On that note, we had a great time explaining the thick wall section we brought to the Living Green Expo that replicates
the exterior wall construction of the PhitW.
Not exact matches
Sturdy
Construction features 1/4» thick smooth or milled clapboard
exterior walls and grooved sidewalls for easy, one - step assembly, guaranteed fit and durability
Pre-cut precision engineered parts and sturdy
construction of 3/8» milled clapboard
exterior walls.
The district's design criteria also state that designers and builders need to select
construction materials that act to minimize the impact of noises from the
exterior environment, such as: traffic; activities, such as sliding furniture on floors above a learning space; heavy rains on roofs above a learning space; slamming of locker doors in hallways near a learning space; aggressive writing on chalkboards attached to a
wall shared with another learning space; and bouncing of balls in a gymnasium near a learning space.
In geographical areas requiring hurricane - resistant
construction, laminated glass is often used in
exterior storefronts, curtain
walls and windows.
Plywood is a popular, man - made material, often used in the
construction of art shipping crates and
exterior walls.
The artist has deliberately allowed the
construction materials on the
exterior walls to remain visible, operating as a «tell» indicating the manipulated nature of the rooms, their object - ness, and their separation from the actual room in which the viewer stands.
They studied the design of a 12» by 9» section of
exterior wall from a typical multifamily unit, comparing two versions of the
wall: one using conventional
construction and double - paned windows, the other employing Passive House thickness, insulation, airtightness, and triple - paned glazing.
This report compares the moisture related performance of an
exterior insulated
wall to the performance of two other common
construction methods, side - by - side.
For example, one of the most common thermal bridges in typical residential
construction is the
exterior above grade brick cladding sitting on the outside edge of the foundation
wall.
In typical
construction with brick veneer, there is a significant thermal bridge between the interior and
exterior when the brick cladding is installed on the
exterior edge of the concrete foundation
wall.
The
construction of the home features specialized hurricane - resistant structural reinforcement and windows for coastal storm conditions, spray foam insulation in the
wall cavities, rigid foam to eliminate thermal bridging, and a mix of fiber cement and cedar siding on the
exterior for long term durability and low maintenance.
Installation only requires one penetration through the
exterior wall, making it ideal for retrofit and new
construction projects alike.
In order to foster the utilization of passive energy sources, building codes should be adjusted so that new home
construction requires the largest surface area of the roof to face south, and kitchens be designed such that refrigerators be normally placed against
exterior walls in order to provide access for direct thermal exchange with cold winter air.
House Plans are fully integrated
construction drawing sets that include floor plans, framing plans and
wall framing elevations,
exterior elevations, building and
wall sections, and mechanical and electrical plans.
Assisted skilled workers with
construction projects in all phases of rough and finish carpentry.Applied paint to unfinished edges of plastic panels using a hand roller.Cut materials to specified sizes for installation using power saws and tile cutters.Painted
walls,
exteriors and interiors of buildings and furniture using brushes, rollers and spray guns.
• Particularly effective in roofing, repairing, re-roofing and insulating pre-installed roofs for commercial projects in a timely, organized and team oriented manner • Specialized expertise in EPDM, TPO, PVC and shingling • Skilled in carrying out maintenance and repair of mechanical, electrical and other physical structures • Well - versed in painting of structures, performing carpentry work, repairing plumbing fixtures and woodwork • Excellent physical stamina, ability to climb a ladder, bend, stoop and work in confined spaces • Special talent for metal roofing
construction including flashing,
wall panels, fascia and soffit • Apt at using various tools needed for cutting hammering and fastening roofing materials • Track record of completing projects in strict accordance with job specifications, project layout and applicable safety guidelines • Profound skills in installation of low sloped roof systems including TPO, BUR and bitumen • Proficient in carrying - out general roof repairs,
exterior siding adjustments and HVAC installation repairs • Particularly effective in removal and installation of all types of commercial roof systems including slate, tile and asphalt • Well practiced in covering roofs with topping material including sheets, PVC and spray foam • Adept at utilizing manual and electric tools and maintaining the same in a functional order • Efficient in laying and adhering insulation with metal fasteners or binding adhesives • Expert in cutting stripes of flashing and fitting into angles formed by
walls, vents and intersecting roof surfaces • Firsthand experience in carrying out regular preventive maintenance of pre-installed roofing systems • Substantial knowledge of various roofing systems and associated installation protocols • Familiar with OSHA workplace safety guidelines • Excellent listening skills with profound ability to follow verbal and written instructions to book • Great attention to detail with proven skills in interpreting and implementing given drawings and blueprints with accuracy • Strong numeracy skills, apt at generating accurate cost estimations for given projects
Professional Experience SMC
Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and
construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million
construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the
construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the
construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain
wall system • Completed project on schedule without disrupting the University's use of the 1st floor and
exterior • Oversee the $ 5.6 million
exterior renovation of the Anaheim Convention Center • Remove
exterior walls on 3 sides of the building and install complex new curtain
wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
constructionconstruction
A very low ceiling,
exterior wall surfaces inside the house, or anything else that may indicate
construction was done without a permit
At one hut, Larose has exposed one of the
exterior walls to show the
construction technique that employed a woven lattice of wooden strips called wattle.
More than 30 BASF employees worked on various aspects of
construction, installing roofs,
exterior walls and
exterior frames for the homes.
According to data from the Census Bureau's Survey of
Construction (SOC), vinyl (including vinyl - covered aluminum) was the most common
exterior wall material used in homes started in 2013 (31 percent), followed by brick or brick veneer (24 percent), stucco (22 percent), and fiber cement siding (such as Hardiplank or Hardiboard)(17 percent).
When your home renovation plans begin to resemble new - home
construction or additions — by expanding
exterior walls, adding a second story or replacing a carport with a big garage — it is time to consider your property boundaries.