There are plenty of opportunities to
land a Cost Engineer job position, but it won't just be handed to you.
Not exact matches
Like Elon Musk's company, Blue Origin is
engineering its rockets to safely
land back on earth so they can be reused, thus shaving tens of millions of dollars off the
cost of each launch.
Projects must be identified,
cost - sharing with local governments negotiated,
engineering studies conducted, budgets set and
land acquired before a shovel ever strikes the dirt.
The proposal would allocate portions of the
cost of
engineering services to design and prepare construction plans for public improvements, such as roads, sewer and water lines, sidewalks and streetlights, according to the amount of
land owned.
But construction,
engineering and
land purchase
costs came in at $ 9.5 million, 20 percent of which was part of a contingency plan required by the New York State Comptroller, officials said.
costs» means amounts substantially all of which are paid by, or for the account of, an obligor in connection with a project, including the
cost of» (A) development phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, permitting, preliminary
engineering and design work, and other preconstruction activities;» (B) construction, reconstruction, rehabilitation, replacement, and acquisition of real property (including
land relating to the project and improvements to
land), environmental mitigation, construction contingencies, and acquisition of equipment; and» (C) capitalized interest necessary to meet market requirements, reasonably required reserve funds, capital issuance expenses, and other carrying
costs during construction.»
You'd think
Land Rover's manufacturers would have given up the
cost and effort of
engineering the Range Rover, which can
cost as much as $ 100,000, to go off - road, but they didn't.
Damage to your
land, such as landscaping or a sinkhole, are also are usually not covered but some policies include «
engineering cost» options which these would fall under.
San Francisco - based consulting and
engineering firm URS will conduct the study, which Newsom announced Tuesday, and assess the best time to harness wave - energy, the
costs associated with transmitting energy from ocean to
land and the efficacy of existing technologies, among other subjects.
The storeage needed to st cinvert and regenerate elctricity for even a week is simply off the dial, never mind the
land and resource use to generate it, and we have far better solutions on evry measure of
costed engineering, we don't need irenewables, unless its deep rock hydro or desert solar, or off the grid.
Lead Civil
Engineer —
Land Development Solutions — Denver, Colorado — September 2011 — March 2015 • Supervised the civil
engineering development team in the implementation of new projects • Used specialized tools such as AutoCAD, Trimble Terramodel, and Primavera P6 Professional • Calculated requirements used in the plan and design of civil work according to specifications • Ensured safety and compliance standards were met by monitoring and assessing risk factors • Forecasted the quantity, budget, and
cost of
engineering equipment, labor, and manpowerCivil
Engineer — UWV Foundation — Cheyenne, Wyoming — July 2000 — April 2006 • Completed site surveys and analyzed data • Researched, assessed, and studied patterns of elements and environmental conditions to determine adequacy of relevant factors • Ensured compliance with safety standards and managed risk factors • Tested strength of various foundation materials, introducing 25 - percent stronger materials • Developed solutions to safely address challenges involving extreme weather patterns
Marketable Transferable Skills Hands - on construction trades, project management, construction
engineering, field survey,
land - use, estimating,
cost control, planning, scheduling and construction management skills with basic thinking, resource man...
Soft
costs paid by the borrower, such as
engineering costs, governmental fees, developer fees, etc., can be counted toward equity if they contribute to the completion and value of the developed property, but alternative collateral such as
land, purchase deposits and the proceeds of other loans can not.