What was once considered a sure -
fire sign of life on distant planets may not be so sure - fire after all, a new study suggests.
Not exact matches
After the equally outstanding McKay, one
of three
of six Forest summer
signings to start,
fired in the opener Forest continued to lead a charmed
life.
Characteristics:
Fire Signs, you are the
life of the party!
The
fire signs are lovers
of the chase and certainly like a challenge when it comes to their love
lives.
The Tree
of Life opens with a biblical quote, a sure
fire sign that any film will be just brimming with self - importance.
From the
signing of the contract to the completion
of my two books,
Fire Up Your
Life!
, you are lying on the floor
of your place looking up, a small draft runs through the room, between the door and the window, and all things seem perfectly still, wind only disturbs concrete in imperceptible ways, or it may take millions
of years to be noticed and, as the air runs through the space, all your plants move and all is animated and all is alive somehow, and here are the thoughts
of all men in all ages and lands, they are not original with me, and that wind upon your plants is the common air that bathes the globe, and we have no ambitions
of universalism, and I'm glad we don't, but the particles
of air bring traces
of pollen and are charged with electricity, desert sand, maybe sea water, and these particles were somewhere else before they were dragged here, and their route will not end by the door
of this house, and if we tell each other stories, one can imagine that they might have been bathed by this same air, regrouped and recombined, recharged as a vehicle for sound, swirling as it moves, bringing the sound
of a drum, like that Kabuki story where a fox recognizes the voice
of its parents as a girl plays a drum made out
of their skin, or any other event, and yet I always felt your work never tells stories, I tend to think that narrative implies a past tense, even if that past was just five seconds ago, one second ago was already the past, and human memory is irrelevant in geological time, plants and fish know not what tomorrow will bring, neither rocks nor metal do, but we all
live here now, and we all need visions and we all need dreams, and as long as your metal sculptures vibrate they are always in the Present, and their past is a material truth alien to narrative, but well, maybe narrative does not imply a past tense at all and they are writing their own story while they gently move and breathe, and maybe nothing was really still before the wind came in, passing through the window as if through an irrational portal to make those plants dance, but everything was already moving and breathing in near complete silence, and if you're focused enough you can feel the pulse
of a concrete wall and you can feel the tectonic movements
of the earth, and you can hear the magma flowing under our feet and our bones crackling like a wild
fire, and you can see the light
of fireflies reflected in polished metal, and there is nothing magical about that, it is just the way things are, and sometimes we have to raise our voice because the music is too loud and let your clothes move to a powerful bass, sound waves and bright lights, powerful like the sun, blinding us if we stare for too long, but isn't it the biggest
sign of love, like singing to a corn field, and all acts
of kindness that are not pitiful nor utilitarian, that are truly horizontal as everything around us is impregnated with the deadliest violence, vertical and systemic, poisonous, and sometimes you just want to feel the sun burning your skin and look for
life in all things declared dead, a kind
of vitality that operates like corrosion, strong as the wind near the sea, transforming all things,
And I realized I had to do something 1983 Rammelzee vs K Rob «Beat Bop» 1984 First shows at Clarissa Dalrymple and Nicole Klagsbrun's Cable Gallery (artists
of Wool's generation who begin showing same period include Philip Taaffe Jeff Koons Mike Kelley Cady Noland and James Nares 1984 produces first book photocopied edition
of four: 93 Drawings
of Beer on the Wall 1984 Warhol Rorschach paintings 1986 First pattern paintings 1987 Joins Luhring Augustine Gallery 1987 First word paintings 1988 Collaborative installation with Robert Gober one painting by Wool (Apocalypse Now) one sculpture by Gober (Three Urinals) one collaborative photograph (Untitled) and a mirror Gary Indiana contributes a short piece
of fiction to the accompanying publication 1988 In Cologne sees show
of Albert Oehlen's work meets Martin Kippenberger 1988 First European shows Cologne and Athens 1988 Collaborates with Richard Prince on two paintings: My Name and My Act 1989 Museum Group shows in Amsterdam Frankfurt am Main and Munich Whitney Biennial 1989 One year fellowship at the American Academy in Rome 1989 Starts taking photographs 1989 Publishes Black Book an oversized collection
of 9 - letter images 1989 Fall
of the Berlin Wall 1990 Meets Larry Clark 1991 First survey mounted at Boymans - Van Beuningen Museum Rotterdam publishes accompanying artist's book Cats in Bag Bags in River color photocopies
of photographs
of black and white paintings 1991 Creates edition
of small paintings for ACT - UP New York Needle Exchange 1991 Participates in Carnegie International includes painting and billboard with truncated text announcing «THE SHOW IS OVER» 1991 Meets Jim Lewis 1991 Relocates studio to East 9th Street in New York 1992 LA riots 1992 DAAD residency in Berlin 1993 Publishes Absent Without Leave 160 black - and - white images from travel photographs taken over previous 4 years 1993 Begins silkscreened flower paintings 1993 Meets Michel Majerus 1994 Makes road -
signs for Martin Kippenberger's Museum
of Modern Art Syros 1994 New York Knicks lose to Houston Rockets in Game 7 NBA Finals 1995 Organizes retrospective
of the New Cinema late 70's New York underground Super-8 films 1995 First spray - paintings 1995 Kids 1996 East Village studio severely damaged in building
fire leaving Wool without a working space for 8 months artist's insurance photos become portfolio Incident on 9th Street 1997 Marries painter Charline von Heyl 1998 Museum
of Contemporary Art Los Angeles mounts mid-career retrospective travels to Carnegie Museum
of Art Pittsburgh and Kunsthalle Basel 1998 Begins silkscreen re-imaging
of own work 2001 Solo exhibition at Secession Vienna 2002 «Grey» paintings 2003 East Broadway Breakdown photos
of New York City 2005 First digital drawings 2006 Contributes art to Sonic Youth Rather Ripped 2007 Collaborates with Josh Smith on Can Your Monkey Do the Dog 2008 Collaborates with Richard Hell on Psychopts 2008 Christopher Wool
lives and works in New York and Marfa Texas
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition
of the existing parking lot and construction
of new 458 parking spaces • Install new lighting and «
fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construc
fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee
signs • Oversee an $ 18 million construction project for the Ventura County
Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construc
Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot
of classroom building • Construct classrooms,
fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construc
fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction
of the Gold LEED Huntington Library • Oversee demolition
of existing library in accordance with city regulations • Manage the construction
of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team
of more than 120 workers a day for refurbishment
of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation
of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use
of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation
of the Anaheim Convention Center • Remove exterior walls on 3 sides
of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use
of the convention center during ongoing construction