Work of persons
laying screeds or technicians working backwards may be facilitated.
Not exact matches
Before a new floor covering can be
laid, allowing the building to be used as before, the
screed has to be replaced or dried.
Overall U-value: 0.58 Floor Before: Original suspended floor (and solid floor in kitchen) with carpets After: Compacted and blinded hardcore sub-base, Primary DPM, 300 mm Platinum EPS at 0.030 conductivity, second DPM / separating layer, 100 mm concrete slab on blinded sub-base, 40 mm floating
screed laid directly onto slab, Membranes and slab taped and sealed to wall plaster using Pro Clima products including DA - S.
If this isn't the case, you'll either have to take up existing flooring and
lay new —
screed is best with the underfloor system
laid on top — or add a floating floor to accommodate the piping.