Sentences with phrase «folded seam allowance»

Then sew the folded seam allowance shut after folding and ironing.
After the zipper was sewn in, she sewed the facing to the top edge of the dress, folded the seam allowance under along the facing's zipper edge and hand stitched it in place.
Fold the seam allowance up and stitch through all layers with a zig zag stitch.
Fold the seam allowance in and close the opening using small ladder stitches.

Not exact matches

The seam allowance must be folded under while topstitching, as in step 11, so you must leave space for it!
Fold strip of fabric lengthwise, right sides together, and sew with a 1/4» seam allowance, as shown in the photo.
Then, I hand - sewed the waist stay to the seam allowance of the skirt and folded over each end and hand - stitched in two hook - and - eyes so I could secure it to my waist when worn.
My 2 ″ seam allowance turned into about 1 ″ after all the folding.
Hem both folded - under sides, leaving a 1 / 2 - inch seam allowance, with white outdoor thread ($ 4.99 for 200 yards; joann.com).
Fold piece C lengthwise in half and sew along the long open side using a 1/2 ″ seam allowance.
One of these will need to go around your waist so it'll be twice as long.Width of the strap is 2.5 cm (1 inch), so I'll have to cut it as 5 cm (2 inch) plus seam allowance, as the strips will be folded, sewn, and then turned out.
Once we were happy with the placement, we then folded under the seam allowance of the text printed panel and pinned the two edges in place, so that the dancers and «horizon line» along the base of the border print matched.
Understitch the lining back neck by folding the entire seam allowance to the lining side and sewing on the outer lining side close to the seam edge.
Fold back the skirt facing at the notch, wrapping the zipper tape seam allowances towards the back.
Trim the seam allowance on your waistband and then fold the waistband up and press it smooth and flat.
Then I pinned down both the waist insets (which first needed to be folded and ironed at their seam allowances), saving the gathering for last.
Step Five: Add 6 cm to each measurement (2 cm for a fold - over seam allowance and 4 cm for extra give in the trim).
A lapped seam is when you fold under the seam allowance on one side, and then topstitch it to the other side.
I took my circumference of 59 ″ +.5 ″ for seam allowance and 19 ″ height + 3 ″ for the fold + 1 ″ seam allowance -LRB-.5 ″ on top and.5 ″ on the bottom) + 2 ″ for slack at the bottom of the bag and made the cuts for the rectangle.
a b c d e f g h i j k l m n o p q r s t u v w x y z