Sentences with phrase «gas distribution capacity»

Not exact matches

Natural gas producers are always working to extend their distribution capacity, but in peak times supply facilities can't keep up with demand.
The Company's portfolio of assets includes approximately 24,300 megawatt (MW) of generating capacity; 6,500 miles of electric transmission lines; 57,300 miles of electric distribution lines; 12,200 miles of natural gas transmission, gathering and storage pipeline, and 22,000 miles of gas distribution pipeline, exclusive of service lines.
Tags: anaerobic digestion, biomethane, food waste operators, crop operators, RHI, renewable financial incentives, energy networks association, grid connection, network capacity, future billing methodology, project clocc, gas distribution network, thom koller
Since each of the infrared - absorbing atmospheric gases has its own unique absorption spectrum, the total infrared absorption capacity of the atmosphere is then due to the real - time concentration and distribution of all the gases in the atmosphere, from the surface to the stratosphere.
Options: Stability Control Multi-Function Display Roll Stability Control Impact Sensor Post-Collision Safety System Airbags - Front - Dual Air Conditioning - Front - Single Zone Air Conditioning - Front Airbags - Passenger - Occupant Sensing Deactivation Airbags - Front - Side Airbags - Front - Side Curtain Airbags - Side - Curtain Rollover Sensor Airbags - Rear - Side Curtain Child Seat Anchors Latch System Reading Lights Front Abs Brakes (4 - Wheel) Electronic Brakeforce Distribution Steering Wheel Mounted Controls Cruise Controls Power Steering Multi-Function Remote Keyless Entry Storage Cargo Tie - Down Anchors And Hooks Power Outlet (S) 12V Center Console Front Console With Storage Front And Rear Power Outlet (S) Driver Seat Manual Adjustments: Recline Doors Rear Door Type: Liftgate Keyless Entry Keypad Overhead Console Driver Seat Power Adjustments: 6 Doors Liftgate Window: Manual Flip - Up Exterior Entry Lights Headlights Auto On Warnings And Reminders Low Fuel Level Passenger Seat Manual Adjustments: 4 Roof Rails Black Seats Premium Cloth Upholstery Headlights Auto Delay Off Rear Seats Split Folding Power Door Locks Exterior Mirrors Spotter Mirror Exterior Mirrors Power Mirror Color Black Security Engine Immobilizer Front Suspension Classification: Independent Vanity Mirrors Dual Illuminating Traction Control Passenger Seat Manual Adjustments: Recline Rear Bumper Color Body - Color Body Side Reinforcements Side Impact Door Beams Inside Rearview Mirror Auto - Dimming Rear Seats 60 - 40 Split Bench Exterior Mirrors Manual Folding Seatbelts Seatbelt Pretensioners: Front Front Fog Lights Seatbelts Rear Center Seatbelt: 3 - Point Programmable Safety Key Mykey Front Suspension Type: Macpherson Struts Seats Front Seat Type: Bucket Rear Seats Rear Heat: Vents One - Touch Windows: 1 Front Headrests Adjustable Suspension Rear Gas Shock Absorbers Suspension Rear Coil Springs Suspension Front Spring Type: Coil Springs Suspension Front Arm Type: Lower Control Arms Windows Privacy Glass Fuel Consumption: City: 21 Mpg Fuel Consumption: Highway: 28 Mpg Remote Digital Keypad Power Door Locks Power Windows Cruise Controls On Steering Wheel Cruise Control 4 - Wheel Abs Brakes Front Ventilated Disc Brakes 1St And 2Nd Row Curtain Head Airbags Passenger Airbag Side Airbag Digital Audio Input In - Dash Single Cd Player Mp3 Player Am / Fm / Satellite Radio Radio Data System Speed Sensitive Audio Volume Control Total Number Of Speakers: 4 Braking Assist Abs And Driveline Traction Control Stability Control With Anti-Roll Control Privacy Glass: Deep Silver Aluminum Rims Wheel Diameter: 16 Wheel Width: 7 Front Fog / Driving Lights Leather Steering Wheel Trim Urethane Shift Knob Trim Metal - Look Dash Trim Metal - Look Door Trim Metal - Look Center Console Trim Roof Rails Trip Computer External Temperature Display Tachometer Manufacturer's 0 - 60Mph Acceleration Time (Seconds): 8.6 S Auxilliary Transmission Cooler Power Remote Driver Mirror Adjustment Electrochromatic Rearview Mirror Power Remote Passenger Mirror Adjustment Dual Illuminated Vanity Mirrors Compass Rear Window Remote Window Operation Audio Controls On Steering Wheel Front Reading Lights Premium Cloth Seat Upholstery Bucket Front Seats Split Rear Bench Flip Forward Cushion / Seatback Rear Seats Tilt - Adjustable Steering Wheel Speed - Proportional Electric Power Steering Suspension Class: Regular Manual Front Air Conditioning Tire Pressure Monitoring System Remote Activated Exterior Entry Lights Cargo Area Light Max Cargo Capacity: 67 Cu.Ft.
Since each of the infrared - absorbing atmospheric gases has its own unique absorption spectrum, the total infrared absorption capacity of the atmosphere is then due to the real - time concentration and distribution of all the gases in the atmosphere, from the surface to the stratosphere.
The problem in New England, which has resulted in electricity prices that are four times higher than normal for sustained periods, is that all of the pipeline transmission capacity has been purchased by the local gas distribution companies that sell gas for home heating and retail uses.
Tags: California, capacity, commercial, distribution, electricity, generating capacity, industrial, natural gas, net metering, policy, power plants, renewables, residential, solar, states, Texas, wholesale power
As part of their commitment to the Partnership, Partners annually report their SF6 emissions and nameplate capacity estimates to EPA (Note: Under EPA's Greenhouse Gas Reporting Program, Partners with a total nameplate capacity exceeding 17,820 pounds must report emissions and nameplate capacity under subpart DD - Use of Electric Transmission and Distribution Equipment.)
1 Executive Summary 2 Scope of the Report 3 The Case for Hydrogen 3.1 The Drive for Clean Energy 3.2 The Uniqueness of Hydrogen 3.3 Hydrogen's Safety Record 4 Hydrogen Fuel Cells 4.1 Proton Exchange Membrane Fuel Cell 4.2 Fuel Cells and Batteries 4.3 Fuel Cell Systems Durability 4.4 Fuel Cell Vehicles 5 Hydrogen Fueling Infrastructure 5.1 Hydrogen Station Hardware 5.2 Hydrogen Compression and Storage 5.3 Hydrogen Fueling 5.4 Hydrogen Station Capacity 6 Hydrogen Fueling Station Types 6.1 Retail vs. Non-Retail Stations 6.1.1 Retail Hydrogen Stations 6.1.2 Non-Retail Hydrogen Stations 6.2 Mobile Hydrogen Stations 6.2.1 Honda's Smart Hydrogen Station 6.2.2 Nel Hydrogen's RotoLyzer 6.2.3 Others 7 Hydrogen Fueling Protocols 7.1 SAE J2601 7.2 Related Standards 7.3 Fueling Protocols vs. Vehicle Charging 7.4 SAE J2601 vs. SAE J1772 7.5 Ionic Compression 8 Hydrogen Station Rollout Strategy 8.1 Traditional Approaches 8.2 Current Approach 8.3 Factors Impacting Rollouts 8.4 Production and Distribution Scenarios 8.5 Reliability Issues 9 Sources of Hydrogen 9.1 Fossil Fuels 9.2 Renewable Sources 10 Methods of Hydrogen Production 10.1 Production from Non-Renewable Sources 10.1.1 Steam Reforming of Natural Gas 10.1.2 Coal Gasification 10.2 Production from Renewable Sources 10.2.1 Electrolysis 10.2.2 Biomass Gasification 11 Hydrogen Production Scenarios 11.1 Centralized Hydrogen Production 11.2 On - Site Hydrogen Production 11.2.1 On - site Electrolysis 11.2.2 On - Site Steam Methane Reforming 12 Hydrogen Delivery 12.1 Hydrogen Tube Trailers 12.2 Tanker Trucks 12.3 Pipeline Delivery 12.4 Railcars and Barges 13 Hydrogen Stations Cost Factors 13.1 Capital Expenditures 13.2 Operating Expenditures 14 Hydrogen Station Deployments 14.1 Asia - Pacific 14.1.1 Japan 14.1.2 Korea 14.1.3 China 14.1.4 Rest of Asia - Pacific 14.2 Europe, Middle East & Africa (EMEA) 14.2.1 Germany 14.2.2 The U.K. 14.2.3 Nordic Region 14.2.4 Rest of EMEA 14.3 Americas 14.3.1 U.S. West Coast 14.3.2 U.S. East Coast 14.3.3 Canada 14.3.4 Latin America 15 Selected Vendors 15.1 Air Liquide 15.2 Air Products and Chemicals, Inc. 15.3 Ballard Power Systems 15.4 FirstElement Fuel Inc. 15.5 FuelCell Energy, Inc. 15.6 Hydrogenics Corporation 15.7 The Linde Group 15.8 Nel Hydrogen 15.9 Nuvera Fuel Cells 15.10 Praxair 15.11 Proton OnSite / SunHydro 15.11.1 Proton Onsite 15.11.2 SunHydro 16 Market Forecasts 16.1 Overview 16.2 Global Hydrogen Station Market 16.2.1 Hydrogen Station Deployments 16.2.2 Hydrogen Stations Capacity 16.2.3 Hydrogen Station Costs 16.3 Asia - Pacific Hydrogen Station Market 16.3.1 Hydrogen Station Deployments 16.3.2 Hydrogen Stations Capacity 16.3.3 Hydrogen Station Costs 16.4 Europe, Middle East and Africa 16.4.1 Hydrogen Station Deployments 16.4.2 Hydrogen Station Capacity 16.4.3 Hydrogen Station Costs 16.5 Americas 16.5.1 Hydrogen Station Deployments 16.5.2 Hydrogen Station Capacity 16.5.3 Hydrogen Station Costs 17 Conclusions 17.1 Hydrogen as a Fuel 17.2 Rollout of Fuel Cell Vehicles 17.3 Hydrogen Station Deployments 17.4 Funding Requirements 17.5 Customer Experience 17.6 Other Findings
The winter of 2012 - 13 saw spikes in wholesale electricity prices in New England and New York as demand for natural gas from both electric generators and natural gas distribution companies taxed the capacity to bring natural gas into these markets.
ENERGY INDUSTRY Organization: Oil and natural gas - Petroleos de Mexicanos (Pemex), four operating subsidiaries (Exploration and Production, Refining, Gas and Basic Petrochemicals, Secondary Petrochemicals), Petroleos Mexicanos Internacional (PMI); Electric power and distribution - CFE and LFC; Natural gas and electric power regulation - Comission Reguladora de Energia (CRE) Major Ports: Gulf Coast - Cayo Arcos, Dos Bocas, and Pajaritos (handle most of Pemex's oil exports), Tuxpan, Ciudad Madero; Pacific Coast - Salina Cruz, Rosarito Major Oil - Producing Fields: Cantarell, Abkatun, Ku, Caan, Pol, Chuc Major Refineries (Crude Capacity): Salina Cruz (330,000 bbl / d), Tula Hidalgo (320,000 bbl / d), Salamanca (245,000 bbl / d), Cadereyta (275,000 bbl / d), Minatitlan (194,000 bbl / d), Ciudad Madero (320,000 bbl /gas - Petroleos de Mexicanos (Pemex), four operating subsidiaries (Exploration and Production, Refining, Gas and Basic Petrochemicals, Secondary Petrochemicals), Petroleos Mexicanos Internacional (PMI); Electric power and distribution - CFE and LFC; Natural gas and electric power regulation - Comission Reguladora de Energia (CRE) Major Ports: Gulf Coast - Cayo Arcos, Dos Bocas, and Pajaritos (handle most of Pemex's oil exports), Tuxpan, Ciudad Madero; Pacific Coast - Salina Cruz, Rosarito Major Oil - Producing Fields: Cantarell, Abkatun, Ku, Caan, Pol, Chuc Major Refineries (Crude Capacity): Salina Cruz (330,000 bbl / d), Tula Hidalgo (320,000 bbl / d), Salamanca (245,000 bbl / d), Cadereyta (275,000 bbl / d), Minatitlan (194,000 bbl / d), Ciudad Madero (320,000 bbl /Gas and Basic Petrochemicals, Secondary Petrochemicals), Petroleos Mexicanos Internacional (PMI); Electric power and distribution - CFE and LFC; Natural gas and electric power regulation - Comission Reguladora de Energia (CRE) Major Ports: Gulf Coast - Cayo Arcos, Dos Bocas, and Pajaritos (handle most of Pemex's oil exports), Tuxpan, Ciudad Madero; Pacific Coast - Salina Cruz, Rosarito Major Oil - Producing Fields: Cantarell, Abkatun, Ku, Caan, Pol, Chuc Major Refineries (Crude Capacity): Salina Cruz (330,000 bbl / d), Tula Hidalgo (320,000 bbl / d), Salamanca (245,000 bbl / d), Cadereyta (275,000 bbl / d), Minatitlan (194,000 bbl / d), Ciudad Madero (320,000 bbl /gas and electric power regulation - Comission Reguladora de Energia (CRE) Major Ports: Gulf Coast - Cayo Arcos, Dos Bocas, and Pajaritos (handle most of Pemex's oil exports), Tuxpan, Ciudad Madero; Pacific Coast - Salina Cruz, Rosarito Major Oil - Producing Fields: Cantarell, Abkatun, Ku, Caan, Pol, Chuc Major Refineries (Crude Capacity): Salina Cruz (330,000 bbl / d), Tula Hidalgo (320,000 bbl / d), Salamanca (245,000 bbl / d), Cadereyta (275,000 bbl / d), Minatitlan (194,000 bbl / d), Ciudad Madero (320,000 bbl / d)
No evidence exists that New England local gas distribution companies engaged in practices to withhold natural gas pipeline capacity on the Algonquin system to drive up gas or power prices in the region, Federal Energy Regulatory Commission (FERC) staff revealed.
Amidst the constraints which include, human and administrative challenges, damaged, unmaintained or serviced turbines, non-availability of gas, damaged pipelines, vandalism and lack of maintenance there has been a focus on making incremental progress so as to steadily increase the generation, transmission and distribution capacity of the country.
a b c d e f g h i j k l m n o p q r s t u v w x y z