Most all of Saturday was spent in the front yard digging six new
holes for our new plants, hooking up irrigation, and trimming up the existing landscaping.
Southern Co. and its partners have dug 27.5 meters down into that soil to reach bedrock and are now filling up the
hole to provide a stable foundation
for what is likely to be the first of a
new generation of reactors in the U.S.: two
new AP - 1000 models at the Vogtle Electric Generating
Plant that stand next to two older pressurized water reactors, which came online in the 1980s.
The
hole left by the failure of contracts -
for - closure should be replaced with a
new policy to close coal - fired power
plants and replace them with renewable energy.
Foreman and General Foreman over Carpenters
for Generator Change Out and managed work, time schedule, and safety standards
for: Chipping Platform Erection and Scaffolding, Scaffolding
for New Generators Prep in Rub Buildings, Mausoleum Scaffolds, All Tendon Scaffolds, Scaffolds on top of Reactor Dome, All Stair Towers, All Balance of
Plant Scaffolds, All Crane Platforms, Scaffold Tower
for Hydro Blasting
hole in Reactor Wall, All Concrete Form Work to fill
hole in Containment Wall, Concrete Form Mock - up, and material needed in and out of radiological Protected Area.