Sentences with phrase «land a cost engineer»

There are plenty of opportunities to land a Cost Engineer job position, but it won't just be handed to you.

Not exact matches

Like Elon Musk's company, Blue Origin is engineering its rockets to safely land back on earth so they can be reused, thus shaving tens of millions of dollars off the cost of each launch.
Projects must be identified, cost - sharing with local governments negotiated, engineering studies conducted, budgets set and land acquired before a shovel ever strikes the dirt.
The proposal would allocate portions of the cost of engineering services to design and prepare construction plans for public improvements, such as roads, sewer and water lines, sidewalks and streetlights, according to the amount of land owned.
But construction, engineering and land purchase costs came in at $ 9.5 million, 20 percent of which was part of a contingency plan required by the New York State Comptroller, officials said.
costs» means amounts substantially all of which are paid by, or for the account of, an obligor in connection with a project, including the cost of» (A) development phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, permitting, preliminary engineering and design work, and other preconstruction activities;» (B) construction, reconstruction, rehabilitation, replacement, and acquisition of real property (including land relating to the project and improvements to land), environmental mitigation, construction contingencies, and acquisition of equipment; and» (C) capitalized interest necessary to meet market requirements, reasonably required reserve funds, capital issuance expenses, and other carrying costs during construction.»
You'd think Land Rover's manufacturers would have given up the cost and effort of engineering the Range Rover, which can cost as much as $ 100,000, to go off - road, but they didn't.
Damage to your land, such as landscaping or a sinkhole, are also are usually not covered but some policies include «engineering cost» options which these would fall under.
San Francisco - based consulting and engineering firm URS will conduct the study, which Newsom announced Tuesday, and assess the best time to harness wave - energy, the costs associated with transmitting energy from ocean to land and the efficacy of existing technologies, among other subjects.
The storeage needed to st cinvert and regenerate elctricity for even a week is simply off the dial, never mind the land and resource use to generate it, and we have far better solutions on evry measure of costed engineering, we don't need irenewables, unless its deep rock hydro or desert solar, or off the grid.
Lead Civil EngineerLand Development Solutions — Denver, Colorado — September 2011 — March 2015 • Supervised the civil engineering development team in the implementation of new projects • Used specialized tools such as AutoCAD, Trimble Terramodel, and Primavera P6 Professional • Calculated requirements used in the plan and design of civil work according to specifications • Ensured safety and compliance standards were met by monitoring and assessing risk factors • Forecasted the quantity, budget, and cost of engineering equipment, labor, and manpowerCivil Engineer — UWV Foundation — Cheyenne, Wyoming — July 2000 — April 2006 • Completed site surveys and analyzed data • Researched, assessed, and studied patterns of elements and environmental conditions to determine adequacy of relevant factors • Ensured compliance with safety standards and managed risk factors • Tested strength of various foundation materials, introducing 25 - percent stronger materials • Developed solutions to safely address challenges involving extreme weather patterns
Marketable Transferable Skills Hands - on construction trades, project management, construction engineering, field survey, land - use, estimating, cost control, planning, scheduling and construction management skills with basic thinking, resource man...
Soft costs paid by the borrower, such as engineering costs, governmental fees, developer fees, etc., can be counted toward equity if they contribute to the completion and value of the developed property, but alternative collateral such as land, purchase deposits and the proceeds of other loans can not.
a b c d e f g h i j k l m n o p q r s t u v w x y z