Acting for local authorities in connection with the compulsory purchase of land needed for a number of major highway proposals in England and Wales including successfully promoting the South Bristol Link, 5
km of new road South of Bristol.
Not exact matches
The
new 4.8
km link
road will run from junction 34
of the M6 directly to the existing A683 Lancaster and Morecambe Bypass.
On top
of that, it also succeeded in making a
new speed record
of 40
km / h on the Aurora E8 intelligent
road in Muonio, probably setting a
new unofficial world record as well.
Along the
road to Leh, 500
km north
of New Delhi, the Indian government has started to drill one
of the largest tunnels
of the Indian sub-continent.
While the green - themed
new Ecomotive with its
road tax - busting CO2 rating
of just 99g /
km is all about economy and environmental responsibility the 265 PS Cupra R is, undeniably, aimed at ultra-hot hatch enthusiasts with high octane fuel coursing through their veins.
In a 2008
Road & Track comparison test with the
new 2008 Cadillac CTS a 5 - speed automatic transmission equipped G35 sedan achieved a 0 - 60 time
of 5.3 seconds, a 0 - 100 time
of 13.1 seconds and a 1 / 4 - mile time
of 13.8 seconds at 102.9 mph (165.6
km / h).
The same year, the Super Sport fulfilled the strict requirements
of Guinness World Records and set a
new world speed record for
road cars
of 431.072
km / h.
Porsche also quotes a 0 - 200
km / h time
of less than 12.0 sec for its
new concept, which uses an on - demand four - wheel drive system in which the front wheels are driven only during acceleration, under hard driving or on slippery
road surfaces.
After driving around 1,000 kilometers (621 miles) on the highway, single lane country
roads and in the city, the car's onboard computer showed an average
of 12 l / 100
km (19.6 mpg US)- which seems excessive, even for a brand
new car driven quite hard.
Its
new, 65kg - lighter body is the trigger for a bevy
of on -
road improvements, including better fuel economy (as low as 5.3 L / 100
km) and reduced CO2 emissions (119g /
km).
The mountain
road has no less than 99 corners, but that didn't matter, since the Range Rover Sport SVR set a
new unofficial record
of 9 minutes 51 seconds for the 11.3
km ascent, beating the 10 minutes 31 seconds — set by a Ferrari 458 Italia in 2016.
The
new unit emits a more competitive 117g /
km of CO2, which means it qualifies for free
road tax in the first year and attracts a benefit - in - kind taxation
of 17 per cent.
The Trax is composed and quiet on the
road and while severely hampered by the lack
of winter tires, I was able to try the
new AWD system which sends power to the rear wheels during initial acceleration from rest, switching to front - wheel - drive at speeds above 7
km / h.
First things first — the
new X6 retails at RM 718,800 on - the -
road without insurance, inclusive
of 6 % GST, a two - year / unlimited - mileage warranty and a three - year / 60, 000
km BMW Service + Repair Inclusive package.
Presented for the first time in the
new BMW i3s (270 N · m at 0 rpm, 135 kW / 184 HP, power consumption combined in European NEFZ test - cycle *: 14.3 kWh / 100
km; CO2 emissions combined: 0 g /
km), the system improves traction and driving stability in adverse weather and
road conditions when pulling away, in active Brake Energy Regeneration phases and when accelerating out
of tight corners.
Available in just one variant — 220i Luxury — the 2 GT is priced at RM 279,800 on - the -
road without insurance, inclusive
of BMW Malaysia's
new five - year, unlimited - mileage warranty with a five - year / 100, 000
km free service package.
The Nunavut government is spearheading an initiative to construct a
new dock and more than 200
km of all - weather
road at Bathurst Inlet.
This is an excursion to Machu Picchu, by bus and train, which allows you to discover quite different places in their geography, by the Cusco / Quillabamba asphalted
road and village
of Santa Teresa; the
new access way to Machu Picchu, at just 30 minutes by bus, to the Hidroeléctrica train station and 10
km.
Hotel Complex «Avalon» is a contemporary complex with superb architectural style.The
new hotel Complex «Avalon» is situated in the west part
of the famous Black Sea Resort — Sunny Beach / opposite
of Meridian hotel on the mine
road, 150 m. from the beach and 800 m. from the resort centre, on 1,5
km.
It is located on the southernmost end
of Edinburgh's
New Town and it extends for around 1 mile (1.6
km) having his east end at the junction with North Bridge and his west end at the junction with Lothian
Road.
Clicking around for the most precise
of the three positions (Ed's Gaspe) pointed to an area about 200 meters northwest
of the end
of what appeared to be a «J» shaped logging or tree farm access
road about 35 - 40
km north (as the crow flies)
of the point where Quebec 299 intersects with 132 near
New Richmond.
(Sydney's
Roads and Traffic Authority, RTA, also has their Action for Bikes: BikePlan 2010, but it's tough to deliver the promised 200
km of new cycleways annually, while cutting funding and proposing to instead close bike paths.)