The original
equipment part numbers for the struts are 546614D101 for the right hand side and 546514D101 for the left hand side.
With a history dating back to 1633, it's no surprise there are more than a few: Construction
Equipment Part Number Interchanges.
: Construction
Equipment Part Number Interchanges.
Not exact matches
It allows you to expand capacity without having to formally hire large
numbers of new staff; without having to invest in new capital
equipment, without leasing a larger commercial space; and without having to invest in development costs for non-core
parts of your business, increasing your fixed overhead.
The Chinese networking
equipment and smartphone maker ZTE has warned that its days might be
numbered due to the U.S. ban on supplying it with
parts and software for the next seven years.
A large
part of the rise in the September quarter reflected the impact of higher oil prices and the importation of a
number of lumpy capital imports, including some civil aircraft and defence
equipment.
We are therefore seeing a rise in the
number of innovative packaging solutions and also the development of new components for drive and control
equipment,
parts and accessories for entire automation systems and indeed combinations of software, hardware and efficient control models.
The
number of science jobs that will be created or saved is not yet clear, because
part of the money will go to facilities and
equipment.
They attribute Napa's higher environmental burden in
part to its tradition of harvesting grapes by hand, which requires more
equipment hours than does machine harvesting, and the common practice of reducing the
number of grapes on each vine to control sugar content and boost flavor.
Adding
equipment like a better sound system, a third row of seats or Active Steering will also trigger a change in suspension
part numbers.
Whitman, working with Experiments in Art and Technology, E.A.T., in the early 1970s, developed and participated in a
number of innovative communications projects: - Anand Project: he was
part of an interdisciplinary team to develop methods for instructional television programming for rural Indian villages; - Children and Communications, open environments for children to work with a variety of communication
equipment; - Telex: Q&A: a worldwide person - to - person question and answer opportunity using telex
equipment in New York, Stockholm, Ahmedabad, India, and Tokyo; - Artists and Television, artists» programming on New York cable channels.
The revision of the UL refrigerator standard is just one
part of a much bigger picture, with more progress needed in a
number of other types of
equipment and products.
A large
number of what is labeled as «e-waste» is actually not waste at all, but rather whole electronic
equipment or
parts that are readily marketable for reuse or can be recycled for materials recovery.
Purchasing - Personal protective
equipment,
parts and hardware from a
number of different vendors.
As
part of their training, Journeyman Welders need to get a large
number of certifications for various welding
equipment and complete duties like following specifications, using appropriate materials, adhering to safety guidelines, and collaborating with assistants.
Production Line Worker — Edmunds Manufacturing, St. Louis, MO — 9/2013 — Present • Utilize extensive knowledge of assembly line components as well as product
parts and features to assist in a variety of production tasks on a daily basis • Exceed yearly company production targets by 30 percent with the recommendation and implementation of an updated operations system and new
equipment • Execute troubleshooting, analysis, and repairs of machinery and products as necessary • Maintain a detailed log of daily operations performance and total
number of products produced during every shift • Recommend and introduce innovative safety protocols and procedures to reduce accidents and injuries by 25 percent each year • Interpret blueprints and perform thorough inspections of finalized products for quality control and specification adherence
• Operate heavy
equipment such as 10k, 20k, and 35k Forklift to maneuver large battle damaged weapons such as MRAPS, Stryker, HUMVs and other large tactical and commercial vehicles and John Deer 20k Frontend loader to Load metal scrap in dump trucks • Maintain knowledge of government logistical
numbers, document and code including DTID, NSN, Part Numbers, DODAAC, 1348, Demil codes, Condition codes, and Yard Site lo
numbers, document and code including DTID, NSN,
Part Numbers, DODAAC, 1348, Demil codes, Condition codes, and Yard Site lo
Numbers, DODAAC, 1348, Demil codes, Condition codes, and Yard Site locations
Lead Mechanical Engineer — Josyth Company — Huntsville, Alabama — September 2009 — Present • Supervise design team of 12 members, completing product,
parts, and component design for manufacturing
equipment • Evaluate and test designs produced by the team before approving them for use • Review technical documents before approving them for use in - house • Confer with supervisors and team members to resolve design, operational, and collaborative problems • Approve design models, ensuring that they are in compliance, saving $ 700,000 by reducing
number of flaws in subassembly and models before production • Create and evaluate prototypes to ensure optimal performance