The Federal Transit Administration (FTA) then issued a Record of Decision for the project signifying the end of
the federal environmental review process.
For its part, on page two of the new guidance, CEQ asserts that the effect of climate change «falls squarely» under the purview of
the federal environmental review process.
Garcia categorically disagreed with the argument that climate change falls outside of
the federal environmental review process.
A proposed project that is designed to improve traffic flow to and from the Peace Bridge is working its way through
the federal environmental review process.
Not exact matches
Political scientist Keith Brownsey of Mount Royal University argues the Liberals paid close attention to the many fumbles made by Harper's Tories on the energy file: failing to build solid relationships with First Nations, allowing
environmental groups to seize the public - relations initiative, not asserting
federal authority and handing provinces like B.C. and Quebec control of the political agenda, keeping Canada outside of the international consensus on climate change, and ignoring legitimate criticisms of the
federal review process.
In a 2012 study, Gerry Angevine and Vanadis Oviedo of the Fraser Institute described «outdated regulatory
processes and procedures, unnecessary duplication of
federal and provincial government project
reviews, and an unwieldy
environmental review process.»
According to the official website, FAST - 41, as it's known, «was designed to improve the timeliness, predictability and transparency of the
Federal environmental review and authorization
process for covered infrastructure projects.»
Mass Audubon has communicated its concerns to
federal and state officials, and we continue to participate in the environmental review processes through the Federal Energy Regulatory Commission, Massachusetts Environmental Policy Act, and other ag
federal and state officials, and we continue to participate in the
environmental review processes through the Federal Energy Regulatory Commission, Massachusetts Environmental Policy Act, and ot
environmental review processes through the
Federal Energy Regulatory Commission, Massachusetts Environmental Policy Act, and other ag
Federal Energy Regulatory Commission, Massachusetts
Environmental Policy Act, and ot
Environmental Policy Act, and other agencies.
That's when Council is scheduled to vote on North District Common Council Member Joe Golombek's resolution that calls for a
federal investigation of the
environmental review process undertaken by the state Department of Transportation for its proposed project at -LSB-...]
Since October 2011, new design - build legislation was enacted, a fast tracked
federal environmental review and concurrent procurement
processes have been completed, a project labor agreement with construction unions was negotiated, and construction activities commenced — all with an unprecedented level of transparency and community involvement.
«And this is why I appealed directly to the inspectors general of both the
Environmental Protection Agency and the
Federal Energy Regulatory Commission so that they could
review all the steps of the permitting
process that were possibly tainted by the undue influence from a top - ranking person in the governor's office.»
The Permitting Council is responsible for leading ongoing government - wide efforts to modernize the
Federal environmental review and permitting
process for major infrastructure projects and work with
Federal agency partners to implement and oversee adherence to the statutory requirements set forth in the FAST Act.
Under this approach, each major infrastructure project shall have a lead
Federal agency responsible for navigating the project through the
Federal environmental review and authorization
process, including the identification of a primary
Federal point of contact at each
Federal agency.
Both authorizations included a number of changes to
Federal law intended to streamline the
environmental review and permitting
processes for many transportation projects across the
Federal Government.
Recently, the Department sent a proposed regulatory change to the
Federal Register that will allow the
Federal Railroad Administration (FRA) to use the same streamlined
environmental review process as the
Federal Highway Administration (FHWA) and the
Federal Transit Administration (FTA).
(Sec. 1317) Directs DOT to examine ways to modernize and improve the NEPA
environmental review process for
federal - aid highway projects.
Title 41 of the FAST Act (FAST - 41)(42 U.S.C. § 4370m) created a new governance structure, set of procedures, and funding authorities designed to improve the timeliness, predictability, and transparency of the
Federal environmental review and authorization
process for covered infrastructure projects.
(A)
Federal environmental reviews and authorization
processes for infrastructure projects are consistent, coordinated, and predictable; and
In
processing environmental reviews and authorizations for major infrastructure projects,
Federal agencies shall:
Title 41 of this Act (42 U.S.C. § 4370m et seq.), referred to as «FAST - 41,» created a new governance structure, set of procedures, and funding authorities to improve the
Federal environmental review and authorization
process for covered infrastructure projects.
Canada is currently in the
process of
reviewing environmental acts, regulatory
processes, and the National Energy Board (a
federal regulatory body), with the intent of restoring lost
environmental protections and public trust in major project approvals.
The project is currently undergoing a
federal Department of Energy
Environmental Impact Statement (EIS)
review process to evaluate potential impacts from the 720 - mile high voltage direct current transmission project.
The
Environmental Protection Agency's proposed repeal of the CPP was published in the
Federal Register on October 10th, triggering a lengthy
review and public comment
process — plus legal battles that could stretch on for years.
Many proposed solar power plants are planned for
federal land, and the need to undergo
federal environmental review has complicated the licensing
process as disputes have arisen over the industrial projects» impact on endangered wildlife like the desert tortoise and on scarce water supplies.
The US Senate Environment and Public Works Committee's Ranking Minority Member strongly criticized
Environmental Protection Agency Administrator E. Scott Pruitt's plans to adopt a «back to basics»
process for
reviewing the
federal Clean Air Act's National Ambient Air Quality Standards.
The dismissal of Andrew Frank, spokesman for anti-oil-sands group ForestEthics, comes amid an increasingly tense atmosphere among
environmental groups — especially those registered as charities, whose public advocacy is supposed to be limited — that have come under fire by the
federal government for harbouring «radicals» intent on «hijacking» the
review process for Gateway.
This opportunity is perhaps most pronounced in the
reviews of
federal environmental assessment
processes and the National Energy Board (NEB).
Prime Minister Trudeau has mandated no fewer than five cabinet ministers (Environment and Climate Change, Natural Resources, Fisheries, Indigenous and Norther Affairs, and Science) with
reviewing federal environmental assessment
processes, with the aim of introducing «new, fair
processes.»
They also made the
environmental law rollbacks an election issue in 2015 and led the Prime Minister to direct his cabinet ministers to undertake the
review of four major
federal environmental laws,
processes and bodies: the Fisheries Act, Navigation Protection Act,
environmental assessment
processes and the National Energy Board.
In November 2015, the Prime Minister mandated several Cabinet Ministers to
review four of Canada's
environmental laws and
processes: the Fisheries Act, Navigation Protection Act, the National Energy Board, and
federal environmental assessment
processes.
Legal materials to be filed in the
Federal Court of Appeal will demonstrate that, among other things, the NEB lacked legal authority to start its review process because of the federal government's failure to first consult Tsleil - Waututh on key decisions about the environmental assessment and regulatory review of the p
Federal Court of Appeal will demonstrate that, among other things, the NEB lacked legal authority to start its
review process because of the
federal government's failure to first consult Tsleil - Waututh on key decisions about the environmental assessment and regulatory review of the p
federal government's failure to first consult Tsleil - Waututh on key decisions about the
environmental assessment and regulatory
review of the project.
Gillian also regularly works on
environmental assessment
reviews as well as other
federal and provincial regulatory
review processes.
Since the recent
federal election there has been much discussion (and as my colleague Eugene Kung notes, an abundance of open letters) about the Liberal party's election promise to «
review Canada's
environmental assessment (EA)
processes and introduce new, fair
processes» for
reviewing projects (or re-
reviewing them, as in the case of major proposals like the controversial Kinder Morgan and Energy East oil sands pipeline and tankers projects).
Thank you for the opportunity to participate in this
review of
Federal environmental assessment
processes.
Federal reviews of environmental assessment processes and the National Energy Board: The federal government recently announced several long - awaited reviews of environmental legislation including reviews of the Canadian Environmental Assessment Act, 2012 (CEAA), the National Energy Board (NEB) by two independent
Federal reviews of
environmental assessment processes and the National Energy Board: The federal government recently announced several long - awaited reviews of environmental legislation including reviews of the Canadian Environmental Assessment Act, 2012 (CEAA), the National Energy Board (NEB) by two indepe
environmental assessment
processes and the National Energy Board: The
federal government recently announced several long - awaited reviews of environmental legislation including reviews of the Canadian Environmental Assessment Act, 2012 (CEAA), the National Energy Board (NEB) by two independent
federal government recently announced several long - awaited
reviews of
environmental legislation including reviews of the Canadian Environmental Assessment Act, 2012 (CEAA), the National Energy Board (NEB) by two indepe
environmental legislation including
reviews of the Canadian
Environmental Assessment Act, 2012 (CEAA), the National Energy Board (NEB) by two indepe
Environmental Assessment Act, 2012 (CEAA), the National Energy Board (NEB) by two independent panels.
Toyota Engineering and Manufacturing North America (Princeton, IN) 10/2001 — 5/2010 Technician / Skilled Maintenance Team Leader • Provided support and technical expertise on Allen Bradley PLC - 5 and Control Logic, as well as designed new screens for HMI using RSView and mapped all data and alarms needed for monitoring production equipment • Programmed PLC's using Rockwell software as required by production, utilizing PLC as a troubleshooting tool to locate and repair
process problems • Repaired and maintained all three phase medium and low voltage motors, programming medium voltage control relays to meet manufacturer specifications and monitor applicable data from motors as well as engineering data and motor manufacturing parameters into VFD's • Established PM schedules for maintaining floor conveyors, robots, RFID, air handling, sludge, paint mix room, and lifters, assisting T / M's with performing preventative maintenance on equipment • Ensured calibration of
environmental equipment to maintain state and
federal guidelines, performing the calibration procedures and repair of micrometers, calipers, and profilometers as required by ISO standards • Identified and developed countermeasures to manufacturing - related problems with equipment, monitoring corrective actions and resolution implementation to ensure problems were below 2 % of operational availability •
Review associated work instructions for changes as needed to maintain quality, safety, and
environmental standards, while planning and coordinating weekly safety meetings and training for team members