Design and
facility equipment layout of a polysilicone manufacturing facility, using Speedikon 3D program and Microstation V8 to produce construction documents.
Not exact matches
But SolarCity was nonetheless essentially directing the
facility's
layout and making decisions about
equipment for future operations.
The $ 12 million
facility boasts a better design for warehouse
layout, more office space and a 100,000 - square - foot make - ready center where Coke Consolidated «s vending and fountain
equipment is serviced and readied for delivery to the market.
Our professional team of designers, drafters, project managers, and fabricators are equipped to provide you with
facility designs, concept
layouts,
equipment design, and fabrication of
equipment.
(Microstation v8) provided, Designed Gas Pipeline
facility for Oil Sands crude delivered to Port Arthur, Texas that required design of 2.4 Kv, 2000HP motors, LV & MV prefab modular substation
layout, PLC cabinets, instrument
layout,
equipment grounding, lighting...
Maintain conference room calendars, meeting schedules,
equipment requirements, catering needs, logistics and
facility layout.
Created
facility layouts for new
equipment, developed and maintained a new standard CAD drawing filing system.