• Cleared work sites by removing
debris and
hazardous materials • Contacted vendors to determine availability to materials and tiles / wood block • Assisted in shaping tiles and wood using power saws to make sure that they fit requirements • Provided support in installing flooring by holding tiles in place and applying adhesives • Filled in
spaces using plaster or putty and ensure that any leftover materials are cleaned away • Performed preventative and regular maintenance on floor laying and finishing equipment