An ounce of prevention is worth a pound of cure: when living off the grid, one dollar worth of energy conservation can save three to five dollars in energy
generation equipment costs.
Not exact matches
So - called «next -
generation» sequencing
equipment have dramatically lowered both the
costs and time to prepare samples and do sequencing, making it much easier to sequence an entire viral genome.
«In this study we applied the method to bacterial 16S sequencing but since the
generation of these libraries is easy, flexible and
cost effective — no fancy fluidics
equipment or chemical synthesis of specific barcodes is needed — we are currently applying the assay in a number of other projects.
The second -
generation model delivers a winning blend of space, running
costs,
equipment and value.
At $ 31,790 pre on - road
costs it is a mere $ 1800 below the top - tier VTi - LX, and $ 4000 above the VTi - L — which, in turn, lords it over the VTi - S and the entry - level VTi — and brings an extensive list of standard
equipment including practically everything except the new Honda's latest -
generation safety technology.
Current
generation land - based nuclear reactors
cost $ 10,000,000 per megawatt capacity or about $ 5 billion for the power plant not counting the
cost of the
equipment to convert electricity to fuel.
Renewable
generation equipment [solar and wind] can be cheaper than it currently is, that does not mean it will ever be as cheap as fossil fuels have been sans hidden
costs.
• Adept at overhauling, operation of various torque tools and repairing of rotating
equipment • Familiar with design principles, tools and techniques needed to run and maintain a power
generation plant • Substantial knowledge of various
cost effective techniques to enhance plant productivity
PROFESSIONAL EXPERIENCE Process /
Equipment Engineer — OmniPV, Inc., Menlo Park, CA 2008 — 2011 Collaborated on development of photoluminescent semiconductor material used for third generation solar module, with capability to reduce cost of solar energy to under $ 0.25 / W. Designed and built laboratory for thin film deposition and characterization, purchased equipment worth more than $ 250K from various vendors, successfully negotiated contracts with various vendors and service providers to have laboratory and processes running uni
Equipment Engineer — OmniPV, Inc., Menlo Park, CA 2008 — 2011 Collaborated on development of photoluminescent semiconductor material used for third
generation solar module, with capability to reduce
cost of solar energy to under $ 0.25 / W. Designed and built laboratory for thin film deposition and characterization, purchased
equipment worth more than $ 250K from various vendors, successfully negotiated contracts with various vendors and service providers to have laboratory and processes running uni
equipment worth more than $ 250K from various vendors, successfully negotiated contracts with various vendors and service providers to have laboratory and processes running uninhibited.