Fund the initiative to tear down and replace
the existing classroom building where the shooting occurred on Feb. 14, 2018.»
Fund the initiative to tear down and replace
the existing classroom building where the shooting occurred.
Not exact matches
In our elementary schools, educators capitalized on our
existing responsive -
classroom model, which has
built - in social and emotional conversation time and established routines for safe and open conversations with children.
As a result of a # 14.3 million investment, the academy's
existing buildings have been replaced with a new three - storey
building which provides light, bright
classrooms, a superb hall, a drama space and excellent sports facilities.
But rather than investing solely in training new teachers, we should unlock the
existing computer science talent awash in our tech industry and invest in
building channels that bring outside experts into
classrooms to supplement what teachers are doing.
The pilots, which will start in May, will
build on
existing evidence and help teachers re-acclimatise to the
classroom and support continuous professional development through a range of measures, including funding for National Professional Qualifications.
Demand for school places The Wykebeck and Bracken Edge school
buildings will comprise of single storey extensions to the
existing schools providing additional
classrooms to meet demand for places.
Facebook's partnership with Childnet International and The Diana Awards is expected to
build on its core strengths in supporting creativity and community to amplify the impact of the
existing peer - led programmes, both inside and outside of the
classroom.
Then, workers will move to
existing buildings to tear down and rebuild walls and reconfigure
classrooms.
A steeply sloping site meant a traditional (masonry) construction wasn't viable and led the design team to develop proposals for a light weight timber
building set on a simple raised deck, providing level access to the
existing building with the opportunity for unique views from the
classroom into the tree canopy.
Measures to achieve new school places might include maximising
buildings or land to increase the quantum of floor space and numbers of
classrooms by way of redevelopment, acquiring sites for new school premises, and / or releasing
existing sites or part of sites that are no longer required, or
buildings that are no longer fit for purpose.
The state - of - the - art campus, located alongside the college's
existing South Bank campus, will include a 5,200 - square metre, four - storey
building with a range of
classrooms, workshops and an impressive central atrium once constructed.
Faced with such figures, education providers and local authorities are increasingly looking for innovative ways to upgrade their
existing facilities — whether that is through refurbishment and retrofit of current
buildings or by constructing new
classrooms and amenities.
Outdoor
classrooms and shelters for schools are designed to complement
existing buildings and surroundings.
This was accomplished by taking over the lower floor of the
building under the
existing BACS
classrooms.
Its tasks are active and practical and
build on
existing classroom learning.
As quality teaching is key to providing the high - quality early learning experiences, IDRA provides customized technical assistance and training that can include:
classroom demonstrations and observations, coaching for success, nurturing of innovations, and
building on
existing strengths.
The project also will incorporate improvements to the
existing school
building, including the replacement of doorknobs with ADA - compliant door latches; ADA - related relocations and renovations of bathrooms; upgrades to an exercise room, a guidance suite, auditorium and four
classrooms; and the installation of an inclined chair lift to provide accessibility to the lower area of the
existing building's third floor.
We are also ready to service your
existing modular
classroom,
building, or complex.
We are standing by and ready to service your
existing modular
classroom,
building or complex.
These arriving immigrants bring tremendous assets and strengths to U.S.
classrooms and communities, yet it remains important to
build understanding of how
existing structures can best support these students» success in U.S. schools.
While Connecticut's privately owned charter schools left the legislative session with a higher reimbursement rate for each student, more money for school equipment, and funds to expand the number of charter schools, Governor Malloy and the legislature failed to come up with the money need to maintain
existing services at Connecticut's public magnet schools, let alone fill the extra magnet school
classrooms that have been
built and are ready to be used this coming September.
The author also posits that the potential
exists for educational technology to assist in
building of community (the third element of the multicultural democratic education framework) in the
classroom, provided that sufficient and quality resources are available.
Whether it occupies a corner of your
classroom, a floor in a stand - alone
building, space in a neighborhood garage or community center, or a pop - up section in an
existing library or
classroom, a makerspace is a physical location where tools, inspiration, and process converge.
This
build, fail, assess, refine pattern — as old as human ingenuity itself — can
exist in
classrooms, as I described a few years back in a piece on «Breaking Things on a Path to Breakthroughs.»
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the
existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) •
Build single story, metal framed, 47,640 square foot of
classroom building • Construct
classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of
existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory
building • Ensure compliance with Title 24 and the latest code and
building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the
building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction