Sentences with phrase «for peak loads»

More gas turbine are being installed but these only have a relatively small output and are used for peak loads, not load control.
While we can expect that PV will likely be cheaper in the future, solar updraft towers could provide an economically - viable alternative to «PV + energy storage» for peak load (as solar updraft towers can store thermal energy in the ground for night electricity production to greatly reduce intermittency at minimal additional cost).

Not exact matches

Powerpack systems support applications including peak shaving, load shifting and demand response for commercial customers while offering renewable firming and a variety of grid services at utility scales.
Large price spikes immediately before and after mid-day periods when both utility - scale and distributed solar generation reaches its peak level suggest a need for dispatchable generation sources to help cover ramping periods, when the need for power from the grid to meet load is rapidly changing.
Vector was able to replace the need for expensive and time consuming conventional upgrades to its substation by installing a 1MW / 2.3 MWh Powerpack system, which is purposed to reduce grid load during high peak times.
The Arizona project was called out due to its load shifting nature — allowing for solar power to be used during the early evening peak demand period.
With a contract now in place between Tesla and the Australian Energy Market Operator (AEMO), the battery «will help solve power outages, reduce intermittencies, and manage summertime peak load to support the reliability of South Australia's electrical infrastructure, providing enough power for more than 30,000 homes — approximately equal to the amount of homes that lost power during the blackout period last year,» Tesla said in a statement.
We look forward to this all year long, and with good reason: When picked at the peak of ripeness, this grain is loaded with sweet, tender kernels that are great for boiling and slathering with butter, grilling, sautéing, or just eating raw.
He loaded the equipment into some university trucks and set out for the school's weather observatory at Cheeka Peak.
In the report, IEA says it expects concentrated solar power to become competitive for peak and mid-peak loads by 2020 in the sunniest places.
One would count on always being able to get some contribution from the dams, which after all can store up water (and thus the energy derivable from it) for whenever the peak load occurs.
Comparing the use of free weight or machine resistance for the power clean performed from the mid-thigh position, Jones et al. (2008) found that 1RM and average power were greater when using free weights but velocity (average and peak) was greater when using the machine loading.
This suggests that light loads in the mid-thigh pull are best for maximising power outputs, while heavy loads are best for maximising peak force production, as with many other weightlifting derivatives.
As the periods grow so does the cumulative stress load which is where the athlete does not fully recover from the training during the peak period of training volume for each period and why a recovery period.
For example, when comparing constant load (free weight) and constant resistance (pneumatic machine) bench presses, the constant resistance bench presses involve higher peak velocities, because they allow greater acceleration at the start of the movement (Frost et al. 2008).
And assuming that maximal bar speed is attempted, this produces a different peak velocity for the same force when using each external load type.
Controlling for relative load, the use of accommodating resistance appears to increase both mean and peak bar velocity.
Dosage: Many clients take 2 capsules of Natural D - Hist 2 - 3 times per day for 10 days as a loading dose during peak allergy time and continue taking 1 - 3 capsules daily as a maintenance dose.
Comparing the effects of different training variables, Swinton et al. (2011a) explored the effects of relative load between 10 — 80 % of 1RM and found that power outputs increased to a peak at 30 % of 1RM for straight bar deadlifts and to a peak at 40 % of 1RM hexagonal bar deadlifts, before reducing to a minimum at 80 % of 1RM.
The reason for the CA - specific 3 - week test administration window appears to be to spread out the peak processing load problem for Smarter Balanced's test administration platform vendor (AIR), to insure CA's load doesn't occur all at the same time and cause the system to crash.
Under full load and at peak revs it's a match for the 488GTB «box.
The 2017 Honda Accord Hybrid starts at $ 29,605 for the base Hybrid model and peaks at $ 35,955 for the loaded Touring trim level that I was able to test with its leather trim, Apple CarPlay and Android Auto, navigation and more.
Base prices for the Civic line start at about $ 13,000 and peak on an option - loaded Si.
In addition, the electric pump is able to support the mechanical pump when peak loads apply, enabling a more compact and efficient design for the mechanical pump.
Structural fatigue tests that run the engine at full load for more than 17 straight days — the majority of the time at peak torque and power.
The 2016 Cadillac CT6 starts at $ 54,490 for the base model with the 2.0 T with rear - wheel drive (including a $ 995 destination charge) and peaks at $ 88,460 for the fully - loaded, all - options 3.0 TT Platinum with all - wheel drive.
The peak 44o lb - ft of torque kicks in at just 1,750 rpm for towing and heavy load hauling.
At first glance you'll see its bold rims and geometric, boomerang - style front fascia, but once you take it for a test drive you'll see this lightweight car will save you a trunk - load of cash with a peak fuel economy of 30 mpg city, 40 mpg highway.
Not all are in the blue - collar sector: hands and backs to work on the loading dock for a day or two during peak periods.
Loaded with the richly - nourishing proteins and fats that all puppies require for peak health and development, ORIJEN PUPPY's low - carbohydrate, low - glycemic formula supports stable blood sugar levels while delivering all of the energy that active puppies need to take on their exciting world.
Since they were presumably going to operate as base load as opposed to peaker power, it's likely they were intending to sign long term contracts so that their incremental addition to the demand for coal would be absorbed not by creating an additional demand on the spot market but by identifying a fixed source with a standing order and putting a few American miners to work on a full - time basis.
Wind, for example, you will find discussed in terms of energy needed, costs, energy produced, whether it can serve as peak load, base load, mini-generators, Liebig's Minimum, locations... etc..
(note there is some energy demand management that is is / has been already used to reduce the need for peak power supply; I don't know offhand how much there is and what it would look like if this were simply reshifted to reduce the need for backup power supply, which would be like peaking and load - following plants now.
As battery cars and plug - hybrids become more common the storage capacity and load - shifting (for charging) of the transportation fleet becomes very favorable in terms of load management — ditto the potential to use the fleet of parked batteries to assist during peak loads.
I think, to spur its development, we need electricity pricing that encourages investment in load - shifting, a guaranteed return for delivering a megawatt - hour at peak demand for more than it costs at the time of peak excess supply.
Peak loads correlate very well with solar availability (for obvious reasons) but locally the peak lasts later than the sun dPeak loads correlate very well with solar availability (for obvious reasons) but locally the peak lasts later than the sun dpeak lasts later than the sun does.
In June I heard a report about a new EU - wide study done in the UK that showed clearly that by combining all forms of renewables: wind all over Europe, solar in North Africa, hydo, hydro storage, solar thermal, and demand management, you could meet a slowly growing EU load with almost no natural gas for peaking plants to help level the load.
We have existing infrastructure for large - scale electricity transport, much of which is unused most of the day due to the need to handle short - term peak loads.
Energy Commission staff will present their analysis of recent loads in the Pacific Gas and Electric (PG&E), Southern California Edison (SCE), San Diego Gas & Electric (SDG&E) areas of the California Independent System Operator (California ISO) territory, and their updated forecasts of 2010 peak demand for those areas.
That accounts for a couple percentage points of the city's 180 - megawatt peak load.
As long as solar is a relatively small part of the mix, it actually helps level the load curve, because demand is so much higher during the day than at night, and particularly if you have a lot of nuclear in the mix, solar will reduce the need for peaking generation.
This is particularly relevant for power systems where the peak load is expected to increase at the same time as conventional power plants to be replaced by intermittent renewable power generation.
It should account for the regular cycling of energy efficient units during the period of annual peak load.
It reflects the changes in the demand for electricity resulting from a utility DSM program that is in effect at the same time the utility experiences its annual peak load, as opposed to the installed peak load reduction capability (i.e., potential peak reduction).
CategoriesCSP News & AnalysisTags6 cent solar, Aurora, heliostat research, Port Augusta, receiver research, record low price, Sandia, solar for after dark, solar for evening peak load, SolarReserve, South Australia
CategoriesCSP News & AnalysisTagsArizona, Arizona Public Service (APS), California, cheaper than natural gas, csp competes with natural gas, Solar Dynamics LLC, solar for after dark, solar for evening peak load, solar peaker
CategoriesCSP News & AnalysisTags6 cent solar, Aurora, contract, csp competes with natural gas, Port Augusta, record low price, solar for after dark, solar for evening peak load, South Australia
The area infrastructure is set for July and August, so if we get 50 % of the peak load the beach can handle it (we have over 15 km of really good beaches).
The «killer» quote is surely this: «The normalised load factor for UK onshore wind farms declines from a peak of about 24 % at age 1 to 15 % at age 10 and 11 % at age 15.»
The call for tenders specifies the total amount of capacity required, the time lines for capacity establishment, the fuel options as defined in the Government's power plant establishment plan, the type of plant (base load, load following, peaking capacity), possible transmission constraints that have to be taken into account, and in certain cases a price cap, i.e. maximum average price that the new plant can be expected to earn throughout its economic life.
a b c d e f g h i j k l m n o p q r s t u v w x y z