The Project will also include the design, construction and / or relocation of certain interchanges, bridges and utilities (including full connectivity at the Capital Beltway intersection), improvements to auxiliary and bike lanes, and the design, installation and operation of a dynamic,
electronic toll collection system.
The project includes the addition of new HOV lanes and the utilization of an all -
electronic toll collection system to improve travel time reliability.
Not exact matches
Three
systems of
toll roads exist: open (with mainline barrier
toll plazas); closed (with entry / exit
tolls) and open road (no
toll booths, only
electronic toll collection gantries at entrances and exits, or at strategic locations on the mainline of the road).
The I - 495 Capital Beltway HOT Lanes project employs a
toll collection system that is fully
electronic, using transponder technology and dynamic
tolling based on real - time traffic conditions.