That project would include the closure of DEP's
existing 379 MW Asheville 1 and 2 coal units and construction of about 752 MW of
natural gas - fired generation (two 280 MW combined cycle units proposed to commence
operations in 2019 and an optional 192 MW combustion turbine unit proposed to commence
operations in 2023).