Using estimates of capital and
generation costs calculated by the Indian government's Integrated Energy Policy - Expert Committee, our report finds that between $ 9.5 billion and 12.7 billion will be required between 2007 and 2012 if the 2012 target is to be met.
Not exact matches
The Cuomo administration estimates the Clean Energy Standard, chiefly its nuclear subsidies, will add an average of $ 2 to residential electric bills, although the Empire Center
calculated the standard would hike the average residential bill by more than $ 2.09 in 2018 and by $ 3.40 in 2021 from added supply
costs alone; compliance with the standard will necessitate major changes to the electrical grid, which will separately drive up customer delivery charges as utilities are forced to accommodate intermittent
generation from solar panels and wind turbines.
We aim to have fresh, lively, contemporary work, but it also has to be affordable in terms of fabrication
costs; it has to be something that can be there for a very long time, for multiple
generations, and we try to
calculate who the best candidates for that might be.
However, these global studies do not assess the ability of variable
generation to meet real hourly demand within a single transmission region, nor do they
calculate the lowest
cost mix of technologies.
-- In
calculating the incremental
cost of compliance of an electric utility under this section, the Secretary shall take into account the reduction, if any, on the
cost of electricity generated with fossil fuels associated with increased reliance on renewable electric energy
generation.
A 2009 study on the negative effects of power
generation by the Australian Academy of Technological Sciences and Engineering (ATSE), «The hidden
costs of electricity: externalities of power
generation in Australia»
calculated the greenhouse impacts and health damage
costs of different power
generation technologies including coal, gas, wind, solar photovoltaic, solar thermal, geothermal, carbon capture and storage, and nuclear energy, and determined that health
costs of burning coal are equivalent to a national health burden of around $ A2.6 billion per annum.
But NEM should not be «consigned to history» until distributed
generation penetrations impose a
calculated and significant
cost shift and the LNBA is «vetted by the market,» he added.
Supposing four hours of pumping at 250MW and eight hours generating at 125MW each day, an effeciency in each operation of 85 % (combined efficiency about 72 %, which I believe is conservative), we can
calculate annual pumping
costs of about $ 64m,
generation income about $ 140m, a gross profit of $ 75m and a pay - back time of 5 years.