Most wind farms typically include hardware for measuring the wind farm's power and frequency at
the grid connection point.
Not exact matches
Experts say there is an animated technical and financial discussion already under way around the North Sea
grid, including whether it is even desirable given the complications of where to place the
grid connections and substations involved as well as some calculations that suggest development of a
grid would be more expensive than simple
point - to -
point connections.
Therein lies a catch - 22 as well; what's the
point in developing a sturdy, affordable device if there's no power
grid to charge it and no internet
connection to run it?
But, of course, you totally ignored the main
point, that the Powerwall is inadequate as a substitute for a
grid connection, and even if one did string 14 Powerwalls together, it would be just about the most expensive and least efficient way to go.
By replacing the combiner boxes here with DC - to - DC converters that step up the voltage from the strings to roughly 10x the string voltage of 1,500 volts, we can dramatically improve the cost of wiring and the resistive losses in the wiring, and by using a very large - scale DC - to - AC converter, which is commonly available in the utility industry (used for
grid ties globally), and by leveraging that pre-existing technology, we can achieve a very good cost structure from the MVDC
point forward to the
grid connection,» according to the CTO.
Although this project was developed to satisfy requirements for a wind site operating within the ERCOT region, it is compatible with any operating wind farm that contains voltage and current transformers at the wind farm feed - in
point (
connection point to the
grid) in any electric reliability council.
Although they may not be directly affected by ransom claims, offshore wind projects located on land belonging to the Crown may be indirectly impacted where access is required over third - party lands for onshore
grid connections or for access to the offshore departure
points.
Therefore, weekly tracking of open issues was required, e.g., securing the cable line
connection between the PV generator, and the
connection point to public
grid, to successfully close the conditions precedent list in due course.