Not exact matches
Such risks, uncertainties
and other factors include, without limitation: (1) the effect of economic conditions in the industries
and markets in which United Technologies
and Rockwell Collins operate in the U.S.
and globally
and any changes therein, including financial market conditions, fluctuations in commodity prices, interest rates
and foreign currency exchange rates, levels of end market demand in
construction and in both the commercial
and defense segments of the aerospace industry, levels of air travel, financial condition of commercial airlines, the impact of weather conditions
and natural disasters
and the financial condition of our customers
and suppliers; (2) challenges in the development, production, delivery, support, performance
and realization of the anticipated benefits of advanced technologies
and new products
and services; (3) the scope, nature, impact or timing of acquisition
and divestiture or restructuring activity, including the pending acquisition of Rockwell Collins, including among other things integration of acquired businesses into United Technologies» existing businesses
and realization of synergies
and opportunities for growth
and innovation; (4) future timing
and levels of indebtedness, including indebtedness expected to be incurred by United Technologies in connection with the pending Rockwell Collins acquisition,
and capital spending
and research
and development spending, including in connection with the pending Rockwell Collins acquisition; (5) future availability of credit
and factors that may affect such availability, including credit market conditions
and our capital structure; (6) the timing
and scope of future repurchases of United Technologies» common stock, which may be suspended at any time due to various factors, including market conditions
and the level of other investing activities
and uses of cash, including in connection with the proposed acquisition of Rockwell; (7) delays
and disruption in delivery of
materials and services from suppliers; (8) company
and customer - directed cost reduction efforts
and restructuring costs
and savings
and other consequences thereof; (9) new business
and investment opportunities; (10) our ability to realize the intended benefits of organizational changes; (11) the anticipated benefits of diversification
and balance of operations across product lines, regions
and industries; (12) the outcome of legal proceedings, investigations
and other contingencies; (13) pension plan assumptions
and future contributions; (14) the impact of the negotiation of collective bargaining agreements
and labor disputes; (15) the effect of changes in political conditions in the U.S.
and other countries in which United Technologies
and Rockwell Collins operate, including the effect of changes in U.S. trade policies or the U.K.'s pending withdrawal from the EU, on general market conditions, global trade policies
and currency exchange rates in the near term
and beyond; (16) the effect of changes in tax (including U.S. tax reform enacted on December 22, 2017, which is commonly referred to as the Tax Cuts
and Jobs Act of 2017), environmental, regulatory (including among other things import / export)
and other laws
and regulations in the U.S.
and other countries in which United Technologies
and Rockwell Collins operate; (17) the ability of United Technologies
and Rockwell Collins to receive the required regulatory approvals (
and the risk that such approvals may result in the imposition of conditions that could adversely affect the combined company or the expected benefits of the merger)
and to satisfy the other conditions to the closing of the pending acquisition on a timely basis or at all; (18) the occurrence of events that may give rise to a right of one or both of United Technologies or Rockwell Collins to terminate the merger agreement, including in circumstances that might require Rockwell Collins to pay a termination fee of $ 695 million to United Technologies or $ 50 million of expense reimbursement; (19) negative effects of the announcement or the completion of the merger on the market price of United Technologies»
and / or Rockwell Collins» common stock
and / or on their respective financial performance; (20) risks related to Rockwell Collins
and United Technologies being restricted in their operation of their businesses while the merger agreement is in effect; (21) risks relating to the value of the United Technologies» shares to be issued in connection with the pending Rockwell acquisition, significant merger costs
and / or unknown liabilities; (22) risks associated with third party contracts containing consent
and / or other provisions that may be triggered by the Rockwell merger agreement; (23) risks associated with merger - related litigation or appraisal proceedings;
and (24) the ability of United Technologies
and Rockwell Collins, or the combined company, to retain
and hire key personnel.
The fees are one of many factors driving up the cost of buying or renting a home, including income inequality, restrictive zoning, low
construction productivity, a historic slowdown in housing production,
and high prices for land,
materials,
and labor.
And construction costs — including materials and labor — rose nearly 4.5 percent in New York City in March from a year earlier, according to figures from national construction news magazine Engineering News - Reco
And construction costs — including
materials and labor — rose nearly 4.5 percent in New York City in March from a year earlier, according to figures from national construction news magazine Engineering News - Reco
and labor — rose nearly 4.5 percent in New York City in March from a year earlier, according to figures from national
construction news magazine Engineering News - Record.
The increase in
materials and in
labor charges will put a huge increase in the cost of
construction.
The nonprofit received a lot of help from corporations such as
construction company Hayner Hoyt, who engaged subcontractors to provide free to low cost
labor and materials.
This leads to spikes in the cost of
labor and construction materials just when you need them the most.
2016 «
Construction Site,» McKenzie Fine Art, New York, NY 2016 «Low Entropy,» 245 Varet St., Brooklyn NY * 2016 «Constructing Ornament,» solo show, Robert Henry Contemporary, Brooklyn, NY 2014 «Fluid,» Newhouse Gallery, Snug Harbor Arts Center, Staten Island, NY * 2013 «
Material Handling,» Solo show, Robert Henry Contemporary, Brooklyn, NY 2011 «Parts
and Labor,» Abrons Art Center, New York, NY * 2011 Solo Show, RHV Fine Art, Brooklyn, NY 2008 «Infrastructure,» Vertexlist, Brooklyn, NY 2008 «Neo-Constructivism,» Paul Robeson Galleries, Rutgers University, Newark, NJ 2008 «Trellis,» Rupert Ravens Contemporary, Newark, NJ 2007 «Workspace Program 2001 - 2007,» Dieu Donne Papermill, New York, NY 2007 «The Building Show,» Exit Art, New York, NY 2005 Socrates Sculpture Park, EAFO5, Long Island City, NY 2005 Project Diversity, Rongio Gallery
and Tastes Like Chicken Artspace, Brooklyn, NY 2005 «Subversion,» PS122, New York, NY 2004 «Artists in the Marketplace,» Bronx Museum of the Arts, Bronx, NY 2003 «Formed to Function?»
The exhibition's title, «Time
and Materials (and Overhead)», is a common type of construction contract which requires payment on exactly these terms: the cost of time (labor - hours) and of materials the two basic necessities for physical creation of
Materials (
and Overhead)», is a common type of
construction contract which requires payment on exactly these terms: the cost of time (
labor - hours)
and of
materials the two basic necessities for physical creation of
materials the two basic necessities for physical creation of any kind.
The panel will also explore issues surrounding, but not limited to: politics
and material use; themes of displacement, migration,
and dislocation; identity
construction and otherness;
and the relationships between
labor, domesticity,
and gender
and how these issues are integrated into a movement towards highly experimental projects that challenge traditional notions of craft.
Ochoa's drawings, photography, public interventions,
and sculptures move beyond his
material's direct references to
construction and labor in order to generate critical associations between aesthetics, architecture,
and class.
Known for salvaging raw, gritty
materials such as
construction supplies, Overton will deconstruct
and reconfigure a used pickup truck to reference themes such as farming
and physical
labor.
New coal plants cost three to four times as much as they did three years ago, due to the embedded cost of petroleum
and natural gas in plant
construction,
materials and labor.
Toilets for People, in partnership with local NGO's, offers on - location programs which include training
and composting toilet
construction & installation using local
materials and labor.
And, this is accomplished without a construction cost penalty thanks to all of the material and labor savings techniques incorporated in the house desi
And, this is accomplished without a
construction cost penalty thanks to all of the
material and labor savings techniques incorporated in the house desi
and labor savings techniques incorporated in the house design.
Donovan Rypkema has noted that renovation
and restoration uses twice as much
labor,
and half as much
material as new
construction; with windows, it is almost 100 percent labour
and it is pretty much all local.
The
construction budget for each 1,400 - square - foot unit is about $ 250,000 — an amount that reflects pricey
labor costs in the nation's capital
and special
materials.
Our
construction lawyers regularly handle disputes about delays,
labor inefficiencies, payment,
materials,
construction defects, payment bonds, performance bonds, foreclosure of mechanics liens
and defective design, among others.
Construction projects are typically expensive,
and companies have to supply
materials and labor first
and get paid second.
Katie Kimball, a spokesperson for the American Insurance Association, recommends that you monitor the costs of
construction materials and labor periodically.
Replacement cost estimates are influenced by supply of
labor, demand for
labor,
and the cost of
construction materials.
In fact, he says homeowners may instead need to increase their level of coverage over time, to account for inflation in the costs of
construction materials and labor.
That means that the
construction materials,
labor and time of the Panama City contractor will all be covered because you have plenty of Panama City renters insurance in place.
Assigned the tasks of developing budgets,
material, estimating
labor and project
construction costs
Analyzes blueprints, specification, proposals
and other
construction documents to prepare time, cost,
materials and labor estimates for bidding
construction projects.
Developed definitive
construction cost estimates based on the analysis of project documentation such as drawings
and specifications while incorporating project variables such as
labor and materials.
KeyHighlights: • Successfully served as project manager for the renovation
and construction of a 100 - year old family dude ranch in Wapiti, WY, which was completed on time
and 5 % under budget, despite major design challenges,
material and labor issues.
Architectural managers usually provide consultation services to clients to recommend
materials and labor requirements for a
construction.
Prepared
Construction Cost Estimates, Bills of Quantities,
Labor and Material Schedules
and Cost Analysis Reports for residential buildings, office complexes
and commercial buildings.
Analyzed blueprints, specifications, proposals,
and other
construction documents to prepare time, cost,
materials,
and labor estimates for ongoing projects.
Final inspection of
construction work orders to ensure restoration
and assure
labor,
materials,
and equipment met technical specifications
Construction Superintendent, November 2005 to June 2009 Harthouse Construction Company - New Cityland, CA • Produced construction project budgets by conducting cost estimates and determining necessary resources, materials and labor • Supervised worksite, delegated assignments to workers and directed daily construction • Developed scheduling and construction plans
Construction Superintendent, November 2005 to June 2009 Harthouse
Construction Company - New Cityland, CA • Produced construction project budgets by conducting cost estimates and determining necessary resources, materials and labor • Supervised worksite, delegated assignments to workers and directed daily construction • Developed scheduling and construction plans
Construction Company - New Cityland, CA • Produced
construction project budgets by conducting cost estimates and determining necessary resources, materials and labor • Supervised worksite, delegated assignments to workers and directed daily construction • Developed scheduling and construction plans
construction project budgets by conducting cost estimates
and determining necessary resources,
materials and labor • Supervised worksite, delegated assignments to workers
and directed daily
construction • Developed scheduling and construction plans
construction • Developed scheduling
and construction plans
construction plans for projects
Accurately identify
labor,
material,
and time requirements by studying proposals, specifications,
construction plans,
and associated documents.
PROFESSIONAL SUMMARY: o Engineer candidate whose background includes experience in estimate
labor,
material, or
construction costs for budget preparation purposes o Exposure to testing, modifying developmental
and operational electrical machinery, electrical control equipment, circuitry in industrial
and commercial plants or laboratories.
Cleaned all
construction areas to avoid hazards.Mixed
and laid concrete to raise top of manhole to the street level.Mixed mortar, plaster
and grout according to standard formulas.Performed heavy
labor such as ditch digging, paving
and hauling.Mentored junior team members, providing guidance on proper techniques
and safety.Installed, repaired
and rebuilt tile, brick
and stone surfaces.Used grouting trowels to apply grout between joints of bricks
and tiles.Continually cleaned work areas
and equipment.Arranged
and stored
materials, machines, tools
and equipment.Cut
materials to specified sizes for installation using power saws
and tile cutters.Transported
materials, tools
and machines to installation sites.Used a pick
and shovel to dig, spread
and level dirt
and gravel.
Coordinated all department functions for team of 4 employees.Verified
and logged in deadlines.Cleaned all
construction areas to avoid hazards.Continually cleaned work areas
and equipment.Arranged
and stored
materials, machines, tools
and equipment.Used a pick
and shovel to dig, spread
and level dirt
and gravel.Performed heavy
labor such as ditch digging, hauling, sawing.
Labor costs alone have increased 4 % to 5 %, while building
materials and subcontractor rates are pushing total
construction costs upward of 20 %.
Since cheaper
labor,
materials and land weren't cost - trimming options, Crate & Barrel turned to BIM to help streamline its design
and construction efforts, Moebes says.
Expect shortages
and price increases in
construction material and shortages in
labor.
«However, they need to manage supply - side
construction hurdles, such as shortages of
labor and lots
and building
material price increases.»
Furthermore, there are significant additional risks in the
construction process, as the eventual cost of the project may prove to be higher than what was budgeted originally due to delays
and increases in the cost of
construction materials and labor.
According to American Institute of Architects, despite
labor shortages
and rising
material costs that continue to impact the
construction sector,
construction spending for nonresidential buildings in the U.S. is projected to increase 4 % this year
and continue at that pace of growth through 2019.
By working together in the planning phase of a project we can advise you on design
and construction methods that increase the structure's strength
and efficiency while decreasing
material and labor costs.
Construction cost figures include
labor,
material, subtrades,
and contractor overhead
and profit.
So if it would beneficial not to include the
construction company then I won't but if it's a win - win for both me / taxes
and Dan's co. then we will use his company in the mix - write checks to his company for
material,
labor, etc...
Supply of housing has been extremely tight, so this presentation seeks to shed light on the factors impeding the
construction of more homes to meet demand, especially rising
material cost
and labor supply constraints.