And as this friend pointed out — it would be nice to think that once each waste - to -
energy anaerobic digestion plant has used up the readily available stream of waste, the operator will open up another plant elsewhere to use waste there too.
Not exact matches
VIDEO: 90,000 TPA Dry AD Food Waste to Biogas
Plant to Open in San Jose Zero Waste
Energy is set to open its 90,000 ton per year Dry Fermentation
Anaerobic Digestion food waste facility in San Jose — the first large - scale commercial facility of its kind in the U.S.
The RAPTOR ® portion of the
plant involves an innovative twist on traditional
anaerobic digestion, designed to maximize the
energy generation from specific wastes.
Anaerobic benefits
Anaerobic digestion facilities have been recognized by the United Nations development program as one of the most useful decentralized sources of
energy supply because they are less capital - intensive than are large power
plants.
As a result of their efficiency,
anaerobic digestion facilities have been recognized by the United Nations Development programmer as one of the most useful decentralized sources of
energy supply, as they are less capital - intensive than large power
plants.
Anaerobic digestion facilities have been recognised by the United Nations Development programme as one of the most useful decentralised sources of
energy supply, as they are less capital - intensive than large power
plants.
In 1990, the city started harvesting biogas produced through
anaerobic digestion of sludge, creating renewable
energy and heat to run the
plant.
Our renewable
energy team has extensive knowledge in biomass power facilities, including woody biomass boiler - fired and gasification
plants, municipal waste - to -
energy plants, biofuels
plants,
anaerobic digestion plants, biomass pelletization or torrefaction
plants, and coal - to - biomass conversion facilities.