Sentences with phrase «kitchen during the hot days»

I tend to think of ways to skip the heat of the kitchen during the hot days of summer.

Not exact matches

I turn the heat down at night & it isn't exactly hot in our home during the day in winter — my kefir, left on the kitchen counter, is always bubbly & ready for me in the morning.
Since the weather was still hot during the day, the upstairs den and kitchen area were very hot most of the time, but the downstairs area and all the bedrooms were cool and comfortable.
The downsides of the property were the distance to the beach (about a ten minute walk from town, making it so trips back to the house during the day were difficult), the 3 locked doors to get inside (very secure, but a pain to enter and lock up the house, especially without guidance on which key opened which door), a broken shower (one shower didn't have hot water), and the ants in the kitchen.
It could also be a great addition to an emergency preparedness kit or camping equipment, or even just to help keep the kitchen cool during hot summer days by moving the cooking outside.
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction
a b c d e f g h i j k l m n o p q r s t u v w x y z