Sentences with phrase «frame construction allowed»

Perimeter frame construction allowed repositioning the engine six inches forward in the frame, thus lowering the transmission hump and increasing interior room.
The CVPI's body - on - frame construction allowed inexpensive repairs after collisions without the need to straighten the chassis.
Perimeter frame construction allowed positioning of the engine forward in the frame, thus lowering the transmission hump and increasing interior room.
The absence of traditional body - on - frame construction allows for another feature no other truck product can claim - a spacious In - Bed Trunk with secure storage like a car.

Not exact matches

All furniture frames incorporate kiln dried hardwood and solid timber constructions and are designed to allow the use of the Black Cat cushion support system or No - Sag steel springs.
The graphite - colored aircraft aluminum frame allows for sturdy construction without a lot of weight.
If the fiendishly clever horror sleeper Unfriended is about anything more than its own ingenious construction — the way it seems to credibly unfold, in real time and with great realism, within the frame lines of a laptop computer — it's about how the internet has allowed people to indulge their worst impulses with anonymity and impunity, behaving ways on the web that they never would in «real» life.
However, many school building experts we interviewed are concerned that while government is currently succeeding in delivering schools to incredibly tight budgets, its delivery scheme is also proving to be hugely restrictive in terms of the design and time frames allowed for the construction of new schools.
That said, the body - on - frame construction does lend itself to strength and durability, and the car's all - terrain system has been designed to allow even unskilled drivers to make the most its off - road performance.
Instead, the carbon construction allows the seat frames to be integrated into the load - bearing structure.
For instance, the new aluminum frame manages to save weight (99 pounds, to be exact) while increasing stiffness (by 57 percent) to improve handling and allow construction of a convertible that doesn't require structural reinforcement.
Unibody construction also allows for integration of an advanced safety design that disperses collision forces through more load bearing channels than a traditional body - on - frame truck design.
Utilizing fully boxed frame members for the body sides and rear tailgate frame, the truss - style rear inner construction contributes to the new Ridgeline's more conventional three - box design profile — allowing for the elimination of the buttress - style body structure in the forward portion of the upper bed on the previous model — while contributing to a 28 - percent gain in torsional rigidity versus the previous model.
The body - on - frame construction is even stiffer on the new models than the old, allowing for a slightly stiffer suspension.
The proven body - on - frame construction has allowed this powerful beast to master off - roading.
His digital construction process allows for public interactions and collaborations to bleed from the conception stage of a project into the aesthetics and compositions of each frame.
If someone invented «wood» today it would never be approved as a building material and it certainly wouldn't be allowed to be used as a structural element in frame construction — assuming that frame construction would even be allowed.
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing constructionconstruction
Additional Bedroom \ Separate Bdrm Exit, Amenities \ Fireplace \ No Fireplace, Amenities \ Laundry \ Dryer Included, Amenities \ Laundry \ Inside Laundry, Amenities \ Laundry \ Washer Included, Amenities \ Pool - Private \ No Pool, Approx SqFt Range \ 1, Approx SqFt Range \ 201 - 1, Approx SqFt Range \ 400, Architecture Style: Spanish, Balcony, Bedrooms \ Additional Bedroom \ Separate Bdrm Exit, Bedrooms \ Master Bathroom \ Double Sinks, Bedrooms \ Master Bathroom \ Full Bth Master Bdrm, Bedrooms \ Master Bathroom \ Private Toilet Room, Bedrooms \ Master Bed Size \ Queen, Cable TV Ready, Cable included in rent, Community Features \ Property Description \ North / South Exposure, Construction \ Frame - Wood, Cooling System: Refrigeration Cooling, Deposit Breakdown: Pets \ Call, Dining Area \ Dining in LR \ GR, Dwelling Styles \ Detached, Electricity included in rent, Elementary School: Desert Cove Elementary School, Exterior Features \ Pvt Yrd (s) \ Crtyrd (s), Exterior Stories \ 1, Exterior Type: Stucco, Features \ No Interior Steps, Fencing \ Block, Fireplace \ No Fireplace, Forms Required \ AAR Lease, Forms Required \ Credit Report Other, Fully Refundable Dep \ Security Deposit, Garbage included in rent, HOA \ Rental Info: HOA Paid By \ Landlord, HOA \ Rental Info: HOA Y / N \ Y, Heating system: Electric Heat, High School: Shadow Mountain High School, Internet included in rent, Kitchen Features \ Pantry, Landscaping \ Grass Front, Landscaping \ Yrd Wtring Sys Back, Landscaping \ Yrd Wtring Sys Front, Laundry \ Dryer Included, Laundry \ Inside Laundry, Laundry \ Washer Included, Lease Information \ Management - Owner, Lease Information \ Monthly, Lease Information \ No Smoking Allowed, Lot \ Source Apx Lot SqFt \ County Assessor, MLS Listing ID: 5657252, MLS Name: ARMLS ZDD (ARMLS ZDD), Master Bathroom \ Double Sinks, Master Bathroom \ Full Bth Master Bdrm, Master Bathroom \ Private Toilet Room, Master Bed Size \ Queen, Materials \ Construction \ Frame - Wood, Microwave Oven, Middle School: Shea Middle School, Non-Refundable Dep \ Cleaning Deposit, Other Building Features \ Features \ No Interior Steps, Other Building Features \ Plumbing \ Electric Hot Wtr Htr, Other Building Features \ Unit Style \ All on One Level, Other Building Features \ Window Coverings \ Blinds, Other Building Features \ Windows \ Dual Pane, Other Building Features \ Windows \ Sunscreen (s), Other Exterior Features \ Exterior Features \ Pvt Yrd (s) / Crtyrd (s), Other Exterior Features \ Fencing \ Block, Other Exterior Features \ Landscaping \ Grass Front, Other Exterior Features \ Landscaping \ Yrd Wtring Sys Back, Other Exterior Features \ Landscaping \ Yrd Wtring Sys Front, Other Rooms \ Dining Area \ Dining in LR / GR, Other Rooms \ Great Room, Other Rooms \ Kitchen Features \ Pantry, Other Rooms \ Other Rooms \ Great Room, Other \ Deposit Breakdown: Pets \ Call, Other \ Forms Required \ AAR Lease, Other \ Forms Required \ Credit Report Other, Other \ Fully Refundable Dep \ Security Deposit, Other \ Lease Information \ Management - Owner, Other \ Lease Information \ Monthly, Other \ Lease Information \ No Smoking Allowed, Other \ Non-Refundable Dep \ Cleaning Deposit, Other \ Possession (Rentals) \ Refer to Date Availb, Other \ Prtl Refundable Dep \ Pet Deposit, Other \ Rent Includes \ Dishes, Other \ Rent Includes \ Gardening Service, Other \ Rent Includes \ Linen, Other \ Rent Includes \ Pest Control Svc, Other \ Rent Payable \ Owner, Other \ Services \ City Services, Other \ Source of SqFt \ County Assessor, Plumbing \ Electric Hot Wtr Htr, Pool - Private \ No Pool, Pool \ None, Possession (Rentals) \ Refer to Date Availb, Property Description \ North \ South Exposure, Prtl Refundable Dep \ Pet Deposit, Rent Includes \ Dishes, Rent Includes \ Gardening Service, Rent Includes \ Linen, Rent Includes \ Pest Control Svc, Rent Payable \ Owner, Rental Info: HOA Paid By \ Landlord, Rental Info: HOA Y \ N \ Y, Roof Type: Other, School District: Paradise Valley Unified District (069), Services \ City Services, Sewage included in rent, Sewer \ Sewer - Public, Size \ Approx SqFt Range \ 1, Size \ Approx SqFt Range \ 201 - 1, Size \ Approx SqFt Range \ 400, Size \ Exterior Stories \ 1, Source Apx Lot SqFt \ County Assessor, Source of SqFt \ County Assessor, Spa - Private \ None, Tax Municipality \ Phoenix, Taxes \ Tax Municipality \ Phoenix, Type and Style \ Dwelling Styles \ Detached, Unit Style \ All on One Level, Utilities \ APS, Utilities \ Sewer \ Sewer - Public, Utilities \ Utilities \ APS, Water \ City Water, Water \ Water \ City Water, Water included in rent, Window Coverings \ Blinds, Windows \ Dual Pane, Windows \ Sunscreen (s)
Amenities: Street Lights, Boathouse: No Dock Or Boathouse, Cooling Source: Electric, Cooling Type: Central, Kitchen Equipment: Dishwasher, Kitchen Equipment: Garbage Disposal, ES Bus: Yes, Patio, Out Building, Fees Include: None, Fireplace Location: Family Room, Fireplace Type: Factory Built, HS Bus: Yes, Hardwood Floors, Wall - to - wall Carpet, Walk - in Closet, Kitchen: Solid Surface Counters, List Type: Exclusive Right To Sell, Lot Description: Level Lot, Lot Size: 2 - 1 Acre, MS Bus: Yes, Photo Available: YES, Ownership: Fee Simple, Photo: Broker Will Provide Photo, Parking: Parking Pad, Parking: 2 Car, Rooms: Great Room, SQFT Source: Public Record, State: GA, Share Address with Public Websites: Yes, Include in Auto - Valuation Models: Yes, Allow additional comments: Yes, Share with Public Websites: Yes, Water: Public Water, Equipment: Fire, Amenities: Pool, Cable In Street, Wet Bar, Energy Related: Thermo, Energy Related: Water Heater - gas, Kitchen: Breakfast Area, Kitchen: Walk - in Pantry, Lot Description: Wooded, Lot Description: Private Backyard, Fireplace Type: Gas Starter, Heating Source: Gas, Date Of Possession: Negotiable, Parking: Detached, Parking: Garage, Foyer - Entrance, Rooms: DR - Separate, Rooms: Office, Laundry Type: Room, Showing Instructions: Appt Owner, Style: Traditional, Swift Entry: Yes, Water: Sewer Connected, Construction: Frame, Kitchen Equipment: Refrigerator, Lot Description: Cul De Sac, Rooms: Sun Room, Acreage Source: Public Record, Garden Area, Accessibility: Garage Van Access, Amenities: Tennis Courts, Basement: Crawlspace, Market Code: Available, Rooms: Dining Room Seats 12 +, Stories: Over 2 Stories, Parking: Rear Entrance, Amenities: Walk To Shopping, Heating Type: Other (See Remarks), Amenities: Clubhouse, Equipment: Satellite Dish, source: RETS, Skylight, Special Conditions: Agent Owned, Hot Tub, Accessibility: 32» Doors, Area: FUN1, Elementary School: GA, High School: GA, Middle School: GA, High School: Fulton County, Middle School: Fulton County, Elementary School: Fulton County
a b c d e f g h i j k l m n o p q r s t u v w x y z