This approach allowed them to lithographically define oxide templates and fill them via epitaxy, in the end making nanowires, cross junctions, nanostructures containing constrictions and 3 - D stacked nanowires using the already
established scaled processes of Si technology.
Not exact matches
«None of them have put any serious effort into honing the whole
process — you know, squeezing out excess parts and labor — and then they have no economies of
scale as far as buying panels en masse or
establishing best practices.»
She has helped AFSA
establish its voice and authority on a range of issues and secured frequent meetings with a number of politicians to lobby for significant reform, as well as leading the
process for submissions to government inquiries, including the Productivity Commission's inquiry into the impact of regulation on agriculture, and the Victorian Government's Animal Industries Advisory Committee, which released its report in 2016 that includes recommendations for more
scale - appropriate application of the planning scheme around extensive and intensive animal husbandry.
Dangote, who made this known during the 2017 Niger State Investment Summit in Minna, said the funds would be used to
establish a large
scale rice
processing mill to
process over 200, 000 metric tonnes of paddy rice.
«Only once before in human history have we encountered a similar
process: in the early modern era, when the counterbalance that had been
establish at a local level in the Middle Ages was surpassed by the increasing political and economic
scale.
The team now want to find out more about the ring, and
establish whether the known
processes for galaxy formation and large
scale structure could have led to its creation, or if astronomers need to radically revise their theories of the evolution of the cosmos.
«We're using well
established metallurgical phenomena, but we've never been able to control the
processes well enough to take advantage of them at this
scale and at this level of detail,» said Suresh Babu, the University of Tennessee - ORNL Governor's Chair for Advanced Manufacturing.
Polarization, which confers asymmetry at molecular, cellular and tissue
scales, is a fundamental
process establishing key features of biological systems.
Principle 3:
Establish processes for identifying problem behaviors early, diagnosing their causes, identifying effective interventions, applying the interventions at the
scale and intensity required, and monitoring their effectiveness.
Last week, New York State Education Department staff presented the Board of Regents with a detailed explanation of the
process of
establishing cut scores (which means the
process of deciding how a particular
scale score translates into levels 1 - 4).
With a visual dialogue
established initially by working illegally with spray paint, making large -
scale murals and site - specific work without permission, the artist has developed a
process of painting that crosses abstracted, ambient fields of colour and gesture with traditional typography, vivid corrupted language and appropriated slogans.
Pierogi represents the work of emerging, mid-career, and
established artists engaging in conceptually driven,
process oriented work in a wide range of media: from the diagrammatic drawings of Mark Lombardi, the large -
scale, nuanced still life drawings of Dawn Clements, and the interactive installations of Andrew Ohanesian, to the historically significant work of Kim Jones (who began his career as a performance artist in LA in the early 1970's), as well as curated exhibitions such as the award - winning Dead Tree installation (a recreation of the Robert Smithson work originally shown in Dusseldorf's Kunsthalle, 1969).
(2)
Establishing the Planetary Boundaries, i.e. identifying Earth System
scale boundaries for environmental
processes that regulate the stability of the planet, does not (of course) contradict or replace the need for local action, transparency and democratic
processes.
Issues such as how to
scale up climate action and finance before 2020; how to
establish a
process for assessing and reviewing countries pledges under the Paris Agreement; and how to
scale up support for loss and damage will all be discussed in Marrakech.
A land use plan is a set of decisions that
establish management direction for land within a BLM administrative area, as prescribed under the planning provisions of the Federal Land Policy and Management Act of 1976 (FLPMA); it is an assimilation of land - use - plan - level decisions developed through the planning
process outlined in 43 CFR 1600, regardless of the
scale at which the decisions were developed.
Roger could reply again by stating that models that don't show skill in projecting changing statistics can not be used for this reasoning by simulation, but I remain to disgree with him: the skill of climate models to project changing climate statistics at decadal time
scales can formally not be
established due to large role of natural variability, but is also not always required for generating useful information that enters the imagination
process.
That
process should begin now and subsequent guidance on the governance of albedo - modification research
established before the U.S. supports any
scale - up of albedo - modification research.
Although we can not
establish a clear connection between SAA dynamics and global warming, the strong correlation between the former and global sea level supports the idea that global warming may be at least partly controlled by deep Earth
processes triggering geomagnetic phenomena, such as the South Atlantic Anomaly, on a century time
scale.
The challenge is to
establish better
process understanding at local
scales and appropriately incorporate this understanding into global models.
As an illustration, in those days there were few competent with gear used to mind industry as we went into large
scale automation of many well
established processes.
However, threats will emerge from smaller, more agile alternatives who can use the ecosystem to access the benefits of
scale that were traditionally the preserve of
established partnerships and, in the
process, challenge these partnerships at their own game.
The goal of the working group is to
establish a standardized method to represent a token across all Blockchain networks in order to eliminate transactional friction and reduce
processing costs; enable automation and provenance tracking; and allow interoperability of transactions on a global
scale.
Self - motivated, well - rounded project management professional with an
established history of
process and quality improvement having more than 10 years of experience managing successful program initiatives and large -
scale projects for organizations ranging from small consulting firms to global, multi-billion dollar engineering firms looking to apply knowledge and skills in a new area of project management.
Demonstrated talent for starting up large
scale distribution centers, implementing warehouse management systems, stabilizing operations,
establishing metrics and implementing inventory control
processes.
Regional IT Manager • Manage HQ infrastructure team and Asia information technology team, leading 11 staff in the servicing of over 800 users and 9 offices with responsibility for global infrastructure architecture and global network and focus groups • Drive global standardization firm - wide within networks, storage, backup, servers, computers and other critical hardware • Utilize cross-regional focus groups to connect functional experts between sites,
establishing roadmaps, creating annual project plans and delivering global projects • Define incident management and change management
processes, working with application teams for full implementation • Create datacenter in ShenZhen technology center to support ASIC team, software team, firmware team, hardware team and sales and FAE teams • Manage high volume of acquisitions and IT integrations on a global
scale, including the CSR integration preparation (2011), the Microtune integration (2010), the Letitwave integration in France (2008) and the Emblaze Semiconductor in Israel (2004) • Supervise and lead numerous technology refresh projects including the global Exchange 2010 upgrade, the global MPLS network upgrade, the network switch upgrade, a global firewall project and internet bandwidth upgrade • Execute critical operations functions and projects including global wireless technology management, network monitoring, the global SSL VPN project, the management of Microsoft licenses and the e-mail gateway • Support critical business continuity tasks, including the development of a low - cost Oracle ERP system DR solution, server virtualization, E-mail DR and Perforce DR • Lead cost - saving and expense management endeavors including the build - up of a Quintum VoIP gateway globally to utilize traditional PBX gateway and the build - up of near - line archive storage with de-duplication technologic
Supportiveness was measured using nine items from the trust and communication subscales of the People in My Life (PIML)
scale, a self - report measure of child attachment designed and validated for use in middle childhood (6 - 12 years)(Ridenour, Greenberg & Cook, 2006) The validation
process used a sample of 10 - 12 year olds to
establish that the overall PIML attachment
scale was correlated as expected with other measures of children's behavioural and emotional adjustment, as reported by parents, teachers and children themselves.