undertaking the installation or implementation of the technologies, equipment, or processes described in paragraph (1);
-- Not later than 120 days after the date of enactment of this Act, the Secretary, in consultation with relevant stakeholders, shall complete an efficiency review to quantify the efficiencies of, and annual carbon dioxide and other emissions from,
electric generation facilities in the United States.
She has extensive experience in negotiating acquisitions and dispositions of
electric generation facilities, construction and operations and maintenance contracting, joint ownership arrangements for large electric generation projects, and power purchase and hedging arrangements.
Not exact matches
The
facility will ensure a steady supply of batteries for Tesla's third -
generation electric vehicles and, not coincidentally, a steady supply of energy storage for founder Elon Musk's other brainchild, SolarCity.
The Board established a program to provide SRECs to owners of solar
electric power
generation facilities certified as being located on a brownfield, historic fill area, or properly closed landfill in consultation with the NJDEP and NJEDA and after public comment and public hearing by January 19, 2013.
Utility - scale solar energy projects (defined for the Solar PEIS as
facilities with a
generation capacity of 20 MW or greater) generate electricity that is distributed to consumers through the
electric power transmission grid.
The proposal calls for upgrading existing pipeline
facilities and storage assets, with a goal of supplying
electric generation markets in the gas - constrained region.
American Municipal Power, Inc. (AMP) is a non-profit corporation that owns and operates
electric facilities with the purpose of providing
generation, transmission and distribution of
electric power and energy to its members.
(Sec. 242) Requires the Secretary to establish a program to make monetary awards to encourage the owners and operators of new and existing
electric energy
generation facilities or thermal energy production
facilities using fossil or nuclear fuel to use innovative means of recovering thermal energy that is a potentially useful byproduct of
electric power
generation or other processes to: (1) generate additional
electric energy; or (2) make sales of thermal energy not used for
electric generation, in the form of steam, hot water, chilled water, or desiccant regeneration, or for other commercially valid purposes.
ComEd does not own or operate
electric power
generation facilities.
«(B) the net sales of electricity by the
facility to customers not consuming the thermal output from that
facility will not exceed 50 percent of total annual
electric generation by the
facility.
The existing pilot program applies only to Dominion Virginia Power and sets the maximum size of a renewable
generation facility at one megawatt; the programs authorized by SB 148 apply to all
electric utilities and do not set limits on the size of
facilities.
Requires the Secretary to make loans available to
electric utilities to: (1) construct a renewable energy
generation facility; and (2) install an energy efficiency or electricity demand reduction technology.
Florida: The Seminole
Electric generation and transmission co-op serving Florida's rural Gulf Coast last August completed what is thought to be the largest community solar
facility any utility in the Southeast.
This project will support the
generation facilities of 3.5 MW with clean, renewable energy, thus avoiding the need to use energy from the regular
electric grid.
The rules are designed to permit public entity
electric utility customers to install a solar
generation system, sized not to exceed the aggregate of the metered annual use of the customer's qualified
facilities that are all in the same rate class under the applicable tariff.
Authorizing the final segments of the Project will make 7,191 acres of Federal lands within the ROW available to transmit
electric power generated from both traditional (i.e. coal - fired and natural gas - fired)
generation facilities and renewable sources (i.e. wind
generation facilities) in Wyoming and Idaho.
We advise management and technical personnel on a broad range of issues, including the licensing, siting, and financing of
electric generation and transmission
facilities, rate setting, and long - term power contracts.
[82] In practice, this means entities in nine industrial sectors: petroleum, organic chemicals, inorganic chemicals, industrial minerals, metal mining, metal casting, iron and steel, pulp paper, and
electric power
generation facilities.
Asides from that, it also boasts of being the owner of over 200 power