Meanwhile, the capacity of
interconnector cables linking the UK's grid to others» is set to double, with new schemes to France, the Netherlands, Norway and Belgium in the pipeline.
Concerns have also been raised that the additional power generated by the massive turbines could supply almost the entire capacity of a proposed new
interconnector cable that would transport power to the mainland, meaning no more community schemes could
link up to it.