The less loaded terms «international» and «transnational» allow a more open discussion.
Maybe «different» is
a less loaded term.
Not exact matches
1) i hear you stating your point of departure / «end of the line» / etc. & admitting — for you — that this is a somewhat arbitrary thing... or, at the very least, requires «faith»... for lack of a
less -
loaded term.
Perhaps he would have ruffled fewer people's feelings if he had used, like the topologist Rene Thom, a
less obviously
loaded term, such as «the logos» of an entity, which Thom defines as a figure which describes the totality of the regulatory mechanisms of a system.
• Researchers in the MENA countries spent
less than 8 hours teaching during the academic
term; the next - lightest teaching
load was in the Americas, where researchers spent 10.3 hours each week.
In contrast, the
term «glycemic
load» is heard much
less often.
How frequently you train a muscle group is
less important than total weekly volume (number of sets) and intensity (
loads lifted in
terms of % of 1RM).
As far as
load space is concerned, the CX - 3 is unimpressive in
terms of minimum all - seats - up capacity (264 litres, or 42 litres
less than the already - unimpressive figure for the Mazda3 hatch), but handily class competitive when all seats are folded with a total 1174 litres available — the latter quite a bit better than the Mazda3.
To discourage short -
term trading, E * TRADE Securities will charge an Early Redemption Fee of $ 49.99 on redemptions or exchanges of no -
load, no transaction fee funds that are held
less than 90 days.
To discourage short -
term trading, E * TRADE Securities will charge an Early Redemption Fee of $ 49.99 on redemptions or exchanges of no -
load, no - transaction - fee funds that are held for
less than 90 days.
okay here's my two cents worth folks im up for renewal and have just nagotiated a rate 5 yr variable1.75 persent or if i want a five yr fixed at 4.49 still quite a gap between fixed and variable here i believe i have a little lee way here apparently i was only interesed in variable and five yr fixed but i made it absulutly apparent to them that when lock in from a variable i get the whosale discounted rate at that time and written into the contract i kinda believe this the way the market is heading as we head out of ressesion and the bank of canada is going to make there move i believe coming up in june and just to make this firm i do not believe the boc will raise rates in fast mode far from it will be slow process i don't care what the ecconmists are thinking we have to remember manufactering sector is reallt taking a hit on the high dollar and don't forget our niegbours to the south how dependent our canada is with them i believe it will be a slow process a lot of people heve put themselves in a debt
load over these enormously low interest rates but i may be wrong i think a variable is the way to go if you want to work on that princibal at least should i say the say the short to medium
term and betting that the bond markets stay put for the short to medium
term - i have given enough interest to the banks maybe i can pay a little
less at least fot the short to mediun
term here i have not completly decided yet put i think im going variable although i wish my mtge was up a year ago that would have been just great congradulations to all that did.
The Community: The Enumclaw area will benefit from the creation of several long -
term operations jobs, a stronger dairy community, reduced odor,
less chance of manure fecal coliform reaching streams, and reduced nutrient
loading on cropland.
China understands coal can not be the base
load generating fuel for the long
term, but it also needs to invest in coal in the short
term to meet demand that is still
less than 1 / 10th the level used per capita in the United States.
I have had the opportunity to look at long
term climate trends when I worked in Arctic projects, we could see changing ice cover, a trend towards
less multiyear ice, but nobody dared reduce the design basis ice
loads or descriptions we used to design structures and transport vessels.
Also, while the overall fees in a life coverage contract are generally much
less than a managed account in the long run, the fees are front
loaded into the policy making it a poor short
term strategy.
In
terms of validity, we make a factor analysis of the variables and delete the measurement which the factor
loading is
less than 0.4 to make the average variance extracted (AVE) reach more than 0.5, and it shows that the convergent validity of each variable meets the requirements.