The next FCEV from Hyundai Motor Group will have a driving range of 800 km, a maximum power output of 163PS, and
the largest hydrogen storage density of any Fuel Cell vehicle on the market.
Not exact matches
Practical onboard
storage would, of course, constitute only half the formula for a successful
hydrogen economy; the other half would be a
large - scale
hydrogen distribution and refueling network.
Large - scale
storage of low - pressure, gaseous
hydrogen in salt caverns and other underground sites for transportation fuel and grid - scale energy applications offers several advantages over above - ground
storage, says a recent Sandia National Laboratories study sponsored by the Department of Energy's Fuel Cell Technologies Office.
Geologic
storage of
hydrogen gas could make it possible to produce and distribute
large quantities of
hydrogen fuel for the growing fuel cell electric vehicle market, the researchers concluded.
Additionally, installation of electrolyzer systems on electrical grids for power - to - gas applications, which integrate renewable energy, grid services and energy
storage will require
large - capacity, cost - effective
hydrogen storage.
Currently, a
large on - site
hydrogen storage tank fills those needs and is refilled with
hydrogen produced elsewhere and shipped in by Air Liquide.
And newer technologies like
large - scale battery
storage and production of
hydrogen are becoming economic, because they harness cheap power from excess renewable capacity.
The best of both worlds can be achieved by prolonging the oil import era until the mid 2020s, and then shifting progressively to
large - scale
hydrogen imports — first for baseload power, then for
storage and load balancing of intermittent renewables.
Hydrogen storage has been studied and supposedly some adsorptive materials have been developed to hold the gas in
large amounts reducing the need for heavy duty containers.
Engineering & Inspections (Kapolei, HI) 10/2002 — 06/2003 Pressure Equipment Inspector • Perform pressure equipment inspections to the requirements of API - 653, 510 and 570 • Inspect
large above ground
storage tanks monitoring repairs to the requirements of API - 650 / 653 • Finish 400 piping system inspections in less than 2.5 months and identify hundreds of non-conformities • Finish inspection of 20
large above ground
storage tanks (AST) and identify numerous service induced non-conformities • Complete the remaining pressure vessel inspections for 2003 and identify several potentially catastrophic anomalies • Write repair procedure for high pressure
hydrogen compressor bottles