SEJ's Fund for Environmental Journalism gifts grants of up to $ 3,500 to both members and non-members to help underwrite
environmental reporting projects and entrepreneurial ventures.
Not exact matches
The State Department's long - awaited
environmental report on the Keystone XL pipeline leaves President Barack Obama with no real scientific reason to reject the nation's most fiercely debated energy
project.
I asked her about
reports that her government is planning to raise Alberta's $ 15 per tonne carbon price to $ 40 per tonne as a means to getting American approval for the pipeline
project — a price that
environmental critics say would be still too low.
PDFs of our
Environmental Policy, our most recent Carbon Disclosure
Project (CDP) responses as well as the most recent CDP
report for our industry can be found below.
From a strictly legal perspective, the relevant question is not whether there is a sufficient connection to any particular existing or proposed oil sands development or other production activity, and certainly not whether such
projects or activities were included in the Terms of Reference (ToR), but rather simply whether the GHGs associated with the production of bitumen that will be transported by the NGP are an «
environmental effect» of that
project (see NGP
Report, Volume II, Appendix 4, Terms of Reference, which defines «
environmental effect» very broadly to mean «any change that the
project may cause in the environment.»
Notwithstanding its potential
environmental burdens, the JRP ultimately concluded that the NGP is in the public interest, citing various societal benefits including primarily jobs and job - training for Aboriginal communities but also «research, monitoring, and planning initiatives and techniques with relevance beyond the
project» and economic benefits, first and foremost the importance of «opening Pacific Basin markets» (NGP
Report, Volume II, Chapter 2, s. 2.4.3 and 2.4.4.).
Amortisations will gradually reduce the issuer's
reported environmental impact of a
project, but will free up capacity to finance new
projects, says Bergstrand.
The AWEA U.S. Wind Industry Annual Market
Reports provide an in - depth look at the U.S. wind industry each year, including market rankings of major players, state - by - state details, economic and
environmental impact, assessment of power offtake and wind capacity ownership, manufacturing and supply chain,
project finance, offshore wind, transmission, and more.
Hundreds of people have been camping out and standing against the construction of the pipeline, according to
reports, because they think the whole
project poses a major
environmental threat to the Standing Rock Sioux tribe and its cultural sites.
This
report is the product of the first year of monitoring and evaluation in the Lower Murray River under the Commonwealth
Environmental Water Office's Long Term Intervention Monitoring (LTIM)
Project.
Commonwealth
Environmental Water Office Long Term Intervention Monitoring
Project: Lower Lachlan River System, 2016 - 17 Annual
Report
Commonwealth
Environmental Water Office Long Term Intervention Monitoring
Project Goulburn River Selected Area evaluation
report 2016 — 17
The
report evaluates the contribution of Commonwealth
environmental water to
environmental outcomes in 2016 - 17, complementing the first two years of LTIM
Project monitoring and evaluation work undertaken in 2014 - 15 and 2015 - 16 and previous short term monitoring and evaluation work undertaken in 2012 - 13 and 2013 - 14.
Commonwealth
Environmental Water Office Long Term Intervention Monitoring
Project: Lower Lachlan river system Selected Area 2014 - 15 Annual Monitoring and Evaluation
Report
Commonwealth
Environmental Water Office Long Term Intervention Monitoring
Project: Edward - Wakool Selected Area Technical and Synthesis
Reports, 2014 - 15
This
report is the product of the first year of monitoring and evaluation in the Goulburn River under the Commonwealth
Environmental Water Office's Long Term Intervention Monitoring (LTIM)
Project.
This
report is the product of the first year of monitoring and evaluation in the Lachlan catchment under the Commonwealth
Environmental Water Office's Long Term Intervention Monitoring (LTIM)
Project.
This
report is the product of the third year of monitoring and evaluation in the Goulburn River under the Commonwealth
Environmental Water Office's Long Term Intervention Monitoring (LTIM)
Project.
This
report is the product of the second year of monitoring and evaluation in the Junction of the Warrego and Darling Rivers under the Commonwealth
Environmental Water Office's Long Term Intervention Monitoring (LTIM)
Project.
Commonwealth
Environmental Water Office Long Term Intervention Monitoring
Project junction of the Warrego and Darling rivers Selected Area 2015 - 16 Evaluation
Report
The
report evaluates the contribution of Commonwealth
environmental water to
environmental outcomes in 2016 - 17, complementing the first two years of LTIM
Project monitoring and evaluation work undertaken in 2014 - 15 and 2015 - 16.
This
report is the product of the second year of monitoring and evaluation in the Edward - Wakool River system under the Commonwealth
Environmental Water Office's Long Term Intervention Monitoring (LTIM)
Project.
The Commonwealth
Environmental Water Holder today released a series of scientific reports analysing the impacts of environmental water during 2014 - 15, as part of a $ 30 million investment in monitoring and evaluation projects across the Murray - Darling Basin over five yea
Environmental Water Holder today released a series of scientific
reports analysing the impacts of
environmental water during 2014 - 15, as part of a $ 30 million investment in monitoring and evaluation projects across the Murray - Darling Basin over five yea
environmental water during 2014 - 15, as part of a $ 30 million investment in monitoring and evaluation
projects across the Murray - Darling Basin over five years (to 2020).
This
report is the product of the third year of monitoring and evaluation in the Junction of the Warrego and Darling Rivers under the Commonwealth
Environmental Water Office's Long Term Intervention Monitoring (LTIM)
Project.
The
report evaluates the contribution of Commonwealth
environmental water to
environmental outcomes in 2015 - 16, complementing the first year of LTIM
Project monitoring and evaluation work undertaken in 2014 - 15 and previous short term monitoring and evaluation work undertaken in 2012 — 13 and 2013 — 14.
This
report is the product of the second year of monitoring and evaluation in the Murrumbidgee under the Commonwealth
Environmental Water Office's Long Term Intervention Monitoring (LTIM)
Project.
This
report draws together the results of each ecological indicator that is monitored and evaluated to inform an integrated Basin - scale assessment of the outcomes of Commonwealth
environmental water in the first year of the LTIM
Project.
The
report evaluates the contribution of Commonwealth
environmental water to
environmental outcomes in 2015 - 16, complementing the first year of LTIM
Project monitoring and evaluation work undertaken in 2014 - 15 and previous short term monitoring and evaluation work undertaken in 2011 - 12, 2012 - 13, 2013 - 14.
This
report is the product of the first year of monitoring and evaluation at the whole of Basin - scale as part of the Commonwealth
Environmental Water Office's five - year Long Term Intervention Monitoring (LTIM)
Project.
Delivering the right amount of water to the right place, at the right time, is generating positive results for the environment, as demonstrated by a series of scientific
reports analysing the impacts of Commonwealth
environmental water use during 2014 - 15 - part of a $ 30 million investment in monitoring and evaluation
projects across the Murray - Darling Basin over five years (to 2020).
Commonwealth
Environmental Water Office Long Term Intervention Monitoring
Project Goulburn River Selected Area evaluation
report 2015 - 16
Commonwealth
Environmental Water Office Long Term Intervention Monitoring
Project Gwydir River System Selected Area — 2014 - 15 Evaluation
Report
Commonwealth
Environmental Water Office Long Term Intervention Monitoring
Project: Lower Lachlan river system 2015 - 16 Synthesis
Report
This
report is the product of the second year of monitoring and evaluation in the Gwydir under the Commonwealth
Environmental Water Office's Long Term Intervention Monitoring (LTIM)
Project.
NRG's plants in Tonawanda and Dunkirk emitted more pollutants than any other New York power plant and were the 31st and 155th dirtiest power plants in America in 2005, respectively, according to a
Environmental Integrity
Project report.
Crain's
reports that the $ 2.5 billion
project has been left out of the Economic Development Corporation's budget, thus meaning that preliminary design work and an
environmental study have no funding to move forward with.
At the Rosendale meeting, town supervisor Jeanne Walsh
reported that an updated copy of the
project's Draft
Environmental Impact Statement (DEIS) shows «for the first time really close - up mapping» of the pipeline route.
The
report also finds the
Environmental Facilities Corporation board «inappropriately used executive session to discuss the
project and held no discussions in regular board meetings open to the public.»
In a written response, the
Environmental Facilities Corporation says the
report is filled with inaccuracies and omissions, and cites numerous media stories over the loan as evidence that there was much public discussion of the
projects.
That
report, called a draft
environmental impact statement, will provide a recommendation to the New York State Department of Transportation on what multibillion - dollar option they should select for the
project.
ALBANY, NY (07/17/2012)(readMedia)-- In response to a new
report released by Earthworks» Oil & Gas Accountability
Project - NYS DEC: Inadequate enforcement guarantees irresponsible oil and gas development (http://enforcement-ny.earthworksaction.org), which questions New York's ability to oversee the state's existing and proposed gas drilling operations - Citizens Campaign for the Environment,
Environmental Advocates of New York, Catskill Mountainkeeper, Hudson Riverkeeper, Sierra Club - Atlantic Chapter, and Environment New York released the following statement:
Adam Skelos then became involved in an
environmental technology company, identified in press
reports as Abtech, despite admitting in meetings that he had no background on storm - water treatment
projects that were the backbone of the company's business.
International
environmental consultant and former New York City Department of Environmental Protection Commissioner Al Appleton wrote the report for the Rockland Water Coalition, a grassroots group that asked Appleton to look at the issue of alternatives to United Water New York's proposed desalination plant, or the Haverstraw Water Su
environmental consultant and former New York City Department of
Environmental Protection Commissioner Al Appleton wrote the report for the Rockland Water Coalition, a grassroots group that asked Appleton to look at the issue of alternatives to United Water New York's proposed desalination plant, or the Haverstraw Water Su
Environmental Protection Commissioner Al Appleton wrote the
report for the Rockland Water Coalition, a grassroots group that asked Appleton to look at the issue of alternatives to United Water New York's proposed desalination plant, or the Haverstraw Water Supply
Project.
Smitsonian Institution Programs Summer Archeology Programs Connected with DC Universities [Program for Deaf Students] Drinking Water Quality Research Center, Miami, FL [proposal for outreach to disabled students] Museum of Science and Industry, IL Chicago Schools Cooperative Museum Program, IL Recreational Faculties for the Handicapped at Rend Lake, IL SELPH Material Lawrence Hall King
Report on Survey of the Special Educational Programs of Members of the Association of Science Technology Centers University of Kentucky Outdoor Education for Handicapped
Project Directory of OOPS Programs Maryland Science Center, Baltimore, MD [notes on interview] ABCD Collaboration Science Program Non-Mainstreamed Museum of Fine Arts, Boston, MA Technical Education Research Center Camp Happy Hollow, Mayrille, MI Squam Lakes Science Center, NH Science Enrichment Program Opened to Handicapped Students NY League of Hard of Hearing, NY Center of Science and Industry, OH Carnegie Museum, Pittsburg, PA Pacoma
Environmental Education Center, PA Roanoke Valley Science Museum, VA Fairfax County Public Schools, VA US Geological Survey Earth Science Program, WI ERIC - CRESS Info on Outdoor Ed - Science Programs National Council for Therapy and Rehabilitation through Horticulture Environments for the Able and Disabled Nature Study - A Journal of Education and Interpretation OOPS Out of School Science Proposal and Drafts Original Newspaper Article, 1980 - 1981 OOPS Out of School Science Proposal and Drafts II, 1980 - 1981
The suit challenged the
project's
environmental impact
report, maintaining that it did not disclose the potential harm to residents.
Listening to how
projected sound reverberates through kelp beds allows scientists to eavesdrop on
environmental factors such as water temperature and photosynthetic activity, bioacoustician Jean - Pierre Hermand
reported June 28 at a meeting of the Acoustical Society of...
Listening to how
projected sound reverberates through kelp beds allows scientists to eavesdrop on
environmental factors such as water temperature and photosynthetic activity, bioacoustician Jean - Pierre Hermand
reported June 28 at a meeting of the Acoustical Society of America.
The company has reduced the
project and is currently redoing the
environmental impact
report.
A new
report from a non-profit advocacy organization called the
Environmental Integrity
Project shows that the groundwater near TVA coal - fired power plants is contaminated with a toxic stew of elements.
This article is provided by Scienceline, a
project of New York University's Science, Health and
Environmental Reporting Program.