Sentences with phrase «joists with»

Luckily it was right in the middle of two joists with nothing underneath it — no insulation, no underbelly seal, nothing.
We'll just find the ceiling joists with a stud finder, mark them with chalk lines, and nail gun them into the joists.
Roof: Roadstone black concrete Donard roof tiles, on 50X35mm battens, followed underneath by breathable Pro Clima Solitex underlay, attic trusses as designed by Harmony Timber Engineering fully fitted with 200 mm Knauf Ecosse insulation, fitted between joists with another 150 mm criss crossed over, with a final layer of 100 mm crossed over.
Roof: Roadstone black concrete roof tiles, on 50X35mm battens, followed underneath by breathable Pro Clima Solitex underlay, attic trusses as designed by Shannonside Engineering fully fitted with 100 Knauf Ecose insulation, fitted between joists with another 150 mm criss crossed over, with a final layer of 100 mm crossed over.
Two notable features are the reclaimed floor joists with tons of character from circular saw marks, bark wane, insect holes, and old nail holes, and a built in cubby wall with a live edge pine top that provides a little bit of privacy and safety to the loft, but also lots of useful storage.
Start by laying the drywall on the floor and marking the location of the joists with a pencil.
That makes for a strong, straight I - joist with less thermal bridging.

Not exact matches

We are talking with someone who is getting them structurally tested to use as joists and bearers.»
When Yao moved in, she was dismayed to find that Stamets» old farmhouse was infested with carpenter ants — attracted, ironically, by a white - rot fungus that was crumbling the floor joists.
The X Prize offices in Santa Monica are long and narrow, with a double - high ceiling that has exposed joists and beams.
It is not the exact right way to frame in a closet, but it is sturdy and level (screwed to the ceiling joists and the floor) so I'm ok with it not being perfect in wall building standards — it certainly isn't holding up the house or anything.
With our roots dating back to 1964, JD2 has been instrumental in the development of steel joists,.
Lee Grant does a magnificent job at crafting a villain that's able to hold her own with Columbo and parry his joists.
When the upcoming comedy «The Hangover Part III» wrapped production in January, Warner Bros. was left with tons of used plywood, joists, furniture, faux brick and other materials from the film set.
The large timber joists and roofing beams used in these constructions suggest that trade with the Lebanon was extensive.
Designed for the couple in Montreal, the home library with shelves made entirely from recycled wood and threaded metal rods suspended to the joists.
The Veranda Suite is decorated in golden hues of natural pine and features a bead - board ceiling with exposed joist and dark walnut floors and smooth walls painted with a faux technique.
Within a large, tangled timber frame — tacked together with crisscrossing struts and joists like the jerry - built scaffolding of some demented rollercoaster — hefty industrial - grade orange and black cords suspend five tumbling blocks the size of shipping containers.
The piece spans the width of the exhibition space with entities joisted against opposite walls by a long metal rod that pierces each at its core.
If you prefer really lightweight construction to their Cross-Laminated Timber option, they make a slick I - joist out of Laminated Veneer Lumber with a Masonite - type web, and wood fiber insulation to fill it.
Walls: 360 mm Steico I - joists at 400 mm centres with 360 mm wide timber floor plate.
(clockwise from top left) the ground floor was excavated and rigid insulation placed around the perimeter to cut thermal bridging here; airtightness taping around joist ends; new roof rafters insulated with Icynene spray foam insulation; airtightness detailing to the roof, with Pro Clima Intello membrane under internal battening.
We also cut away all the joist ends, parged the wall and then hung the joists away from the brickwork so they were out of capillary contact with the wall, which will be cooler and potentially damper after internal insulation.»
Roof: 360 mm deep Steico I - joists at max 400 mm centres with a maximum span 5890 mm.
The rim joist is insulated with cavity insulation on the interior and the slab is left uninsulated.
Walls framed with standard 2» X 4» on 16» center stacked on top of floor joists for added strength for roof.
Outside to inside: metal standing seam roofing, WRB, 1/2» plywood, 2x4 on short side purlins, 5/8» Agepan sheathing, 9.5» I joists filled with cellulose, 1/2» plywood taped for air barrier, 2x12 roof joists filed with cellulose, 5/8» drywall.
Outside to inside: cedar siding, 1x4 fir rainscreeen, 1/5» Agepan sheathing, 9.5» vertical wood I - Joists willed with cellulose, 1/2 plywood sheathing taped for air barrier, 2x4 fir studs filled with cellulose, 5/8» drywall.
The rim joist is insulated with cavity insulation on the interior.
The slab is insulated with 2» XPS rigid insulation under slab and the rim joist is insulated with closed - cell spray foam insulation.
Both the floor and the roof are framed with 12 - inch I - joists and insulated with fiberglass.
The slab is insulated with 2» XPS rigid insulation under slab and the rim joist is insulated with closed cell high density spray foam insulation.
Rim joist assembly must be insulated with air impermeable insulation or insulated on the exterior
It is built with 2 × 4 construction on a custom steel trailer with steel floor joists, aluminum rodent resistant underside, radial tires, safety brakes and four leveling jacks.
1 Oscar Baldry getting down to work in the old newsagent's shop; 2 laying Kingspan and Ecotherm insulation in the ground floor of the old shop; 3 first floor metal web joist detailing, with membrane behind the joists for airtightness; 4 ground floor walls feature 50 mm Xtratherm internal insulation; 5 this is followed inside by an Intello vapour control barrier and a further 25 mm Xtratherm; 6 the new timber frame first - floor twin - stud walls and roof rafters are of a fully breathable construction and full - filled with Warmcel cellulose insulation; 7 holes in the timber - frame where the Warmcel insulation was pumped in; 8 a pro clima Intello membrane on the inside of the first - floor walls and roof; 9 and finally, 50 mm Thermafleece (sheep wool) lined service cavity to the interior.
The walls included deep cavity walls insulated with dense - packed cellulose (double stud and I - joist), cavity walls with exterior insulation (polyisocyanurate, XPS, and mineral wool), a ccSPF wall (with 2 × 8 studs), and a «datum» or baseline comparison wall (2 × 6 with cavity insulation)...
Flat roof: 50 mm pea gravel finish on Geotextile membrane, on Resitrix EPDM single ply membrane, on 75 mm Dow Roofmate insulation, on 22 mm WBP plywood, on 200 x 50 metal web joists at 400 centres, with 200 mm mineral wool fitted between metal web over Intello with sealed joints, on 12.5 mm plasterboard and hardwall skim coat.
1 Wolf Easi - Joists in the roof for organised installation of services; 2 Windows bracketed externally onto blocks to reduce cold bridging; 3 The walls are externally insulated with 200 mm Xtratherm platinum EPS 100 insulation; 4 EPS brought up into eaves to meet roof insulation; 5 Airtight parge coat to walls, with Intello membrane to ceiling and battening for the Gypframe ceiling to contain services inside the airtight layer; 6 Cooper Insulation's Wincon unit, which enabled the Linham team to test for obvious air leakage points as they worked.
The walls consist of 1 1/2» XPS rigid insulation and R - 19 cellulose insulation in the stud cavities, with 2» of closed - cell spray foam insulation at the rim joist.
If we were to wrap the floor joists completely with insulation we would warm up the wood thereby lowering the relative humidity the wood «sees» thereby lowering the moisture content.
They are positioned on the first floor of each house and the MVHR inlet and exhaust pass through the roof, with supply and extract fitting within a compact service void just below the trusses, or within the space of the metal web floor joists.
Rim joists should be internally insulated with rigid insulation to control condensation or an air impermeable insulation should be applied to the interior of the rim joist.
Infiltration: Air barrier system is as follows: existing basement slab with two coats of epoxy paint; taped rigid insulation on inside of foundation walls; spray foam at the rim joist; taped housewrap on above grade walls; fully adhered membrane on existing roof sheathing; transitions between roof and above grade walls made by lapping membrane over the housewrap; other transitions made using sealant.
Whole - wall R - value: Using two dimensional heat flow analysis with thermal bridging effects and average framing factors shows that adding the insulation to the exterior of the framing addresses the thermal bridging at the rim joist, studs and top plate.
Here, the polyurethane sprayed around the joists makes a good seal, but the joists are supported in the masonry, with their ends embedded in it.
Foundations aren't meant to be submerged in water, and houses don't like standing up with their roof joists removed.
The lean to roof includes 225 timber joists, which were pumped with cellulose insulation; an Ampac Ampatop Protecta membrane & tapes; and a 100 mm service cavity with Sheep Wool Insulation inside the airtight layer
(clockwise from top left) The ground floor features 400 mm Kore EPS insulation under 100 mm reinforced concrete slab; a Siga Majpell vapour control and airtight layer protects the building against excessive moisture penetration; the 45 mm service cavity fulfilled with mineral wool insulation; airtight detailing to prevent the joist ends causing avoidable infiltration; Ampatop Protecta plus membrane fitted to the roof; the timber frame structure coming together
Roof: Rheinzink Prepatina graphite grey double standing seam onto 22 mm plywood sheeting, on 44 mm battens fixed through to joists, on Ampatop Protecta plus roof membrane, on 500 mm twin timber stud warm roof fulfilled with Springvale Ecobead Platinum insulation, on Siga Majpell vapour control and airtight layer, on 15 mm OSB class 3 board, on 45 mm service cavity fulfilled with mineral wool insulation, on 12.5 mm plasterboard with 3 mm skim coat finish
Twin joist zone pump filled with of high density cellulose insulation, with 40 mm uninsulated service cavity and 12.5 mm plasterboard under.
a b c d e f g h i j k l m n o p q r s t u v w x y z