The idea is that the new layer will be used in both aircraft engines and
gas turbines within two years.
Not exact matches
In an H - class
gas turbine, combustion takes place
within 6 - foot - long chambers at high temperature and pressure.
A simulation of combustion
within two adjacent
gas turbine combustors.
The distillers say that with
gas turbines, they could increase their generating capacity from the present 200 megawatts to 3000 megawatts
within 15 years.
Yet with the need to peak emissions
within 10 years,
gas turbines will be unacceptably high in emissions in the short run, unless CCS is part of their utilization.
On average those greenhouse
gases are offset by the clean power the
turbines produce
within 9 months of operation.
He pointed to natural -
gas - fired
turbines at New York University, which kept delivering heat, hot water and electricity during Sandy, as one operating
within Con Ed's region.
Worse, these would need to be inefficient simple - cycle
gas turbines (due to the need to be able to ramp up and down
within minutes if the wind changes) meaning that the CO2 emissions reductions compared to using
gas alone (using more efficient combined - cycle
gas turbines) are negligible.