Not exact matches
With the price of entry into our magnificent
library of football being amongst the highest there is we should be securing the services of a TOP manager and
building on the
existing team.
When
building such a reference
library, specimens must either be freshly collected or taken from an
existing collection.
Here's the problem: The map doesn't
exist, the measurement is impossible, and we have, collectively,
built only 5 % of the
library.
For instance, the order will help enable schools and
libraries to
build high - speed broadband facilities themselves, if no cost - effective local alternative
exists.
They are opening in former office blocks and
libraries and Grade II listed
buildings, being set up in England by religious groups and groups behind
existing academies as well as by some parents and teachers.
3M and Polaris
Library Systems announced a partnership today that will
build on their
existing relationship in order to bring more checkout features to
library patrons.
Whether it occupies a corner of your classroom, a floor in a stand - alone
building, space in a neighborhood garage or community center, or a pop - up section in an
existing library or classroom, a makerspace is a physical location where tools, inspiration, and process converge.
Sony's handheld desperately needs an injection of quality first - party exclusives to
build on its small yet mighty
existing library, though will likely receive some serious attention as a PS4 companion device.
The project will extend the
existing Victorian purpose
built gallery and members
library buildings to create a new
building that will provide a mixture of archive, research, conservation and gallery spaces.
Built over an
existing neighborhood site for gatherings, this new small - scale
building will host a number of functions, including that of a small community
library.
Along with Chicago's strong commitment to developing solar and wind power, the City is also
building three
libraries and a police station using LEED standards (Leadership in Energy and Environmental Design) and spending more than $ 100 million to make
existing city
buildings more energy efficient and providing grants and incentives for others to do the same.
Building on the
existing library of home voice commands offered in previous Echo products, now you can ask Alexa to play music and the Show will display music lyrics on the screen.
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the
existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) •
Build single story, metal framed, 47,640 square foot of classroom
building • Construct classrooms, fire lab, driving and shooting simulator rooms,
library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington
Library • Oversee demolition of
existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory
building • Ensure compliance with Title 24 and the latest code and
building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the
building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction