Not exact matches
The state - run nuclear power plant
operator was preparing
for further cyber-attacks after its data was leaked on a blog and to a Twitter account under the profile «president of anti-nuclear
reactor group.»
Indian Point
operator Entergy had successfully fought to delay those tests to once every 15 years
for the plant's Unit 2
reactor, but the state had challenged that, arguing they should be conducted once a decade.
Transfers of casks from operating
reactors could follow, and the report authors said that would help resolve a long - running court dispute over payments nuclear plant
operators are required to make to the federal government in return
for federal storage of the spent fuel — a bargain the federal government has not kept.
When the
reactor malfunctions or when
operators need to shut off the
reactor for any other reason technicians can remotely plunge control rods into the
reactor core to soak up neutrons and shut down the nuclear reaction.
The TEPCO
operators of the stricken nuclear power plant — a minimal staff of 50 as all non-essential personnel have been evacuated — now face a balance between venting the steam building up in the
reactor (since the main danger
for a widespread release of radioactive material is steam bursting the thick steel container holding the
reactor) and keeping any radioactive materials inside the power plant itself.
The problem of spent fuel storage Nuclear
reactor operators must store spent fuel removed from
reactor cores
for several years at least, in large pools at
reactor sites until the remaining heat from the uranium fuel cools sufficiently.
Klein said that the NRC's initial approach to the danger to
reactor wiring in a fire would have imposed impossible conditions on some
reactor operators, which have no practical way,
for example, of relocating built - in wire channels to create more separation between wiring networks and backups.
But it took until 2001
for the NRC to require
operators of
reactors prone to the potential problem to check
for it, a process that had not been completed at Davis - Besse.
The collaboration will also include the near - term objectives of confirming projected construction and operating costs, as well as the identification of a lead plant owner /
operator for the
reactor.
He determined that if the
reactor operator walked out to the pool every hour & 1/2 and urinated in it, the evaporative loss would be made up
for.
But in periods when industrial demand
for electricity has been stronger, a
reactor shutdown has sometimes forced grid
operators to scramble.
Greenpeace had told them that the EPR and AP1000
reactor designs were untried and untested anywhere in the world; and that the vendors and
operators of the potential new
reactors had not yet presented firm plans
for the longer - term storage of spent fuel.