The Egina FPSO cast anchor at the SHI - MCI quayside, LADOL Island, Lagos, after her 86 - day journey from South Korea to Nigeria on January 28, 2018 for the integration of six locally
fabricated topside modules.
Fully assembled and
fabricated, bent and installed all hydraulic and pneumatic lines of to H.P.U.'s, diverter's, jack up and B.O.P. control skids and various other
topside equipment, also subsea B.O.P's mux pods, acoustic pods and various other types of subsea equipment