Currently, China is constructing 12
electricity transmission corridors for air pollution control, making it the first nation in the world to design transmission to improve air quality.
Not exact matches
Together, the Access Northeast developers serve 70 % of the region's
electricity consumers and the pipelines involved already connect directly to 70 % of the region's gas - fired electric generation on their existing
corridors,» said Bill Yardley, Spectra Energy's president of U.S.
Transmission Storage.
-- In addition to the policy under paragraph (1), it is the policy of the United States that regional electric grid planning to meet these objectives should result from an open, inclusive and transparent process, taking into account all significant demand - side and supply - side options, including energy efficiency, distributed generation, renewable energy and zero - carbon
electricity generation technologies, smart - grid technologies and practices, demand response,
electricity storage, voltage regulation technologies, high capacity conductors with at least 25 percent greater efficiency than traditional ACSR (aluminum stranded conductors steel reinforced) conductors, superconductor technologies, underground
transmission technologies, and new conventional electric
transmission capacity and
corridors.
SB 1059 authorizes the Commission to designate suitable
transmission corridors for high - voltage electric
transmission lines to ensure reliable and efficient
electricity delivery.
The National Energy Policy Act of 2005 requires the United States Department of Energy (DOE), Bureau of Land Management (BLM), and U.S. Forest Service (USFS), in cooperation with the Departments of Commerce and Defense, to designate new right - of - way
corridors on federal lands for
electricity transmission and distribution facilities, and oil, gas, and hydrogen pipelines.
SB 1059 provides a bridge between the
transmission planning process and the permitting process by designating transmission corridor zones (transmission corridors) on state and private lands available for future high - voltage electricity transmission projects, consistent with the state's electricity needs identified in the biennial Integrated Energy Policy Report (Energy Report) and Strategic Transmission Investment Plan (Stra
transmission planning process and the permitting process by designating
transmission corridor zones (transmission corridors) on state and private lands available for future high - voltage electricity transmission projects, consistent with the state's electricity needs identified in the biennial Integrated Energy Policy Report (Energy Report) and Strategic Transmission Investment Plan (Stra
transmission corridor zones (
transmission corridors) on state and private lands available for future high - voltage electricity transmission projects, consistent with the state's electricity needs identified in the biennial Integrated Energy Policy Report (Energy Report) and Strategic Transmission Investment Plan (Stra
transmission corridors) on state and private lands available for future high - voltage
electricity transmission projects, consistent with the state's electricity needs identified in the biennial Integrated Energy Policy Report (Energy Report) and Strategic Transmission Investment Plan (Stra
transmission projects, consistent with the state's
electricity needs identified in the biennial Integrated Energy Policy Report (Energy Report) and Strategic
Transmission Investment Plan (Stra
Transmission Investment Plan (Strategic Plan).