Sentences with phrase «entire drainage systems»

It would mean substantial damage to existing infrastructure well before its «use by» date, and it will make entire drainage systems non functional even if building are still partly usable.

Not exact matches

Environmental Engineer — Duties & Responsibilities Trained environmental engineer with experience in industrial and academic settings Oversee development and feasibility study of a new low level chlorine detection method by nanotechnology Direct identification and quantification of sulfate - reducing bacteria (SRB) and sulfur - oxidizing bacteria (SOB) by Real Time Polymerase Chain Reaction (RT - PCR) Lead research for «Control of distribution system water quality in a changing water quality environment» funded by Tampa Bay Water Authority, Water Research Foundation Responsible for analyzing biological parameters and interpreting data from distribution system samples Manage QA / QC and sampling protocol for all biological project samples Compose and organize the entire biological sections for final project reports Develop and verify empirical models relating biofilm density and HPC measurements to water quality Responsible for designing water, sewer, fire, and storm drainage systems for a 3 story building Composed an Operations & Maintenance Manual for drainage systems Drafted full - size CAD blue prints of drainage systems and other structures Proficient in water / waste water treatment, experimental design, and laboratory studies Provide research for a project studying the effects of ultra-filtration on oily waste water Create a full 40 MGD water treatment plant process and design for a fictional city in North China Oversee site and source water selection, water pump stations design, treatment plant planning and pipeline layout Drafted full - size CAD blue prints and composed an Operations & Maintenance Manual Experience with hydraulic modeling and waste water plant design Consistently recognized for excellence in team leadership, project management, and academic study
The extensive inside - out top - to - bottom renovation took almost three years and included gutting each of the five bathrooms, the kitchen and the basement; restoring plaster work and mouldings; updating the fireplaces, plumbing and electrical systems; landscaping and regrading the entire property to bring it to code; and installing proper drainage.
a b c d e f g h i j k l m n o p q r s t u v w x y z