Not exact matches
Scale models are built and collected for many reasons including, in
engineering, for
testing the likely performance of a design object at an early
stage without the expense of building a full - sized prototype; in remote control vehicles; and on TV and in the movie industry, for constructing objects or sets that can not be built in full size.
Vaccinia poxvirus joins a herpesvirus and a host of other pathogens on a growing list of
engineered viruses entering late -
stage human
testing against cancer.
Liu, a faculty member in both bioengineering and mechanical
engineering at Lehigh University, is in the early
stages of
testing his device in a clinical setting — and the results are promising.
The ultimate goal is to develop new and better approaches for genetic
engineering of stem cells to be
tested within a clinical trial for the treatment of late
stage advanced cancers.
In the study, the researchers
tested phenformin as a chemotherapy agent in genetically -
engineered mice lacking LKB1 and which had advanced
stage lung tumors.
The CBI argues that the situation has been mainly driven by the abolition of
testing at Key
Stage Two and the upshot of a system obsessed with exam results, not the real world skills future scientists, technicians and
engineers need to master.
Toyota says that this concept will «gauge public reaction to the idea», but has confirmed that it is carrying out
engineering tests on a prototype version at this
stage.
Camaro designers and
engineers worked from the earliest
stages of vehicle development to design,
test and validate the accessories and performance parts to GM production - vehicle specifications.
Alik Widge, a psychiatrist -
engineer focusing on brain stimulation, told the publication that while rodents can be used for early
stages, the company will eventually need an animal like a pig that has a «big brain with lots of folds» to properly
test its creation.
Seasoned aerospace
engineers with a wide range of proficiencies relevant to various
stages of aircraft assembly and
testing.
Jet Propulsion Laboratory, Cedar City, UT 6/2010 to Present Electrical
Engineering Technologist • Set up, operate and maintain
test equipment to evaluate performance of parts and assemblies • Handle assembling duties pertaining to electrical and electronic systems and prototypes • Provide assistance in resolving technical issues transpiring before, during and after project procedures have been put into place • Review existing electrical systems to gauge revisions, repairs and amendments needed • Install electrical control systems and perform preventative and regular maintenance on them • Test equipment to determine usability and conformity to set electrical engineering standards • Plan and execute sequence of operations and analyze test information to determine and solve design - related issues • Create and modify components and build and test electrical components of prototypes • Create documentation at each stage of building and tes
test equipment to evaluate performance of parts and assemblies • Handle assembling duties pertaining to electrical and electronic systems and prototypes • Provide assistance in resolving technical issues transpiring before, during and after project procedures have been put into place • Review existing electrical systems to gauge revisions, repairs and amendments needed • Install electrical control systems and perform preventative and regular maintenance on them •
Test equipment to determine usability and conformity to set electrical engineering standards • Plan and execute sequence of operations and analyze test information to determine and solve design - related issues • Create and modify components and build and test electrical components of prototypes • Create documentation at each stage of building and tes
Test equipment to determine usability and conformity to set electrical
engineering standards • Plan and execute sequence of operations and analyze
test information to determine and solve design - related issues • Create and modify components and build and test electrical components of prototypes • Create documentation at each stage of building and tes
test information to determine and solve design - related issues • Create and modify components and build and
test electrical components of prototypes • Create documentation at each stage of building and tes
test electrical components of prototypes • Create documentation at each
stage of building and
testing
Professional Summary * 6 years of experience in Devops as Build and Release
Engineer in automating, building, deploying, managing and releasing of code from one environment to other environment tightly maintaining Continuous Integration, Delivery and Deployment in multiple environments like (DEV /
TEST /
STAGE & PROD).
Managed multiple NEBS pre-
test projects
staging,
testing, generating
test report to uploaded to Cisco internal
engineering database, allowing for 24/7 access.