Sentences with phrase «engineering test stage»

Not exact matches

Scale models are built and collected for many reasons including, in engineering, for testing the likely performance of a design object at an early stage without the expense of building a full - sized prototype; in remote control vehicles; and on TV and in the movie industry, for constructing objects or sets that can not be built in full size.
Vaccinia poxvirus joins a herpesvirus and a host of other pathogens on a growing list of engineered viruses entering late - stage human testing against cancer.
Liu, a faculty member in both bioengineering and mechanical engineering at Lehigh University, is in the early stages of testing his device in a clinical setting — and the results are promising.
The ultimate goal is to develop new and better approaches for genetic engineering of stem cells to be tested within a clinical trial for the treatment of late stage advanced cancers.
In the study, the researchers tested phenformin as a chemotherapy agent in genetically - engineered mice lacking LKB1 and which had advanced stage lung tumors.
The CBI argues that the situation has been mainly driven by the abolition of testing at Key Stage Two and the upshot of a system obsessed with exam results, not the real world skills future scientists, technicians and engineers need to master.
Toyota says that this concept will «gauge public reaction to the idea», but has confirmed that it is carrying out engineering tests on a prototype version at this stage.
Camaro designers and engineers worked from the earliest stages of vehicle development to design, test and validate the accessories and performance parts to GM production - vehicle specifications.
Alik Widge, a psychiatrist - engineer focusing on brain stimulation, told the publication that while rodents can be used for early stages, the company will eventually need an animal like a pig that has a «big brain with lots of folds» to properly test its creation.
Seasoned aerospace engineers with a wide range of proficiencies relevant to various stages of aircraft assembly and testing.
Jet Propulsion Laboratory, Cedar City, UT 6/2010 to Present Electrical Engineering Technologist • Set up, operate and maintain test equipment to evaluate performance of parts and assemblies • Handle assembling duties pertaining to electrical and electronic systems and prototypes • Provide assistance in resolving technical issues transpiring before, during and after project procedures have been put into place • Review existing electrical systems to gauge revisions, repairs and amendments needed • Install electrical control systems and perform preventative and regular maintenance on them • Test equipment to determine usability and conformity to set electrical engineering standards • Plan and execute sequence of operations and analyze test information to determine and solve design - related issues • Create and modify components and build and test electrical components of prototypes • Create documentation at each stage of building and testest equipment to evaluate performance of parts and assemblies • Handle assembling duties pertaining to electrical and electronic systems and prototypes • Provide assistance in resolving technical issues transpiring before, during and after project procedures have been put into place • Review existing electrical systems to gauge revisions, repairs and amendments needed • Install electrical control systems and perform preventative and regular maintenance on them • Test equipment to determine usability and conformity to set electrical engineering standards • Plan and execute sequence of operations and analyze test information to determine and solve design - related issues • Create and modify components and build and test electrical components of prototypes • Create documentation at each stage of building and tesTest equipment to determine usability and conformity to set electrical engineering standards • Plan and execute sequence of operations and analyze test information to determine and solve design - related issues • Create and modify components and build and test electrical components of prototypes • Create documentation at each stage of building and testest information to determine and solve design - related issues • Create and modify components and build and test electrical components of prototypes • Create documentation at each stage of building and testest electrical components of prototypes • Create documentation at each stage of building and testing
Professional Summary * 6 years of experience in Devops as Build and Release Engineer in automating, building, deploying, managing and releasing of code from one environment to other environment tightly maintaining Continuous Integration, Delivery and Deployment in multiple environments like (DEV / TEST / STAGE & PROD).
Managed multiple NEBS pre-test projects staging, testing, generating test report to uploaded to Cisco internal engineering database, allowing for 24/7 access.
a b c d e f g h i j k l m n o p q r s t u v w x y z