Refined and improved
existing documentation system, resulting in reduced labor costs totaling $ 15,000 annually via increased workplace efficiency
Not exact matches
If your
existing Learning Management
System is integrated with any other systems - such as your HR or CRM system - and you need to replicate these across to your new Learning Management System, ensure you have full technical and functional details and documentation of these systems and integration techn
System is integrated with any other
systems - such as your HR or CRM
system - and you need to replicate these across to your new Learning Management System, ensure you have full technical and functional details and documentation of these systems and integration techn
system - and you need to replicate these across to your new Learning Management
System, ensure you have full technical and functional details and documentation of these systems and integration techn
System, ensure you have full technical and functional details and
documentation of these
systems and integration technology.
The Integration and Tools Working Group identifies opportunities for integration between
existing enterprise software
systems and Ethereum blockchain networks and facilitates collaborative development of tools, libraries, demos, and
documentation to support these integrations.
Perform site visits for
documentation and cost estimating of
existing systems and building conditions
Analyze
existing system and process
documentation to respond to inquiries related to
system processing or to identify
documentation impacts related to proposed
system changes
IT Asset Coordinator Roush Enterprises, Fairbanks, AK 5/2014 — Present • Plan, monitor, procure and record client based hardware assets to ensure compliance with company policies • Develop and implement procedures for tracking IT assets to oversee quality control throughout leased and purchased lives • Use appropriate tools and work closely with procurement departments to ensure that all IT asset management directives are handled according to protocol • Identify personal computers and related peripherals, their present locations, operating
system versions, and lease cycles • Produce and submit compliance reports and assist with the development of procedures and policies to ensure replacement and deployment policies are followed • Assist in establishing and maturing processes for clients» asset management life cycles • Administer hardware deployment work and preservation and refreshment of assets based on established guidelines • Create and revise
existing IT asset management, technology refresh and procurement related
documentation
Jet Propulsion Laboratory, Cedar City, UT 6/2010 to Present Electrical Engineering Technologist • Set up, operate and maintain test equipment to evaluate performance of parts and assemblies • Handle assembling duties pertaining to electrical and electronic
systems and prototypes • Provide assistance in resolving technical issues transpiring before, during and after project procedures have been put into place • Review
existing electrical
systems to gauge revisions, repairs and amendments needed • Install electrical control
systems and perform preventative and regular maintenance on them • Test equipment to determine usability and conformity to set electrical engineering standards • Plan and execute sequence of operations and analyze test information to determine and solve design - related issues • Create and modify components and build and test electrical components of prototypes • Create
documentation at each stage of building and testing
* Proficient in Requirement elicitation, interacting with customers and other stakeholders, gathering requirements through interviews, workshops, and
existing system documentation or procedures, def...
• Install new plumbing
systems of water, gas, steam, heat, drainage, sewage and maintain
existing systems • Inspect pipes and joints of boilers, heaters, valves, pumps, sinks, commodes, tanks, and related components to locate malfunctions • Estimate plumbing labor and material costs • Respond quickly to plumbing fault calls • Prepare
documentation to obtain plumbing permits where required • Transport plumbing materials to and from worksites • Use the computer for tracking assignments • Perform routine maintenance of plumbing equipment
SELECTED ACHIEVEMENTS • Achieved Employee of the Year award for three consecutive years between 2010 and 2013 for repeatedly soldering prototype boards without external assistance • Implemented an embedded
system over an
existing system, thereby reducing testing time by 67 % • Overhauled the
existing project
documentation process which significantly decreased referencing time and effort
Improved product usability by creating feature enhancement requests, as well as performing
systems analysis on
existing products where
documentation was lacking.
Assisted
system administrators with software packages on Cisco equipment, helped with installation setups, and revised
existing documentation guidelines.
Project Lead for FOCUS support team that included estimates, project prioritization, staff management, training, customer reporting,
documentation for
existing systems and monitoring of
systems for problem prevention.