Named by English settlers,
the first dam built in the city was in 1842 but the city itself was officially established and incorporated in 1856.
Not exact matches
Horgan said that in announcing the decision to
build the
dam, Premier Clark glossed over very serious issues around consultation with
First Nations that have yet to be addressed.
For the
first time in the two decades since it was
built, the
dam's reservoir was full last year, slowing down the Olifants's flow through the crocodiles» gorge.
«One of
first things the settlers did was to clear the forests for agriculture and
build tens of thousands of
dams to run their mills,» says Walter.
Since Egyptians
built the
first known
dam around 2500 BCE, water managers have expected rivers to continue behaving as they have in the past.
Boundary
Dam will be the
first CCS project
built on a commercial - scale power station.
When we
first meet Ms. Ryan's character, Alice Bowman, she and her husband, Peter (David Morse), an American engineer supervising the
building of a
dam in Tecala, are bickering.
Weight has been reduced by 225 pounds, the frame is
built from 98 percent high - strength steel for increased payload and towing, and the segment's
first - ever deployable front air
dam will work in conjunction with the mild hybrid systems to improve fuel economy.
Cars which feature additional Cibie driving lamps and Vantage style air
dams and flip - tails are a non-standard modifications added sometimes many years after the cars were
first built.
Early San Francisco Water In 1858, John Bensley
dammed Lobos Creek at its mouth near Baker Beach and
built a redwood flume that carried the water around to Fort Point and modern - day Fort Mason, marking the advent of the city's
first permanent water supply.
They also
build upon the collective histories of their chosen medium — clay as nature, clay as origin, clay as shelter, clay as
dam, clay as vessel, clay as terra firma — and choose to play with those histories in their attempts to give the viewer pause while, simultaneously, addressing twenty -
first - century aesthetics and concerns.
Since the 1970s, when plans were
first conceived to
build a massive hydroelectric
dam along the Xingu river in the heart of the Brazilian Amazon, the forces of development have had to contest with unyielding voices of protest --
There was much controversy when the
dam was
built in the 1970s, as land was taken from many
First Nation families.
Large - scale CCS projects in the power sector are now a reality, demonstrated by: * The world's
first large - scale power sector CCS project — the Boundary
Dam Integrated Carbon Capture and Sequestration Demonstration Project in Canada (CO2 capture capacity of 1 Mtpa)-- becoming operational in October 2014 * Commissioning activities on a new -
build 582 megawatt (MW) power plant beginning at the Kemper County Energy Facility in Mississippi (US, CO2 capture capacity of 3 Mtpa) with CO2 capture expected to commence in the
first half of 2016 * The Petra Nova Carbon Capture Project at the W.A. Parish power plant near Houston, Texas (US, CO2 capture capacity of 1.4 Mtpa) entering construction in July 2014, with CO2 capture anticipated by the end of 2016.
While the ice
build up is likely slow due to decreasing temps, the eventual increasing temperature begins to melt massive ice
dams slowly at
first with little change down stream.
In the
first place, he describes the
dam -
building boom in Brazil as a crisis of astronomical proportions.
In one of the day's
first hints of potential controversy, though, Eroğlu also called
building dams «an absolute necessity» for water - poor Turkey, though such projects face stiff opposition from environmentalists and preservationists.
In a brilliant moment of foresightedness, the engineers that
first erected the
dam in the early 1980s
built it on top of gypsym, which dissolves upon contacting water.
Oregon's
first hydroelectric power station, the T.W. Sullivan
Dam at Willamette Falls in Oregon City,
built in 1888, is of the same general vintage.
It will also be the
first big
dam built in the province since 1984 and will become B.C.'s fourth - largest producer of electricity.
It argued that it had statutory authority to
build and operate the
dam, that the
First Nations must first prove any Aboriginal Title as against the Crown and that the action was just a backdoor attack on the Crown's approval of the
First Nations must
first prove any Aboriginal Title as against the Crown and that the action was just a backdoor attack on the Crown's approval of the
first prove any Aboriginal Title as against the Crown and that the action was just a backdoor attack on the Crown's approval of the
dam.