Constellation Energy has a ribbon - cutting to mark the start of the state's
first wind turbine project.
Not exact matches
That's especially true since the future of Cape
Wind, a proposed 100 - turbine project off the coast of Cape Cod in Massachusetts, had been a contender for the nation's first offshore wind f
Wind, a proposed 100 -
turbine project off the coast of Cape Cod in Massachusetts, had been a contender for the nation's
first offshore
wind f
wind farm.
project — the nation's
first, tribal - owned, large scale
wind turbine on the Rosebud Sioux reservation in South Dakota.
Keurig Green Mountain coffee roasters challenged their own success with voluntary carbon reduction targets and, in partnership with NativeEnergy, helped create the Alex Little Soldier
Wind Turbine project — the nation's first, tribal - owned, large scale wind turbine on the Rosebud Sioux reservation in South Dak
Wind Turbine project — the nation's first, tribal - owned, large scale wind turbine on the Rosebud Sioux reservation in South
Turbine project — the nation's
first, tribal - owned, large scale
wind turbine on the Rosebud Sioux reservation in South Dak
wind turbine on the Rosebud Sioux reservation in South
turbine on the Rosebud Sioux reservation in South Dakota.
The
first projects using floating
wind turbines are also now entering into operation, based on concepts widely deployed in the offshore oil and gas sector; cost - competitive floating technologies would widen the economic resource base for offshore electricity generation considerably.
Intertribal COUP has flourished since it helped build the
first large commercial - scale
wind turbine project on the Lakota Sioux Rosebud Reservation in South Dakota in 2003.
First, the commissioning of Deepwater
Wind's 30 MW, five -
turbine Block Island demonstration
project off Rhode Island, the only
project in U.S. waters, gave the domestic industry a big boost.
Turbine blades that broke were
first two to be turned on Huron Daily Tribune Brenda Battel 4 November 2016 BLOOMFIELD TOWNSHIP — The two blades that broke on separate
wind turbines last month were the
first two to be turned on in the startup phase of the Deerfield
wind project.
Block Island
Wind Farm, America's first offshore wind farm, is a 30 - megawatt, 5 turbine project that began commercial operations off Rhode Island in 2
Wind Farm, America's
first offshore
wind farm, is a 30 - megawatt, 5 turbine project that began commercial operations off Rhode Island in 2
wind farm, is a 30 - megawatt, 5
turbine project that began commercial operations off Rhode Island in 2016.
First, Thursday April 13th saw a disclosure from the Energy Ministry that Ontario paid out $ 28,095,332 including about $ 240,000 in interest to Windstream Energy to satisfy the award made to them under the NAFTA (North American Free Trade Agreement) tribunal, due to cancellation of a 300 - MW offshore industrial
wind turbine project.
Both Vietnam and Spain added offshore
wind capacity for the
first time, as did the United States, although the U.S.
project was one very small demonstration
turbine off the coast of Maine.
The GE subsidiary will provide its latest generation of 3.6 - 137
wind turbines for the
project, which is its
first in the country, they said.
But sometimes community - based
projects, like
wind turbines at public schools, don't have enough funding to be built in the
first place.
As our
first Help Build ™ carbon
project, we helped the Rosebud Sioux develop the
first tribally owned large - scale
wind turbine.
The
first phase of the
project, which came on line in 2001, consists of sixteen
wind turbines that can generate up to 24 megawatts (MW) of electricity [see picture above].
The
first is that floating can quickly make the most of hard - won lessons learned in conventional offshore
wind — in areas such as technology development,
turbine scale - up,
project management and supply chain streamlining.
If this
project were to proceed, it would be the
first time anywhere in the world that a large industrial
wind turbine project had been sited near shore in a fresh water lake that is this close to an Ontario Heritage Site and highly populated residential communities.
The USFWS issued its
first interim guidance about how
wind project developers could avoid impacts to wildlife from wind turbines in 2003, and replaced these with a «tiered» approach outlined in the Land - Based Wind Energy Guidelines (2012 LBWEGs), developed with the wind industry starting in 2007 and released in final form by the USFWS on March 23, 2
wind project developers could avoid impacts to wildlife from
wind turbines in 2003, and replaced these with a «tiered» approach outlined in the Land - Based Wind Energy Guidelines (2012 LBWEGs), developed with the wind industry starting in 2007 and released in final form by the USFWS on March 23, 2
wind turbines in 2003, and replaced these with a «tiered» approach outlined in the Land - Based
Wind Energy Guidelines (2012 LBWEGs), developed with the wind industry starting in 2007 and released in final form by the USFWS on March 23, 2
Wind Energy Guidelines (2012 LBWEGs), developed with the
wind industry starting in 2007 and released in final form by the USFWS on March 23, 2
wind industry starting in 2007 and released in final form by the USFWS on March 23, 2012.
Deepwater
Wind's 30 MW, five - turbine Block Island Wind Farm off Rhode Island's coast will be the first operating U.S. offshore wind project when goes online this y
Wind's 30 MW, five -
turbine Block Island
Wind Farm off Rhode Island's coast will be the first operating U.S. offshore wind project when goes online this y
Wind Farm off Rhode Island's coast will be the
first operating U.S. offshore
wind project when goes online this y
wind project when goes online this year.
Andy Holt, general manager of global
wind projects and services, said: «This is the
first facility of its kind dedicated to developing repair technologies and capabilities that reduce the life cycle cost of
wind turbines.
This must be our
first course of climate protective, cost - reducing action, followed by solar, then current and wave
turbines (Eastport, ME) and lastly the more expensive, but community - managed
wind projects such as Princeton, MA.
Siemens Gamesa, Spain's leading
wind turbine OEM, recently secured a new order for the supply of the
turbines for Cepsa's
first wind farm, a
project with which the Spanish energy player is diversifying its business into the renewables arena.
This single
turbine project is the Mandan, Hidatsa, and Arikara Nation's
first step in
wind development.
«Led by the University of Maine, this
project represents the
first concrete - composite floating platform
wind turbine to be deployed in the world — strengthening American leadership in innovative clean energy technologies that diversify the nation's energy mix with more clean, domestic energy sources,» the DOE said in a press release as the VolturnUS demo
turbine went into the Penobscot River on Friday.
It's the latest
project globally to pair
wind power with batteries — just a couple of days ago BP announced a tie - up with Tesla on a pilot
project in the US and Siemens Gamesa provided the
wind turbines charging Batwind, a
project in Scotland testing the real - world performance of batteries paired with the world's
first floating
wind farm.
Developed
project teams, coordinated with HR in hiring and terminating of individuals Projects: • Milford Wind Corridor Project Phase I, Milford, UT Client: First Wind, 4/2009 - Present Scope: $ 70M BOP Contract, Includes design and construction of collector system, substation, 89 miles of 345kv transmission line, operations and maintenance facility, SCADA system, access roads, turbine foundations, erection, and tower wiring as necessary to support (58) Clipper 2.5 MW C - 99 generators and (39) GE 1.5 MW XLE generators; a total of 204MW potential
project teams, coordinated with HR in hiring and terminating of individuals
Projects: • Milford
Wind Corridor
Project Phase I, Milford, UT Client: First Wind, 4/2009 - Present Scope: $ 70M BOP Contract, Includes design and construction of collector system, substation, 89 miles of 345kv transmission line, operations and maintenance facility, SCADA system, access roads, turbine foundations, erection, and tower wiring as necessary to support (58) Clipper 2.5 MW C - 99 generators and (39) GE 1.5 MW XLE generators; a total of 204MW potential
Project Phase I, Milford, UT Client:
First Wind, 4/2009 - Present Scope: $ 70M BOP Contract, Includes design and construction of collector system, substation, 89 miles of 345kv transmission line, operations and maintenance facility, SCADA system, access roads,
turbine foundations, erection, and tower wiring as necessary to support (58) Clipper 2.5 MW C - 99 generators and (39) GE 1.5 MW XLE generators; a total of 204MW potential output.